DONNA YORK

  • General
    • Vessel Name : DONNA YORK
    • Operator : CROUNSE CORPORATION
    • Ships Type (ICST) : 432
    • Vessel Type : Pushboat
    • Construction : Steel
  • Engine
    • Horsepower rating : 1800
  • Location
    • City : MAYSVILLE
    • STATE : KY
  • Capacity
    • Net Tonnage : 161
  • Size
    • Register length : 102 Feet
    • Regular Breadth : 26 Feet
    • Overall Length : 102 Feet
    • Overall Breadt : 26 Feet
    • Load draft : 8 Feet
    • Light Draft : 7.5 Feet
    • Height : 34 Feet
  • Other
    • Year : 1975
    • EQUIP1 : NONE
    • Coast Guard Number : 563108

CROUNSE CORPORATION

  • Area of Operation : MISSISSIPPI, OHIO, TENNESSEE, CUMBERLAND, GREEN, KANAWHA, MONONGAHELA, LICKING AND BLACK WARRIOR RIVERS AND TENN-TOM WATERWAY
  • Principal Commodity : TOWING, BULK FREIGHT AND COAL

C

  • Type : Open Hopper Barge
  • Construction : Steel

JACKIE ENGLERT

  • Type : Pushboat
  • Construction : Steel

JAMES M. COOMER, III

  • Type : Pushboat
  • Construction : Steel

JANIS R. BREWER

  • Type : Pushboat
  • Construction : Steel

JEAN AKIN

  • Type : Pushboat
  • Construction : Steel

JINCY

  • Type : Pushboat
  • Construction : Steel

LESLIE M NEAL

  • Type : Pushboat
  • Construction : Steel

LINDA LITTLE

  • Type : Pushboat
  • Construction : Steel

LINDA REED

  • Type : Pushboat
  • Construction : Steel

MARY ALICE BAKER

  • Type : Pushboat
  • Construction : Steel

MARY ARTIE BRANNON

  • Type : Pushboat
  • Construction : Steel

NADINE BAKER

  • Type : Pushboat
  • Construction : Steel

NANCY STURGIS

  • Type : Pushboat
  • Construction : Steel

PATSY COLEMAN

  • Type : Pushboat
  • Construction : Steel

PAULA RUBLE

  • Type : Pushboat
  • Construction : Steel

SANDY DRAKE

  • Type : Pushboat
  • Construction : Steel

SUE CHAPPELL

  • Type : Pushboat
  • Construction : Steel

YVONNE CONWAY

  • Type : Pushboat
  • Construction : Steel

ZELDA HUMPHREY

  • Type : Pushboat
  • Construction : Steel

ALICE

  • Type : Pushboat
  • Construction : Steel

BARBARA

  • Type : Pushboat
  • Construction : Steel

BETTY FEAGIN

  • Type : Pushboat
  • Construction : Steel

BUCK BELLOWS

  • Type : Pushboat
  • Construction : Steel

CHRIS

  • Type : Pushboat
  • Construction : Steel

CITY OF MAYSVILLE

  • Type : Pushboat
  • Construction : Steel

DEBI SHARP

  • Type : Pushboat
  • Construction : Steel

DIANE SIEGEL

  • Type : Pushboat
  • Construction : Steel

DOUG TURNER

  • Type : Pushboat
  • Construction : Steel

EDITH TRIPP

  • Type : Pushboat
  • Construction : Steel

ELEANOR

  • Type : Pushboat
  • Construction : Steel

ENID DIBERT

  • Type : Pushboat
  • Construction : Steel

EVA KELLEY

  • Type : Pushboat
  • Construction : Steel

GINGER MOLLER

  • Type : Pushboat
  • Construction : Steel

HAZEL

  • Type : Pushboat
  • Construction : Steel

CC

  • Type : Flat / Deck Barge
  • Construction : Steel

News

Cruise Ship Arrives in New York with 44-foot Whale Carcass on Its Bow

Cruise Ship Arrives in New York with 44-foot Whale Carcass on Its Bow

Marine conservationists and government scientists are seeking clues to the mystery of how a 44-foot whale carcass ended up on the bow of a cruise liner, where it was discovered as the ship approached New York City's Port of Brooklyn over the weekend.A necropsy, the animal equivalent of an autopsy, identified the deceased marine mammal as a mature female sei whale

Containership Loses Power Near New York’s Bayonne Bridge

Containership Loses Power Near New York’s Bayonne Bridge

A containership lost propulsion in a busy New York City waterway just as it was about to pass under the Bayonne Bridge on Friday night—less than two weeks after a presumed power failure caused similarly sized vessel to allide with Baltimore’s Francis Scott Key Bridge.The U.S. Coast Guard said it received a report that the Malta-registered APL Qingdao lost propulsion about 8:30 p.m.

Baltimore Bridge Collapse Highlights Need to Protect Critical Foundations

Baltimore Bridge Collapse Highlights Need to Protect Critical Foundations

The collapse of Baltimore's Key Bridge has highlighted what engineers say is an urgent need to better protect the piers holding up spans over shipping channels as the size of cargo ships has grown in recent decades.Federal authorities continue an investigation into why a massive cargo ship lost power and crashed into a pier of the Francis Scott Key Bridge early Tuesday

Equinor and BP Part Ways on US Offshore Wind Projects

Equinor and BP Part Ways on US Offshore Wind Projects

Norway's Equinor said on Thursday it had entered an agreement with BP BP.L to independently pursue separate wind projects under its bid for New York's offshore wind auctions.As part of the agreement, BP would take over full control of the Beacon Wind project, while Equinor takes over the Empire Wind project, the Norwegian firm said.

Equinor, BP Cancel Contract to Sell Offshore Wind Power to New York

Equinor, BP Cancel Contract to Sell Offshore Wind Power to New York

European energy firms Equinor and BP  terminated their agreement to sell power to New York state from their proposed Empire Wind 2 offshore wind farm, citing rising inflation, higher borrowing costs, and supply chain issues."This agreement reflects changed economic circumstances on an industry-wide scale and repositions an already mature project to continue development in anticipation of new

New York Launches Offshore Wind Solicitation

New York Launches Offshore Wind Solicitation

New York released a new offshore wind solicitation on Thursday to keep the state on track to meet its renewable energy goals and support a nascent industry that has faced financial trouble in recent months.Offshore wind is expected to play a major role in New York's plan to reduce carbon emissions by getting 70% of the state's electricity from renewable sources by 2030.

First Turbine Installed at South Fork Wind Off New York

First Turbine Installed at South Fork Wind Off New York

The first turbine has been installed at the South Fork Wind Farm offshore New York, developer Ørsted announced on Monday.The first of South Fork Wind’s 12 Siemens Gamesa wind turbine generators was hoisted into place by the offshore construction team at the project site 35 miles off Montauk, N.Y. Van Oord’s offshore installation vessel, the Aeolus, is installing the turbines.

Ship Shortage Dealt Death Blow to Orsted's New Jersey Offshore Wind Hopes

Ship Shortage Dealt Death Blow to Orsted's New Jersey Offshore Wind Hopes

Danish energy firm Orsted's shock decision to cancel two offshore wind farms off New Jersey this week was based in large part on big delays securing the ship it needed to build the project, company officials said.The world's biggest offshore wind farm company on Tuesday said it would cease all development on the Ocean Wind projects even as it moves forward with developments off neighboring New

Offshore Wind Developers Likely to Cancel Some Contracts After NY Decision

Offshore Wind Developers Likely to Cancel Some Contracts After NY Decision

Developers in the U.S. offshore wind industry will likely cancel some power sales contracts in New York after the state last week denied passing on more of the costs to consumers, but major projects off Massachusetts and Rhode Island are set to start up later this year.Several states and U.S.

Four Former US Navy Officers Cleared in Fat Leonard Case Due to Prosecutor Misconduct

Four Former US Navy Officers Cleared in Fat Leonard Case Due to Prosecutor Misconduct

Four former U.S. Navy officers charged in a massive bribery scandal linked to the man known as Fat Leonard were cleared of felony charges on Wednesday by a judge citing prosecutor misconduct.U.S. District Judge Janis Sammartino said in a sentencing hearing that prosecutors' conduct "can only be described as outrageous," the San Diego Union-Tribune reported from the courthouse.

CMA CGM Completes New York Terminals Acquisition

CMA CGM Completes New York Terminals Acquisition

CMA CGM announced it has finalized its acquisition of two container terminals in the Port of New York and New Jersey as the France-based shipping and logistics group grows its supply chain presence in the United States.The company announced in December 2022 that it struck a deal to acquire the Bayonne and New York terminals from Canada's Global Container Terminals (GCT).

Boskalis Installs First U.S.-Made Offshore Substation for South Fork Wind Project

Boskalis Installs First U.S.-Made Offshore Substation for South Fork Wind Project

Dutch marine services firm Boskalis said Monday it had completed the installation of the first U.S.-made offshore substation, built for the South Fork Wind offshore wind project.Kiewit built the 1,500-ton, 60-foot-tall substation at its Ingleside facility near Corpus Christi. After installing the foundation and the modular support frame, this week at Ørsted and Eversource’s South Fork Wind