BULWARK

  • General
    • Vessel Name : BULWARK 0
    • Operator : CROWLEY MARINE SERVICES, INC. 0
    • Ships Type (ICST) : 431 0
    • Vessel Type : 36 0
    • Construction : A 0
  • Engine
    • Horsepower rating : 7200 0
  • Location
    • City : VALDEZ 0
    • STATE : AK 0
  • Capacity
    • Net Tonnage : 135 0
  • Size
    • Register length : 127.2 257
    • Regular Breadth : 36.5 257
    • Overall Length : 128.7 257
    • Overall Breadt : 36.5 257
    • Load draft : 18 257
    • Light Draft : 18 257
    • Height : 66 257
  • Other
    • Year : 1976 0
    • EQUIP1 : NONE 0
    • Coast Guard Number : 577084 0

CROWLEY MARINE SERVICES, INC.

  • Area of Operation : PUGET SOUND, ALASKA, HAWAII AND WORLDWIDE 0
  • Principal Commodity : GENERAL FREIGHT AND TOWING 0

OILER NO

  • Type : 74 0
  • Construction : A 0

ADVENTURER

  • Type : 36 0
  • Construction : A 0

AKU

  • Type : 36 0
  • Construction : A 0

AVIK

  • Type : 36 0
  • Construction : A 0

DEFENDER

  • Type : 36 0
  • Construction : A 0

ENSIGN

  • Type : 36 0
  • Construction : A 0

EXPLORER

  • Type : 36 0
  • Construction : A 0

GUARDIAN

  • Type : 36 0
  • Construction : A 0

GUARDSMAN

  • Type : 36 0
  • Construction : A 0

HUNTER

  • Type : 36 0
  • Construction : A 0

INVADER

  • Type : 36 0
  • Construction : A 0

JUDY SNOW

  • Type : 36 0
  • Construction : A 0

KAVIK RIVER

  • Type : 36 0
  • Construction : A 0

KUPARUK RIVER

  • Type : 36 0
  • Construction : A 0

MONITOR

  • Type : 36 0
  • Construction : A 0

NAVIGATOR

  • Type : 36 0
  • Construction : A 0

OCEAN PATHFINDER

  • Type : 36 0
  • Construction : A 0

PATRIARCH

  • Type : 36 0
  • Construction : A 0

PIONEER

  • Type : 36 0
  • Construction : A 0

POINT THOMPSON

  • Type : 36 0
  • Construction : A 0

RANGER

  • Type : 36 0
  • Construction : A 0

SAG RIVER

  • Type : 36 0
  • Construction : A 0

SEA BREEZE

  • Type : 36 0
  • Construction : A 0

SEA HORSE

  • Type : 36 0
  • Construction : A 0

SEA PRINCE

  • Type : 36 0
  • Construction : A 0

SEA VOYAGER

  • Type : 36 0
  • Construction : A 0

SENTINEL

  • Type : 36 0
  • Construction : A 0

SENTRY

  • Type : 36 0
  • Construction : A 0

SIKU

  • Type : 36 0
  • Construction : A 0

STALWART

  • Type : 36 0
  • Construction : A 0

TOOLIK RIVER

  • Type : 36 0
  • Construction : A 0

WARRIOR

  • Type : 36 0
  • Construction : A 0

ARCTIC ENDEAVOR

  • Type : 43 0
  • Construction : A 0

BARGE

  • Type : 43 0
  • Construction : A 0

BC

  • Type : 43 0
  • Construction : A 0

NO

  • Type : 48 0
  • Construction : A 0

VMS

  • Type : 43 0
  • Construction : A 0

EEK

  • Type : 74 0
  • Construction : A 0

NAPAMUTE

  • Type : 74 0
  • Construction : A 0

News

SubChapter M Towboat Rules Six Years Later: "Scorecard is a Mixed Bag"

SubChapter M Towboat Rules Six Years Later: "Scorecard is a Mixed Bag"

The more than half decade that has passed since the inception of the subchapter M towboat rule affords an up-close-and-personal look at how it is going. The scorecard is a mixed bag.More than six years ago, the U.S. Coast Guard (USCG) began inspecting towing vessels for compliance with the new towboat rules; specifically, 46 CFR Subchapter M.

Towboat Sank Due to Watertight Integrity Issues

Towboat Sank Due to Watertight Integrity Issues

The sinking last year of a towing vessel in the Atlantic Ocean was due to a lack of watertight integrity, the National Transportation Safety Board (NTSB) said Tuesday.Jackson Creek Marine's Jacqueline A was transiting the Atlantic Ocean from Virginia to a shipyard in Harvey, La., where the 1981-built vessel was to be brought into compliance with the U.S. Coast Guard's Subchapter M regulations.

America Must Renew its Commitment to Maritime

America Must Renew its Commitment to Maritime

The United States must renew its commitment to a strong, reliable American maritime capability to confront emerging threats. China’s aggressive shipping expansion poses significant challenges to the United States and our allies. Global tensions have highlighted the vulnerability of maritime supply chains

Feadship Launches Project 827, Ready For Outfitting and Sea Trials

Feadship Launches Project 827, Ready For Outfitting and Sea Trials

Feadship celebrates another milestone as Project 827 emerges from the shed at the Amsterdam facility. Measuring 71.76 meters, this forward-thinking yacht is now ready for final outfitting and sea trials.Project 827 features exterior design and styling by Studio De Voogt, with elegant lines and low bulwark.

Gangway Safety Highlighted After Fatal Fall

Gangway Safety Highlighted After Fatal Fall

The UK Marine Accident Investigation Branch (MAIB) has published its report on a fall overboard from the sail training vessel Pelican of London.The incident occurred at 2308 on October 2, 2023 when the volunteer relief cook on Pelican of London fell from the top of the vessel’s gangway into the flooded drydock while under the influence of alcohol.