MOLLY PATRICIA

  • General
    • Vessel Name : MOLLY PATRICIA 0
    • Operator : GENESIS MARINE, LLC 0
    • Ships Type (ICST) : 432 0
    • Vessel Type : 35 0
    • Construction : A 0
  • Engine
    • Horsepower rating : 3150 0
  • Location
    • City : HOUSTON 0
    • STATE : TX 0
  • Capacity
    • Net Tonnage : 237 0
    • Full Load Capacity : 293 232
  • Size
    • Register length : 96 257
    • Regular Breadth : 34 257
    • Overall Length : 100 257
    • Overall Breadt : 34 257
    • Load draft : 9 257
    • Light Draft : 8 257
    • Height : 43.6 257
  • Other
    • Year : 2015 0
    • EQUIP1 : NONE 0
    • Coast Guard Number : 1260302 0

GENESIS MARINE, LLC

  • Area of Operation : ALL INLAND RIVERS MOSTLY - CORPUS TO NEW ORLEANS, PASCAGOULA, SHREVEPORT, ILLINOIS - UPPER TO PINE BEAD 0
  • Principal Commodity : SUBCHAPTER D - GRADE E AND SUBCHAPTER O - DANGEROUS CARGOS 0

ASHLEY DANIELSON

  • Type : 35 0
  • Construction : A 0

BOB DEERE

  • Type : 35 0
  • Construction : A 0

BRIAN LEE TESTE

  • Type : 35 0
  • Construction : A 0

CAPT. DAN PRICE

  • Type : 35 0
  • Construction : A 0

CAPT. GEORGE BRUMLEY

  • Type : 35 0
  • Construction : A 0

CAPT. KIRK COLLETTI

  • Type : 35 0
  • Construction : A 0

CLAY GRIFFIN

  • Type : 35 0
  • Construction : A 0

DAVE ANDERSON

  • Type : 35 0
  • Construction : A 0

DIANNE CHANDLER

  • Type : 35 0
  • Construction : A 0

EAGLE SERVICE

  • Type : 36 0
  • Construction : A 0

ERIE SERVICE

  • Type : 36 0
  • Construction : A 0

FRANK JAHN

  • Type : 35 0
  • Construction : A 0

FREEDOM SERVICE

  • Type : 36 0
  • Construction : A 0

GAYOLYN ANN GRIFFIN

  • Type : 35 0
  • Construction : A 0

GINGER GRIFFIN NEW

  • Type : 35 0
  • Construction : A 0

GULF SERVICE

  • Type : 36 0
  • Construction : A 0

HURON SERVICE

  • Type : 35 0
  • Construction : A 0

JAMES DAVISON

  • Type : 35 0
  • Construction : A 0

KAREN PAPE

  • Type : 35 0
  • Construction : A 0

LIBERTY SERVICE

  • Type : 36 0
  • Construction : A 0

LILLIAN SIMONE GRIFFIN

  • Type : 35 0
  • Construction : A 0

MICHIGAN SERVICE

  • Type : 35 0
  • Construction : A 0

MISS ALLIE

  • Type : 35 0
  • Construction : A 0

MYRTLE E GRIFFIN

  • Type : 35 0
  • Construction : A 0

NATALIE ALEXANDER

  • Type : 35 0
  • Construction : A 0

NATCHEZ EXPRESS

  • Type : 35 0
  • Construction : A 0

PATRICIA ANNE

  • Type : 35 0
  • Construction : A 0

PATRIOT SERVICE

  • Type : 36 0
  • Construction : A 0

RED RIVER EXPRESS

  • Type : 35 0
  • Construction : A 0

RENEE DAVISON

  • Type : 35 0
  • Construction : A 0

SANDRA BRUMLEY

  • Type : 35 0
  • Construction : A 0

SID MOLLER

  • Type : 35 0
  • Construction : A 0

SUPERIOR SERVICE

  • Type : 36 0
  • Construction : A 0

SUSANNAH GRIFFIN

  • Type : 35 0
  • Construction : A 0

ENERGY

  • Type : 74 0
  • Construction : A 0

GM

  • Type : 74 0
  • Construction : A 0

NRC INDEPENDENCE

  • Type : 70 0
  • Construction : A 0

News

Launch Ceremony Held for A-O-S' New Jones Act CTV Gripper

Launch Ceremony Held for A-O-S' New Jones Act CTV Gripper

An official launch ceremony was held to celebrate the commissioning of a new Jones Act compliant crew transfer vessel (CTV) built for American Offshore Services (A-O-S)—the company's first.Constructed by Blount Boats in Warren, R.I., the 100-foot-long aluminum catamaran is owned and operated by A-O-S

Biden's Pier for Gaza Aid Might Not be Ready for 60 Days

Biden's Pier for Gaza Aid Might Not be Ready for 60 Days

U.S. President Joe Biden's plan to build a floating U.S. military port to speed up aid to Gaza could take up to 60 days to become a reality and involve more than 1,000 American troops, the Pentagon said on Friday.The Pentagon offered the timeline a day after Biden announced the initiative in his State of the Union speech

New York Awards Equinor and Orsted New Offshore Wind Contracts

New York Awards Equinor and Orsted New Offshore Wind Contracts

New York officials on Thursday awarded provisional contracts to two proposed offshore wind projects under a program meant to support the embattled industry and keep the state's clean energy goals on track.The state selected a planned 810-megawatt project, Empire Wind 1, (developed by Equinor) and Sunrise Wind, a planned 924-megawatt project (developed by Orsted and Eversource).

BOEM Approves COP for Equinor's Empire Wind Project

BOEM Approves COP for Equinor's Empire Wind Project

The United States’ Bureau of Ocean Energy Management (BOEM) approved the Construction and Operations Plan (COP) for Equinor’s Empire Wind project, marking another milestone in advancing the New York offshore wind project.With this permitting action by BOEM secured, Empire Wind is on track to begin construction in its federal lease area off the southern coast of Long Island later this year.

Master Boat Builders Launches New Tug for Moran Towing

Master Boat Builders Launches New Tug for Moran Towing

Master Boat Builders has launched Patricia B. Moran, a new tugboat it is building for Moran Towing Corporation, based in New Canaan, Conn.The newbuild is one of two 86-foot (LOA) tugs the Coden, Ala. shipbuilder is building for Moran. Ordered in 2022, the tugs were designed by Crowley Engineering Services and will produce a bollard pull of over 55 metric tons.

Liza Unity is First FPSO to Earn ABS REMOTE-CON Notation

Liza Unity is First FPSO to Earn ABS REMOTE-CON Notation

The ABS-classed Liza Unity has received the first REMOTE-CON notation for an floating production storage and offloading (FPSO) from ABS. The notation demonstrates the vessel’s alignment with remote-control functions and signifies that the design and construction of the offshore asset are assessed against and adhere to the ABS Requirements for Autonomous and Remote Control Functions.

Court Battle Between Santos and Traditional Owners Continues

Court Battle Between Santos and Traditional Owners Continues

Santos has issued a statement after the decision of the Federal Court of Australia on November 15 ruling that pipelay activities can commence on an 86-kilometer section of pipeline for the Barossa Gas Export Pipeline (GEP) – but not south of kilometre point 86 (KP86).This southern section would pass to the west of the Tiwi Islands.