BUD SONIER

  • General
    • Vessel Name : BUD SONIER
    • Operator : LE BEOUF BROS. TOWING, LLC
    • Ships Type (ICST) : 432
    • Vessel Type : Pushboat
    • Construction : Steel
  • Engine
    • Horsepower rating : 1800
  • Location
    • City : HOUMA
    • STATE : LA
  • Capacity
    • Net Tonnage : 64
  • Size
    • Register length : 68.9 Feet
    • Regular Breadth : 30 Feet
    • Overall Length : 68.9 Feet
    • Overall Breadt : 30 Feet
    • Load draft : 8 Feet
    • Light Draft : 8 Feet
    • Height : 39.6 Feet
  • Other
    • Year : 2009
    • EQUIP1 : NONE
    • Coast Guard Number : 1217771

LE BEOUF BROS. TOWING, LLC

  • Area of Operation : INLAND AND INTRACOASTAL WATERWAYS OF LOUISIANA; MISSISSIPPI, OHIO AND ILLINOIS RIVERS; TEXAS AND ALABAMA
  • Principal Commodity : DIESEL, GAS, CRUDE OILS AND ASPHALT

GONSOULIN

  • Type : Other Liquid Cargo Barge Not Elsewhere Included
  • Construction : Steel

KEYWAY

  • Type : Other Liquid Cargo Barge Not Elsewhere Included
  • Construction : Steel

AMERICAN FREEDOM

  • Type : Pushboat
  • Construction : Steel

BEA SONIER

  • Type : Pushboat
  • Construction : Steel

BOO SONIER

  • Type : Pushboat
  • Construction : Steel

C. J. BOYNE

  • Type : Pushboat
  • Construction : Steel

CAPT. PIC NAQUIN

  • Type : Pushboat
  • Construction : Steel

CLAIR S SMITH

  • Type : Pushboat
  • Construction : Steel

CREOLE ANN

  • Type : Pushboat
  • Construction : Steel

CREOLE BELLE

  • Type : Pushboat
  • Construction : Steel

CREOLE CRUSADER

  • Type : Pushboat
  • Construction : Steel

CREOLE JILL

  • Type : Pushboat
  • Construction : Steel

CREOLE LADY

  • Type : Pushboat
  • Construction : Steel

CREOLE RIVERS

  • Type : Pushboat
  • Construction : Steel

CREOLE SHAWNEE

  • Type : Pushboat
  • Construction : Steel

CREOLE SPIRIT

  • Type : Pushboat
  • Construction : Steel

CREOLE SUE

  • Type : Pushboat
  • Construction : Steel

DAVE LEBOEUF

  • Type : Pushboat
  • Construction : Steel

DICKIE GONSOULIN

  • Type : Pushboat
  • Construction : Steel

DONNIE SONNIER

  • Type : Pushboat
  • Construction : Steel

EARL GONSOULIN

  • Type : Pushboat
  • Construction : Steel

H. J. DUPRE

  • Type : Pushboat
  • Construction : Steel

JACKIE GONSOULIN

  • Type : Pushboat
  • Construction : Steel

JULIE GONSOULIN

  • Type : Pushboat
  • Construction : Steel

KAREN ANN

  • Type : Pushboat
  • Construction : Steel

KARL SENNER

  • Type : Pushboat
  • Construction : Steel

KATIE GONSOULIN

  • Type : Pushboat
  • Construction : Steel

LAT GONSOULIN

  • Type : Pushboat
  • Construction : Steel

LAURENCE GONSOULIN

  • Type : Pushboat
  • Construction : Steel

MARC MIYASAKI

  • Type : Pushboat
  • Construction : Steel

MATTHEW JAMES

  • Type : Pushboat
  • Construction : Steel

MEDICINE BOW

  • Type : Pushboat
  • Construction : Steel

MERLE GONSOULIN

  • Type : Pushboat
  • Construction : Steel

MICHELE GONSOULIN

  • Type : Pushboat
  • Construction : Steel

NANCY SONIER

  • Type : Pushboat
  • Construction : Steel

RICHARD GONSOULIN II

  • Type : Pushboat
  • Construction : Steel

RUBY GONSOULIN

  • Type : Pushboat
  • Construction : Steel

SYDNEY ANN

  • Type : Pushboat
  • Construction : Steel

TEDDY MEYER

  • Type : Pushboat
  • Construction : Steel

W. J. AUTHEMENT

  • Type : Pushboat
  • Construction : Steel

WILSEY DUPRE

  • Type : Pushboat
  • Construction : Steel

CREOLE

  • Type : Liquid Cargo Barge (Single Hull)
  • Construction : Steel

News

"Only One Stupid Thing at a Time"

"Only One Stupid Thing at a Time"

This story spans a long period of time, but begins with a note I received recently on an earlier column from a reader named Allan Berger. He commented on the OODA loop concept in my “Pondering Truths in Design” column in the September MREN issue.He provided his approach that closely follows the OODA loop concept, which follows the principle of always gathering all the facts before speaking.

US Offshore Wind: Our Interconnected Future

US Offshore Wind: Our Interconnected Future

It will take a team effort that spans sectors and even industries to meet the United States’ goal of 30 GW of offshore wind by 2030, writes Greg Lennon, ABS Vice President, Global Offshore Wind.As the United States offshore wind (OSW) industry considers the Biden-Harris Administration’s 30 gigawatts (GW) by 2030 goal, it’s easy to be struck by the monumental scope of the task ahead.