TITLETOWN U. S. A.

  • General
    • Vessel Name : TITLETOWN U. S. A.
    • Operator : MARQUETTE TRANSPORTATION COMPANY RIVER LLC
    • Ships Type (ICST) : 432
    • Vessel Type : Pushboat
    • Construction : Steel
  • Engine
    • Horsepower rating : 5600
  • Location
    • City : CHESTER- FIELD
    • STATE : MO
  • Capacity
    • Net Tonnage : 625
    • Full Load Capacity : 919 Short ton
  • Size
    • Register length : 150 Feet
    • Regular Breadth : 48.1 Feet
    • Overall Length : 150 Feet
    • Overall Breadt : 48.1 Feet
    • Load draft : 9 Feet
    • Light Draft : 8 Feet
    • Height : 43 Feet
  • Other
    • Year : 1962
    • EQUIP1 : NONE
    • Coast Guard Number : 289724

MARQUETTE TRANSPORTATION COMPANY RIVER LLC

  • Area of Operation : MISSISSIPPI RIVER AND TRIBUTARIES
  • Principal Commodity : GRAIN, COAL, SALT, FERTILIZER AND ROCK

A STEVE CROWLEY

  • Type : Pushboat
  • Construction : Steel

ALIX ANNE ECKSTEIN

  • Type : Pushboat
  • Construction : Steel

AMY W. BRAMLITT

  • Type : Pushboat
  • Construction : Steel

BERNARD G

  • Type : Tugboat
  • Construction : Steel

BLAKE DENTON

  • Type : Pushboat
  • Construction : Steel

BOOTSIE B.

  • Type : Tugboat
  • Construction : Steel

BRUCE L. HAHN

  • Type : Tugboat
  • Construction : Steel

CAROLINE N.

  • Type : Pushboat
  • Construction : Steel

CHARLIE G

  • Type : Pushboat
  • Construction : Steel

CHRISTOPHER MYSKOWSKI

  • Type : Pushboat
  • Construction : Steel

CINDY L. ERICKSON

  • Type : Pushboat
  • Construction : Steel

CITY OF CASSVILLE

  • Type : Pushboat
  • Construction : Steel

DARIN ADRIAN

  • Type : Pushboat
  • Construction : Steel

DAVID L. FIELDS

  • Type : Pushboat
  • Construction : Steel

GEORGE KING

  • Type : Pushboat
  • Construction : Steel

GOLDEN EAGLE

  • Type : Pushboat
  • Construction : Steel

J. ANDREW ECKSTEIN

  • Type : Pushboat
  • Construction : Steel

JACOB MICHAEL ECKSTEIN

  • Type : Pushboat
  • Construction : Steel

JEFFREY G

  • Type : Pushboat
  • Construction : Steel

JERRY JARRETT

  • Type : Pushboat
  • Construction : Steel

JOHN PAUL ECKSTEIN

  • Type : Pushboat
  • Construction : Steel

JOHNATHAN T. ERICKSON

  • Type : Pushboat
  • Construction : Steel

JOSEPH P. ECKSTEIN

  • Type : Pushboat
  • Construction : Steel

JUSTIN P. ECKSTEIN

  • Type : Pushboat
  • Construction : Steel

KAY A. ECKSTEIN

  • Type : Pushboat
  • Construction : Steel

KELLY RAE ECKSTEIN

  • Type : Pushboat
  • Construction : Steel

LOREE ECKSTEIN

  • Type : Pushboat
  • Construction : Steel

MARQUETTE HILLTOPPER

  • Type : Pushboat
  • Construction : Steel

MARQUETTE WARRIOR

  • Type : Pushboat
  • Construction : Steel

MARY KAY ECKSTEIN

  • Type : Pushboat
  • Construction : Steel

MISS DORIS

  • Type : Pushboat
  • Construction : Steel

MYRA ECKSTEIN

  • Type : Tugboat
  • Construction : Steel

PERE MARQUETTE

  • Type : Pushboat
  • Construction : Steel

RANDY ECKSTEIN

  • Type : Pushboat
  • Construction : Steel

RAY A. ECKSTEIN

  • Type : Pushboat
  • Construction : Steel

RAYMOND GRANT E

  • Type : Pushboat
  • Construction : Steel

RONALD E. WAGENBLAST

  • Type : Pushboat
  • Construction : Steel

SHERRYL B. REEVES

  • Type : Pushboat
  • Construction : Steel

STEPHEN L. COLBY

  • Type : Pushboat
  • Construction : Steel

THERESA L WOOD

  • Type : Pushboat
  • Construction : Steel

THOMAS E. ERICKSON

  • Type : Pushboat
  • Construction : Steel

WISCONSIN

  • Type : Pushboat
  • Construction : Steel

MTC

  • Type : Covered Hopper Barge
  • Construction : Steel

SG

  • Type : Covered Hopper Barge
  • Construction : Steel

SM

  • Type : Covered Hopper Barge
  • Construction : Steel

News

Graney Name President General Dynamics Electric Boat

Graney Name President General Dynamics Electric Boat

General Dynamics (NYSE: GD) appointed General Dynamics NASSCO president Kevin Graney as president of General Dynamics Electric Boat, effective October 1. David J. Carver, NASSCO’s vice president and general manager of repair, will succeed Graney as president of General Dynamics NASSCO.  Jeffrey S. Geiger, who has served as president of Electric Boat since 2013, will retire effective September 30.

DNV GL Route Map for Energy Transition

DNV GL Route Map for Energy Transition

Gas and variable renewables  must work together alongside greater uptake of carbon capture and storage (CCS) to secure a rapid energy transition, according to a new forecast of the energy transition by DNV GL.According to the report '2019 Energy Transition Outlook' published by the international accredited registrar and classification society

NTSB Weighs in on McCain Collision

NTSB Weighs in on McCain Collision

Insufficient Training, Inadequate Bridge Operating Procedures, Lack of Operational Oversight Led to Fatal Ship Collision. The National Transportation Safety Board said Monday that the Aug. 21, 2017, collision between the USS John S McCain and the tanker Alnic MC was caused by insufficient training, inadequate bridge operating procedures and a lack of operational oversight.

INLAND FINANCE: But I Don’t Need That Much

INLAND FINANCE: But I Don’t Need That Much

When enough to meet the need is not enough to get the help.From my office window in downtown St. Louis, I can see a dramatic illustration of the inefficiency in how our country moves freight. My office faces east, and I look down on a stretch of Interstate 70, that major east-west highway that runs from Baltimore to Interstate 15 in Utah.

Yang Ming Launches Final Two Mega-Ships

Yang Ming Launches Final Two Mega-Ships

Taiwanese liner Yang Ming Marine Transport Corporation has announced the launch of two new ultra-large container vessels (UCLVs), which were officially named at Imabari shipyard on March 6, 2019.The two ships, YM Warranty and YM Wellspring, have a container capacity of 14,000 TEU and will join the total of 20 UCLVs added to Yang Ming’s fleet since 2015.Yang Ming Marine Transport Corp.

TECH FIRST: 3D Printed Pipe Fitting for Nuclear Aircraft Carrier

TECH FIRST: 3D Printed Pipe Fitting for Nuclear Aircraft Carrier

Newport News Shipbuilding Division Delivers First 3-D Metal Part For Installation On Nuclear-Powered Aircraft CarrierHuntington Ingalls Industries’ (NYSE:HII) Newport News Shipbuilding division achieved a milestone in the integration of additive manufacturing into the design and fabrication of components for nuclear-powered warships.

Mat Boat Sources Sought Notice

Mat Boat Sources Sought Notice

The U.S. Army Corps of Engineers (USACE), Marine Design Center (MDC) will soon be releasing a sources sought notice for the construction of the Mat Boat, a 188 x 74 x 10-ftl. deck barge, for the Mat Sinking Unit (MSU) located on the Mississippi River. The barge is to be built to American Bureau of Shipping (ABS) Rules for Service on Rivers and Intracoastal Waterways.

SNA's "Old Salt" Award Passed to Adm. Davidson

SNA's "Old Salt" Award Passed to Adm. Davidson

Adm. Philip S. Davidson, commander of U.S. Indo-Pacific Command (USINDOPACOM), became the Navy’s newest “Old Salt” during an award presentation Oct. 22 at the Pentagon.The “Old Salt” award is given to the active duty officer who has held the Surface Warfare Officer (SWO) qualification for the longest amount of time."It is a tremendous honor to receive this award.

Paving the Way for 3D Printing in Naval Shipbuilding

Paving the Way for 3D Printing in Naval Shipbuilding

A U.S. shipbuilder’s piloting of new technologies is redefining the future of the naval engineering and shipbuilding industries.Huntington Ingalls Industries’ (HII) Newport News Shipbuilding division, in collaboration with the U.S. Navy, has led the adoption of additive manufacturing of metal components for nuclear-powered warships as part of HII’s digital transformation.

Maersk to Spend $2 Bln to Meet 2020 Sulphur Cap

Maersk to Spend $2 Bln to Meet 2020 Sulphur Cap

Maersk Line said it will introduce a new Bunker Adjustment Factor (BAF) surcharge designed to recover costs of compliance with the global 0.5 percent sulphur cap set to enter into force on January 1, 2020. The Danish container carrier said it expects its extra fuel costs could exceed $2 billion.

VT Halter to Build ATB Tug for Bouchard

VT Halter to Build ATB Tug for Bouchard

Mississippi shipbuilder VT Halter Marine, Inc. said it has secured a new contract to build an articulated tug barge (ATB) tug with an option for a second vessel for Bouchard Transportation Co., Inc.Construction of the new vessel, M/V Evening Stroll, begins immediately at the builder’s Pascagoula, Miss. shipyard, with delivery scheduled for December 2019.

Torm Orders BWTS for 47 Tankers

Torm Orders BWTS for 47 Tankers

Denmark-based product tanker owner and operator TORM has ordered ballast water treatment systems from manufacturer Alfa Laval for 47 of its vessels, including 11 newbuilds.TORM has worked with Alfa Laval’s PureBallast 3 Ex since 2017 and retrofitted its first system in 2018. Having recently ordered PureBallast 3 Ex for newbuild projects in China