HB

  • General
    • Vessel Name : HB
    • Operator : EAGLE MARINE TRANSPORT, LLC
    • Ships Type (ICST) : Dry Cargo Deck Barge
    • Vessel Type : Flat / Deck Barge
    • Construction : Steel
  • Engine
  • Location
    • City : ST. LOUIS
    • STATE : MO
  • Capacity
    • Net Tonnage : 764
    • Full Load Capacity : 1876 Short ton
  • Size
    • Register length : 200 Feet
    • Regular Breadth : 35 Feet
    • Overall Length : 200 Feet
    • Overall Breadt : 35 Feet
    • Load draft : 10 Feet
    • Light Draft : 1.5 Feet
    • Height : 21.5 Feet
  • Other
    • Year : 2010
    • EQUIP1 : NONE
    • Coast Guard Number : 1229176

EAGLE MARINE TRANSPORT, LLC

  • Area of Operation : MISSISSIPPI RIVER AND GULF INTRACOASTAL WATERWAYS
  • Principal Commodity : DRY BULK PRODUCTS - PRINCIPALLY GRAIN, SOYBEANS, FERTILIZER, COAL, ROCK, WOOD PRODUCTS, ETC.

ANE

  • Type : Flat / Deck Barge
  • Construction : Steel

BAH

  • Type : Flat / Deck Barge
  • Construction : Steel

BRD

  • Type : Flat / Deck Barge
  • Construction : Steel

CPC

  • Type : Flat / Deck Barge
  • Construction : Steel

DKS

  • Type : Covered Hopper Barge
  • Construction : Steel

DMB

  • Type : Flat / Deck Barge
  • Construction : Steel

EAGLE

  • Type : Flat / Deck Barge
  • Construction : Steel

FBG

  • Type : Flat / Deck Barge
  • Construction : Steel

GO

  • Type : Flat / Deck Barge
  • Construction : Steel

HAH

  • Type : Covered Hopper Barge
  • Construction : Steel

HATS

  • Type : Flat / Deck Barge
  • Construction : Steel

LBL

  • Type : Flat / Deck Barge
  • Construction : Steel

LUKE

  • Type : Flat / Deck Barge
  • Construction : Steel

MAR

  • Type : Flat / Deck Barge
  • Construction : Steel

MCAT

  • Type : Flat / Deck Barge
  • Construction : Steel

OSF

  • Type : Flat / Deck Barge
  • Construction : Steel

VLDY

  • Type : Flat / Deck Barge
  • Construction : Steel

News

Titan LNG to Build New Bunkering Barge

Titan LNG to Build New Bunkering Barge

The Netherlands-based marine fuel supplier Titan LNG launched a tender for a new liquefied natural gas (LNG) bunkering barge to service the Zeebrugge and English Channel regions. The first delivery is expected to be fulfilled in 2023.The 4,200 cubic meter capacity vessel, to be named Krios, was designed by HB Hunte Engineering.

New CO2 Vessel, Tank and Cargo Handling Concept Unveiled

New CO2 Vessel, Tank and Cargo Handling Concept Unveiled

A new tank concept for liquefied petroleum gas (LPG) and carbon dioxide (CO2) transportation promises to more than double current vessel cargo capacity, representing a step forward in the development of maritime transport solutions for the expanding carbon capture and storage (CCS) market, which will require maritime transport of liquefied CO2 to scale up rapidly.