The quest to rebuild U.S. shipbuilding capability quickly is premised on partnering with existing shipbuilding powers outside of China, with several recent announcements today solidifying the connection between the two allies.Four separate partnerships were recently announced, three today
The barge Defiant was refloated from the Castillo San Felipe del Morro shoreline in San Juan Harbor, Wednesday at approximately 2:22 a.m., just before high tide.Salvage crews and tugboat operators prepositioned three tugboats and completed all the preparations, including the pressurization of all cargo tanks, voids and compartments in the barge.
The U.S. Coast Guard coordinated the rescue of 27 mariners on Saturday after their Venezuelan-flagged fishing vessel caught fire approximately 500 miles north-northwest of the Galapagos Islands, Ecuador.At 3:51 p.m. PST, Saturday, Rescue Coordination Center Alameda received a notification from the Garmin Search and Rescue Command Center of an SOS distress alert from the 240-foot fishing vessel
In a shipbuilding industry defined by tradition, one new entrant is seeking to rewrite the rules of how naval vessels are designed, built and delivered. Saronic Technologies, founded just three years ago, is racing to create what CEO Dino Mavrookas calls “a next-generation shipbuilding ecosystem” — one capable of delivering unmanned surface vessels (USVs) at the speed and scale the U.S.
Capt. Jonathan Andrechik transferred command of Coast Guard Sector New York to Capt. Doreen McCarthy Monday, during a change-of-command ceremony at Sector New York in Staten Island. Rear Adm. Michael Platt, Commander, Coast Guard Northeast District, presided over the ceremony.Capt. McCarthy reported to Sector New York and has served as the deputy commander since May of 2024.
Saronic and Samsung Heavy Industries (SHI) announced a strategic partnership to accelerate the development of autonomy-capable maritime systems and technologies to strengthen America’s shipbuilding industrial base. Through this partnership, the companies will harness technology and expertise to build the maritime industrial capacity and workforce needed to deliver on American and allied
Saronic has selected Brownsville, Texas, as the site for Port Alpha, a next-generation shipyard the company plans to build to expand U.S. shipbuilding capacity.The company said it plans to invest more than $3 billion in the facility, with construction expected to begin in 2026 and operations scheduled to start in 2028.
The Administration has made American manufacturing, shipbuilding, and supply chain resilience national priorities. The Great Lakes region is home to steel, autos, agriculture, energy infrastructure, defense suppliers, and advanced manufacturing. The St. Lawrence Seaway carries maritime commerce into that region.
Saronic and Castelion have announced plans to join forces to launch a hypersonic vehicle from an unmanned surface vessel. By integrating Castelion’s Blackbeard with Saronic’s Medium Unmanned Surface Vessel (MUSV) Marauder, the two companies offer a powerful, credible option to deter would-be adversaries.
U.S. autonomous vessel developer Saronic is moving to integrate physical AI-driven welding robotics into its Louisiana shipyard operations, launching a collaboration with Path Robotics aimed at accelerating production and modernizing American shipbuilding.The initiative will begin at Saronic’s Franklin, Louisiana facility
The Towing Vessel Inspection Bureau (TVIB) announced that Rio Marine, Inc. has become the first maritime services provider to achieve certification under the American Waterways Operators’ (AWO) Responsible Carrier Program (RCP).The RCP is a safety management system for the tugboat, towboat, and barge industry that sets standards for safety, environmental stewardship, and continuous improvement.
EnQuest completed the removal of the Heather Alpha topsides on August 11.The Allseas-owned Pioneering Spirit heavy lift vessel removed the 15,300 tonne topsides in a single lift, the largest single lift planned in the North Sea this year.EnQuest Decommissioning Director, John Allan, said: “The Pioneering Spirit completed the lift in around 14 seconds