POLAR DISCOVERY

  • General
    • Vessel Name : POLAR DISCOVERY 0
    • Operator : CONOCO PHILLIPS CO. 0
    • Ships Type (ICST) : 114 0
    • Vessel Type : 20 0
    • Construction : A 0
  • Engine
    • Horsepower rating : 30000 0
  • Location
    • City : HOUSTON 0
    • STATE : TX 0
  • Capacity
    • Net Tonnage : 41995 0
    • Full Load Capacity : 156235 232
  • Size
    • Register length : 846.9 257
    • Regular Breadth : 151.6 257
    • Overall Length : 895.5 257
    • Overall Breadt : 151.6 257
    • Load draft : 57.4 257
    • Light Draft : 31 257
    • Height : 176 257
  • Other
    • Year : 2003 0
    • EQUIP1 : 4 ELECTRIC PUMPS 0
    • Coast Guard Number : 1137026 0

CONOCO PHILLIPS CO.

  • Area of Operation : VALDEZ, AK TO U. S. WEST COAST - LOS ANGELES, LONG BEACH, SAN FRANCISCO BAY AREA, PUGET SOUND AND HAWAII 0
  • Principal Commodity : CRUDE OIL, CONDENSATE, ETHYLENE FEEDSTOCK, HEAVY OILS AND LIGHT OILS, OR CLEAN PETROLEUM PRODUCTS 0

POLAR ADVENTURE

  • Type : 20 0
  • Construction : A 0

POLAR ENDEAVOUR

  • Type : 20 0
  • Construction : A 0

POLAR ENTERPRISE

  • Type : 20 0
  • Construction : A 0

POLAR RESOLUTION

  • Type : 20 0
  • Construction : A 0

News

Three Bodies Found in Sunken Borr Drilling Rig Off Gabon, Two Still Missing

Three Bodies Found in Sunken Borr Drilling Rig Off Gabon, Two Still Missing

Three bodies have been located inside the wreck of Borr Drilling's Prospector 5 jack-up rig, which sank offshore Gabon on October 24, with search and rescue operations continuing for two people still missing.The bodies were discovered during underwater inspections using a remotely operated vehicle (ROV), Vice-Admiral Charles Hubert Bekale-Meyong

4,700-Year-Old Shipwreck Discovered off Turkish Coast

4,700-Year-Old Shipwreck Discovered off Turkish Coast

Underwater archaeologists from Akdeniz University have recovered Early Bronze Age pottery off Kekova Island, offering new evidence of Mediterranean maritime trade and life aboard ships nearly five millennia ago.Underwater archaeologists from Turkey's Akdeniz University have recovered ceramic vessels dating back as far as 4,700 years from a shipwreck near Kekova Island

Keel Laid for Canada's Largest Polar Icebreaker

Keel Laid for Canada's Largest Polar Icebreaker

The 158-meter CCGS Imnaryuaq will feature 47 MW of installed power, diesel-electric propulsion and Polar Class 2 icebreaking capability, extending the Canadian Coast Guard's operational reach into the High Arctic.Seaspan Shipyards marked a major construction milestone for the Canadian Coast Guard's (CCG) future flagship polar icebreaker, CCGS Imnaryuaq

An Update on Plans for the U.S.’s Icebreaking Fleet

An Update on Plans for the U.S.’s Icebreaking Fleet

The U.S. is expanding its icebreaking fleet to strengthen Arctic and domestic access, and support commercial shipping, seabed resources, subsea cables and fisheries. Current plans include 1–3 heavy Polar Security Cutters (PSCs), 11 medium Arctic Security Cutters (ASCs), seven Homeland Security Cutter (HSC) HSC-L (light) icebreakers, 11 HSC-Ms (medium) and one additional heavy HSC-H (heavy).

NATO Allies Disrupt Russian Subsea Cable Sabotage Exercise

NATO Allies Disrupt Russian Subsea Cable Sabotage Exercise

Deep in Arctic waters near the remote Svalbard archipelago this spring, NATO allies caught Russian subs training to unleash a secret weapon designed to disable critical undersea cables without leaving any fingerprints.The clandestine Russian operation, described to Reuters by two Western officials, was carried out by Moscow's GUGI undersea warfare directorate

South Korean Container Ship Will Test Arctic Route

South Korean Container Ship Will Test Arctic Route

A container ship will depart from South Korea bound for Europe via the Arctic on Saturday, testing whether a route opened by melting sea ice can be commercially viable, but risking friction with Western allies, as the voyage requires Russian cooperation.If successful, the trip would be South Korea's first such commercial voyage to Europe via the Arctic

Cruise Shipbuilding Keeps European Yards Busy to mid-2030s

Cruise Shipbuilding Keeps European Yards Busy to mid-2030s

A flourishing cruise market and European shipbuilders’ unerring contractual success in the sector has taken orderbooks into the middle of the next decade, ensuring production continuity and underpinning fresh capital expenditure and R&D commitments by the continent’s foremost players.

U.S. Icebreaker Build Plan Moves Forward at Warp Speed

U.S. Icebreaker Build Plan Moves Forward at Warp Speed

The quest to rebuild the U.S. iceabreaking fleet continues to move at lightening speed, with Seaspan Shipyards (Seaspan) signing agreements with Bollinger Shipyards (Bollinger) and Rauma Marine Constructions Oy (Rauma) to provide its Multi-Purpose Icebreaker (MPI) design and associated supply chain packages to enable rapid construction and delivery of up to six vessels for the U.S.

Hull Delivery Brings Near-Zero-Emission Vessel Captain Arctic Closer to Launch (Video)

Hull Delivery Brings Near-Zero-Emission Vessel Captain Arctic Closer to Launch (Video)

The construction of Captain Arctic, a 69-meter near-zero-emission exploration vessel designed for sustainable cruising in polar waters, has reached a major milestone as its hull was completed by Goltens Dubai, marking the start of final outfitting and integration work.The vessel, owned by French company SELAR and built in collaboration with Chantier Naval de l’Océan Indien (CNOI) and Goltens

Green Yard Unveils 100-m Polar Expedition Yacht

Green Yard Unveils 100-m Polar Expedition Yacht

Norway’s Green Yard has unveiled the KLEVEN KY100, a 100-meter Polar Class expedition yacht that marks the shipbuilder’s move into developing and owning its own yacht designs.Developed by Green Yard Kleven in cooperation with Opalinski Design House and HAV Design, KY100 combines the yard’s offshore and polar vessel experience with contemporary superyacht design.

U.S. Coast Guard Cutter Polar Star Celebrates 50 Years, Begins Operation Deep Freeze 2026

U.S. Coast Guard Cutter Polar Star Celebrates 50 Years, Begins Operation Deep Freeze 2026

The U.S. Coast Guard Cutter Polar Star (WAGB 10) began icebreaking operations in the Southern Ocean in support of Operation Deep Freeze 2026 and marked its 50th year of commissioned service Saturday by freeing and escorting a cruise ship trapped in pack ice.The Australian-owned cruise ship Scenic Eclipse II contacted Polar Star at approximately 11 p.m.

ABB Azipod Propulsion to Power New Canadian Icebreaker

ABB Azipod Propulsion to Power New Canadian Icebreaker

ABB has secured a contract with Helsinki Shipyard to supply a complete electric power and propulsion solution for the Polar Max icebreaker, which is expected to be delivered to the Canadian Coast Guard by 2030.Polar Max will be constructed through an industrial collaboration between Canadian-controlled facilities in Helsinki, Finland and Lévis, Canada. The 22,800-ton, 138.