ORION

  • General
    • Vessel Name : ORION
    • Operator : CROSS LINK, INC.
    • Ships Type (ICST) : Tugboat
    • Vessel Type : Tugboat
    • Construction : Steel
  • Engine
    • Horsepower rating : 3000
  • Location
    • City : SAN FRANCISCO
    • STATE : CA
  • Capacity
    • Net Tonnage : 97
  • Size
    • Register length : 87 Feet
    • Regular Breadth : 28.5 Feet
    • Overall Length : 100 Feet
    • Overall Breadt : 28.5 Feet
    • Load draft : 14.5 Feet
    • Light Draft : 14.5 Feet
    • Height : 32 Feet
  • Other
    • Year : 1945
    • EQUIP1 : NONE
    • Coast Guard Number : 583761

CROSS LINK, INC.

  • Area of Operation : SAN FRANCISCO BAY AREA, PUGET SOUND WASHINGTON

CORVUS

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Aluminum

HAWK

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Steel

MS. KATIE

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Steel

PROVIDER

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Steel

PROWLER

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Aluminum

BAYCAT

  • Type : Pushboat
  • Construction : Steel

BEARCAT

  • Type : Tugboat
  • Construction : Steel

BETTY L

  • Type : Pushboat
  • Construction : Steel

BOB

  • Type : Pushboat
  • Construction : Steel

MUDCAT

  • Type : Tugboat
  • Construction : Steel

SAGITTARIAN

  • Type : Tugboat
  • Construction : Steel

SOLANA

  • Type : Pushboat
  • Construction : Steel

TAURUS

  • Type : Tugboat
  • Construction : Steel

TERILYN

  • Type : Pushboat
  • Construction : Steel

WILDCAT

  • Type : Tugboat
  • Construction : Steel

News

Liebherr: Broken Hook Cause of Orion Crane Collapse

Liebherr: Broken Hook Cause of Orion Crane Collapse

The article was updated to include a statement by a Deme spokesperson who said that the Orion delivery would be delayed following the accident.Following last week's crane collapse on offshore installation vessel Orion at Liebherr's yard in Rostock in Germany, Liebherr has said that the preliminary findings showed that a broken crane hook was the reason behind the accident.

VIDEO: Crane Collapses on Deme Offshore's New Vessel

VIDEO: Crane Collapses on Deme Offshore's New Vessel

A giant crane collapsed on Saturday on Deme Offshore's flagship offshore vessel Orion at Liebherr's yard in Rostock, Germany, during crane load tests.Deme said Saturday that "a few persons suffered minor injuries." Deme Offshore said: "A serious accident has occurred today on board of offshore installation vessel ‘Orion 1’ at the occasion of and during crane load tests.

C-Job CEO Basjan Faber was Born to Design

C-Job CEO Basjan Faber was Born to Design

Born and raised on the water by entrepreneurial parents, Basjan Faber knew from a young age that his future and fate was in maritime, specifically ship design. Today the CEO leads a vibrant, diverse and fast-growing naval architecture firm that he co-founded with partners in 2007. Headquartered in Amsterdam, C-Job has a unique approach to its business and is expanding its international footprint

Odfjell Adds Bow Odyssey  to its Fleet

Odfjell Adds Bow Odyssey to its Fleet

Odfjell SE,  a company specializing in worldwide seaborne transportation and storage of chemicals and other speciality bulk liquids, said that it took the delivery of Bow Odyssey - the third of its series of four newbuilt, 49,000 dwt chemical tankers.The Hudong class vessel was built by Hudong-Zhonghua Shipbuilding Co.Ltd Shanghai China.

OSV Orion Fueled with LNG in Germany

OSV Orion Fueled with LNG in Germany

The world’s largest LNG bunker vessel ‘Kairos’, operated by Nauticor, has supplied DEME’s next generation offshore installation vessel Orion, this first such ship-to-ship bunker transfer at the Port of Rostock.Orion is currently at the Liebherr construction yard in the Port of Rostock, where it is being outfitted with a 5,000-ton crane.

Global Energy Group Wins Nigg Gig

Global Energy Group Wins Nigg Gig

Global Energy Group (GEG) has won an offshore wind contract worth up to GBP12 million.GEG's Port of Nigg facility, on the Cromarty Firth in the Highlands, will handle the jacket foundation structures for the Moray East offshore wind farm."Global’s Port of Nigg has been earmarked to provide the services of the Port for receipt of completed jacket structures

ASCO Ships Completes Pirshagi Wastewater Treatment Plant

ASCO Ships Completes Pirshagi Wastewater Treatment Plant

More than 90 percent of the construction works of the Pirshagi Wastewater Treatment Plant, funded by the Government of Azerbaijan and the Korea Export-Import Bank, has been completed.According to Azerbaijan Caspian Shipping Company (ASCO), this facility is the first modern wastewater treatment plant in Azerbaijan developed on the basis of new technologies.