ORION

  • General
    • Vessel Name : ORION 0
    • Operator : CROSS LINK, INC. 0
    • Ships Type (ICST) : 431 0
    • Vessel Type : 36 0
    • Construction : A 0
  • Engine
    • Horsepower rating : 3000 0
  • Location
    • City : SAN FRANCISCO 0
    • STATE : CA 0
  • Capacity
    • Net Tonnage : 97 0
  • Size
    • Register length : 87 257
    • Regular Breadth : 28.5 257
    • Overall Length : 100 257
    • Overall Breadt : 28.5 257
    • Load draft : 14.5 257
    • Light Draft : 14.5 257
    • Height : 32 257
  • Other
    • Year : 1945 0
    • EQUIP1 : NONE 0
    • Coast Guard Number : 583761 0

CROSS LINK, INC.

  • Area of Operation : SAN FRANCISCO BAY AREA, PUGET SOUND WASHINGTON 0

CORVUS

  • Type : 02 0
  • Construction : C 0

HAWK

  • Type : 02 0
  • Construction : A 0

MS. KATIE

  • Type : 02 0
  • Construction : A 0

PROVIDER

  • Type : 02 0
  • Construction : A 0

PROWLER

  • Type : 02 0
  • Construction : C 0

BAYCAT

  • Type : 35 0
  • Construction : A 0

BEARCAT

  • Type : 36 0
  • Construction : A 0

BETTY L

  • Type : 35 0
  • Construction : A 0

BOB

  • Type : 35 0
  • Construction : A 0

MUDCAT

  • Type : 36 0
  • Construction : A 0

SAGITTARIAN

  • Type : 36 0
  • Construction : A 0

SOLANA

  • Type : 35 0
  • Construction : A 0

TAURUS

  • Type : 36 0
  • Construction : A 0

TERILYN

  • Type : 35 0
  • Construction : A 0

WILDCAT

  • Type : 36 0
  • Construction : A 0

News

First Foundation Installed for Coastal Virginia Offshore Wind

First Foundation Installed for Coastal Virginia Offshore Wind

Dominion Energy has announced that the first monopile foundation for the 2.6-gigawatt Coastal Virginia Offshore Wind (CVOW), the largest offshore wind farm under construction in the United States, has been installed approximately 29 miles off the Virginia Beach coast.The monopile was installed by the Orion, DEME Group's heavy lift vessel.

Houthis Attack Four Ships in Indian Ocean, Red Sea

Houthis Attack Four Ships in Indian Ocean, Red Sea

Yemen's Houthis said on Tuesday they targeted the MSC Orion container ship in a drone attack in the Indian Ocean as part of their ongoing campaign against international shipping in solidarity with Palestinians against Israel's military actions in Gaza.MSC Orion was sailing between the ports in Sines, Portugal and Salalah, Oman, according to LSEG data.

Houthis Claim Attacks Against Two Vessels, Two US Destroyers

Houthis Claim Attacks Against Two Vessels, Two US Destroyers

Yemen's Houthis targeted two U.S. destroyers and the vessel Cyclades in the Red Sea as well as the MSC Orion in the Indian Ocean, the Iran-aligned group's military spokesman Yahya Sarea said in a televised speech early on Tuesday.Houthi forces have staged attacks on shipping lanes for months in solidarity with Palestinians fighting Israel in the Gaza war.

All Clear for Construction Start of Virginia’s 2.6GW Offshore Wind Farm

All Clear for Construction Start of Virginia’s 2.6GW Offshore Wind Farm

The U.S. Environmental Protection Agency (EPA) has issued the final air quality permit for Dominion Energy’s 2.6 GW Coastal Virginia Offshore Wind (CVOW) project located off the coast of Virginia Beach in the United States.Issued on April 9 following a 30-day public comment period, the permit authorizes the construction and operation of the largest offshore wind project in the U.S.

First US-built WTIV Charybdis Launched

First US-built WTIV Charybdis Launched

The United States' first Jones Act-compliant offshore wind turbine installation vessel (WTIV), Charybdis, was launched into the water at the Seatrium AmFELS shipyard in Brownsville, Texas.The 472-foot WTIV—the first and only to be constructed in the U.S.—is being built for Blue Ocean Energy Marine, a subsidiary of Dominion Energy, who announced the milestone on Monday.

DEME Installs First XXL Monopile for Moray West Offshore Wind Farm

DEME Installs First XXL Monopile for Moray West Offshore Wind Farm

Belgium-based offshore installation services company DEME has installed the first XXL monopile foundation at the 882 MW Moray West offshore wind farm in Scotland.DEME used its Orion offshore installation vessel to complete the task, which is part of its work scope that includes both the installation of monopiles and transition pieces.

First Installation Campaign at Coastal Virginia Offshore Wind Farm Wraps Up

First Installation Campaign at Coastal Virginia Offshore Wind Farm Wraps Up

Dominion Energy has installed 78 monopile and four offshore substation foundations for as part of the first offshore construction campaign for the 2.6 GW Coastal Virginia Offshore Wind (CVOW) project.CVOW, the largest offshore wind project under construction in the United States, will consist of 176 turbines that will generate enough clean, renewable energy to power up to 660

Offshore Wind: Inside the Financial Web

Offshore Wind: Inside the Financial Web

Early 2024 saw a group of financial deals that have implications, in a broad sense, for how offshore wind projects may be financed. While offshore wind projects might be thought of as being in the ‘utility finance’ basket, they are ultimately high-risk deals that might better suit the portfolios of ‘infrastructure investment’ which, in recent years

Navalrocha Shipyard Reports Results

Navalrocha Shipyard Reports Results

Navalrocha Shipyard reported growth in key target markets, including LPG and Product Carriers, after recording one of its strongest ever half-year performances.With more than 30 projects delivered to date, Navalrocha is on course for another record-breaking year having completed projects with wide variety of commercial ships.

DEME’s Orion Vessel Heads to US After Finishing Scottish Offshore Wind Job

DEME’s Orion Vessel Heads to US After Finishing Scottish Offshore Wind Job

DEME’s DP3 offshore installation vessel Orion has departed for the United States to prepare for the installation of 176 foundations on the Coastal Virginia Offshore Wind (CVOW) project, following the wrap up of works at the 882 MW Moray West offshore wind farm in Scotland.DEME’s flagship Orion vessel has completed monopile installation works on Ocean Winds’ Moray West offshore wind farm project

NASA to Barge Key Space Flight Hardware from Alabama to Florida

NASA to Barge Key Space Flight Hardware from Alabama to Florida

NASA has transported a critical component for the Space Launch System (SLS) rocket, designed for the Artemis II mission, from Marshall Space Flight Center in Huntsville, Alabama, to Kennedy Space Center in Florida. The cone-shaped launch vehicle stage adapter, which connects the rocket’s core stage to the upper stage, was moved on August 21.

NASA Prepping Barge for Rocket Transport

NASA Prepping Barge for Rocket Transport

NASA said its team members are installing pedestals aboard the agency’s Pegasus barge to hold and secure the massive core stage of NASA’s SLS (Space Launch System) rocket, indicating NASA barge crews are nearly ready for its first delivery to support the Artemis II test flight around the Moon.