AIMI DUTRA

  • General
    • Vessel Name : AIMI DUTRA
    • Operator : DUTRA GROUP INC.
    • Ships Type (ICST) : Dry Cargo Deck Barge
    • Vessel Type : Flat / Deck Barge
    • Construction : Steel
  • Engine
  • Location
    • City : RIO VISTA
    • STATE : CA
  • Capacity
    • Net Tonnage : 960
    • Full Load Capacity : 4300 Short ton
  • Size
    • Register length : 200 Feet
    • Regular Breadth : 45 Feet
    • Overall Length : 200 Feet
    • Overall Breadt : 45 Feet
    • Load draft : 10 Feet
    • Light Draft : 2.5 Feet
    • Height : 18 Feet
  • Other
    • Year : 1982
    • EQUIP1 : NONE
    • Coast Guard Number : 639907

DUTRA GROUP INC.

ROBERT W

  • Type : Flat / Deck Barge
  • Construction : Steel

SCOW

  • Type : Open Hopper Barge
  • Construction : Steel

WF

  • Type : Flat / Deck Barge
  • Construction : Steel

ZB

  • Type : Flat / Deck Barge
  • Construction : Steel

DS

  • Type : Other Liquid Cargo Barge Not Elsewhere Included
  • Construction : Steel

DB

  • Type : Passenger Vessel
  • Construction : Steel

EM

  • Type : Passenger Vessel
  • Construction : Aluminum

JEANETTE C

  • Type : Tugboat
  • Construction : Steel

PATTY D

  • Type : Pushboat
  • Construction : Steel

SARAH REED

  • Type : Tugboat
  • Construction : Steel

SEA W

  • Type : Pushboat
  • Construction : Steel

TROJAN

  • Type : Pushboat
  • Construction : Steel

BARGE

  • Type : Open Hopper Barge
  • Construction : Steel

BASALT NO

  • Type : Flat / Deck Barge
  • Construction : Steel

CK

  • Type : Flat / Deck Barge
  • Construction : Steel

DUTRA BARGE NO

  • Type : Flat / Deck Barge
  • Construction : Steel

IGNACIO

  • Type : Flat / Deck Barge
  • Construction : Steel

KS

  • Type : Open Hopper Barge
  • Construction : Steel

NO

  • Type : Covered Dry Cargo Barge
  • Construction : Steel

PRINCESS CHRISTINA

  • Type : Flat / Deck Barge
  • Construction : Steel

RES

  • Type : Flat / Deck Barge
  • Construction : Steel

News

Boston Harbor Phase II Dredging Wraps Up Ahead of Schedule

Boston Harbor Phase II Dredging Wraps Up Ahead of Schedule

New England’s busiest port moves closer to welcoming larger containerships and growing the regional economy with the completion of the second phase of a three-part dredging program last month, nearly one year ahead of schedule.Cashman Dredging and JV partner The Dutra Group began Phase II of the U.S. Army Corps’ Boston Harbor Navigation Improvement Project in July of 2018.