MARGARET

  • General
    • Vessel Name : MARGARET 0
    • Operator : ASSOCIATED TERMINALS 0
    • Ships Type (ICST) : 341 0
    • Vessel Type : 43 0
    • Construction : A 0
  • Engine
  • Location
    • City : CONVENT 0
    • STATE : LA 0
  • Capacity
    • Net Tonnage : 1161 0
  • Size
    • Register length : 180 257
    • Regular Breadth : 64 257
    • Overall Length : 180 257
    • Overall Breadt : 64 257
    • Load draft : 5 257
    • Light Draft : 5 257
    • Height : 35 257
  • Other
    • Year : 1994 0
    • EQUIP1 : TRACK HOE 0
    • Coast Guard Number : 1028915 0

ASSOCIATED TERMINALS

  • Area of Operation : MIDSTREAM TRANSFER OPERATIONS BETWEEN MILE 55 AND 229 ON LOWER MISSISSIPPI RIVER 0
  • Principal Commodity : NONE 0

ABILITY

  • Type : 43 0
  • Construction : A 0

ALEX G

  • Type : 43 0
  • Construction : A 0

ATTITUDE

  • Type : 43 0
  • Construction : A 0

DON D

  • Type : 43 0
  • Construction : A 0

F. WALKER

  • Type : 43 0
  • Construction : A 0

GLENN S

  • Type : 43 0
  • Construction : A 0

K. ROBERTSON

  • Type : 43 0
  • Construction : A 0

KEVIN D

  • Type : 43 0
  • Construction : A 0

MGMT

  • Type : 43 0
  • Construction : A 0

MISS IRENE

  • Type : 43 0
  • Construction : A 0

MISS TARA

  • Type : 43 0
  • Construction : A 0

RANDY W

  • Type : 43 0
  • Construction : A 0

T LANGE

  • Type : 43 0
  • Construction : A 0

T MAY

  • Type : 43 0
  • Construction : A 0

TALLEY-PEREZ

  • Type : 43 0
  • Construction : A 0

News

Skipper Sentenced for Dozing Off at Helm, Causing Collision

Skipper Sentenced for Dozing Off at Helm, Causing Collision

The skipper of a U.K. fishing trawler has been been fined and given an eight-month prison sentence after falling asleep during his watch, causing the vessel to collide with another and injuring two crew membersOn January 15, 2022, Maurice Reid of Fraserburgh, Scotland was in charge of the fishing vessel Margaret Anne’s journey when he started to fall asleep.

Bath Iron Works Lays Keel for US Navy Warship USS William Charette

Bath Iron Works Lays Keel for US Navy Warship USS William Charette

The keel for the future USS William Charette (DDG 130), an Arleigh Burke-class guided-missile destroyer, was ceremoniously laid on August 29 at General Dynamics Bath Iron Works (BIW) in Bath, Maine. The warship is scheduled for delivery to the U.S. Navy in 2026.Named after Medal of Honor recipient Master Chief Hospital Corpsman William R.

Russia Says West is Deaf to Moscow's Diplomatic Signals

Russia Says West is Deaf to Moscow's Diplomatic Signals

Russia said on Thursday that the United States should not be nervous about Russian warships in Cuba but that the West appeared deaf to any diplomatic signals from Moscow and only took notice when the army or navy took action.A Russian navy frigate and a nuclear-powered submarine churned into Havana harbor on Wednesday, a stopover the U.S.

Fatigue Led to Grounding of RoRo Ferry

Fatigue Led to Grounding of RoRo Ferry

The UK Marine Accident Investigation Branch (MAIB) has published its report into the grounding of the ro-ro ferry Alfred on July 5, 2022.The ferry grounded on the east coast of Swona Island, Pentland Firth, Scotland. The impact caused injuries to 41 passengers and crew and damage to Alfred’s port bulbous bow and almost all the vehicles being transported on board.

ABB to Provide Hybrid-electric Propulsion for MaineDOT Ferry

ABB to Provide Hybrid-electric Propulsion for MaineDOT Ferry

ABB has been selected by Maine Department of Transportation (MaineDOT) to supply a comprehensive grid-to-propeller solution for the new double-ended, hybrid-electric ferry that will provide essential services between the town of Lincolnville and the island community of Islesboro in the United States.ABB’s scope of supply covers the hybrid-electric propulsion and energy storage system.