ARKANSAS

  • General
    • Vessel Name : ARKANSAS
    • Operator : 3204270
    • Ships Type (ICST) : Dry Cargo Deck Barge
    • Vessel Type : Flat / Deck Barge
    • Construction : Steel
  • Engine
  • Location
    • City : HOUMA
    • STATE : LA
  • Capacity
    • Net Tonnage : 691
    • Full Load Capacity : 500 Short ton
  • Size
    • Register length : 129.6 Feet
    • Regular Breadth : 50 Feet
    • Overall Length : 135 Feet
    • Overall Breadt : 50 Feet
    • Load draft : 11 Feet
    • Light Draft : 5 Feet
    • Height : 6.6 Feet
  • Other
    • Year : 1943
    • EQUIP1 : NONE
    • Coast Guard Number : 255770

B. E. LINDHOLM

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Steel

BAYOU BLUE

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Steel

BAYOU CHENE

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Steel

BAYOU TECHE

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Steel

CAPTAIN PETE

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Steel

KRISTY

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Steel

R. N. WEEKS

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Steel

STEVE L.

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Steel

VENTURE

  • Type : Other
  • Construction : Steel

BOBBY L.

  • Type : Pushboat
  • Construction : Steel

BURLINGTON

  • Type : Pushboat
  • Construction : Steel

CAPT. BUSSEY

  • Type : Pushboat
  • Construction : Steel

CAPT. JELLY

  • Type : Pushboat
  • Construction : Steel

CAPTAIN TOM

  • Type : Pushboat
  • Construction : Steel

CHARLIE G

  • Type : Pushboat
  • Construction : Steel

GEORGE W

  • Type : Pushboat
  • Construction : Steel

J. C. LOVE JR.

  • Type : Pushboat
  • Construction : Steel

JANICE S

  • Type : Pushboat
  • Construction : Steel

JEANNE JAMES

  • Type : Pushboat
  • Construction : Steel

JOHNSON F.

  • Type : Pushboat
  • Construction : Steel

KATHY PAWG

  • Type : Pushboat
  • Construction : Steel

MARIE

  • Type : Tugboat
  • Construction : Steel

OLIVIA

  • Type : Pushboat
  • Construction : Steel

RICHARD B

  • Type : Pushboat
  • Construction : Steel

SABINE

  • Type : Pushboat
  • Construction : Steel

SALLY JAMES

  • Type : Pushboat
  • Construction : Steel

SHAI JAMES

  • Type : Pushboat
  • Construction : Steel

SIDNEY T

  • Type : Pushboat
  • Construction : Steel

TRINITY

  • Type : Pushboat
  • Construction : Steel

BT

  • Type : Flat / Deck Barge
  • Construction : Steel

CAPT. FRANK

  • Type : Other
  • Construction : Steel

G. D. MORGAN

  • Type : Other
  • Construction : Steel

R. S. WEEKS

  • Type : Other
  • Construction : Steel

WEEKS

  • Type : Flat / Deck Barge
  • Construction : Steel

E. W. ELLEFSEN

  • Type : Undefined
  • Construction : Steel

WID

  • Type : Undefined
  • Construction : Steel

News

Robust Dredging on America’s Inland Waterways

Robust Dredging on America’s Inland Waterways

Inland Dredging Company helps keep commerce flowing on America’s inland waterway system.Dyersburg, Tenn. based Inland Dredging Company completed dredging projects spanning eight states and across four U.S. Army Corps of Engineers Districts. Beginning in July and finishing in December (2019), Inland Dredging crews dredged ports and harbors along the Mighty Mississippi River, Ouachita River

US Gulf Production Restarting After Barry

US Gulf Production Restarting After Barry

U.S. oil companies on Monday began restoring some of the more than nearly 74% production shut at U.S. Gulf of Mexico platforms ahead of Hurricane Barry, the U.S. offshore drilling regulator said.There was 1.3 million barrels per day (bpd) of oil production off line in the U.S.-regulated areas of the Gulf of Mexico on Monday, about 80,000 barrels less than on Sunday, according to the U.S.

Trump's FY21 Budget Request 'Inadequate' -WCI

Trump's FY21 Budget Request 'Inadequate' -WCI

President Trump’s Fiscal Year 2021 (FY21) budget request released on Monday is "astonishingly inadequate" says industry advocate Waterways Council, Inc. (WCI).The FY21 budget provides $0 for construction of ongoing priority navigation projects cost-shared through the Inland Waterways Trust Fund (IWTF); cuts funding for the U.S. Army Corps of Engineers’ Civil Works Mission by 22% ($5.

Barges Break Free, Hit Oklahoma Dam, Sink

Barges Break Free, Hit Oklahoma Dam, Sink

According to a report on WeatherChannel.com, a pair of barges broke free and hit Lock and Dam 16 on the flooded Arkansas River on Thursday, May 23, 2019, north of Webber Falls, Oklahoma.Early reports citing the Oklahoma Highway Patrol said there did not appear to be any damage to the lock.

President's Request Cuts Funding for USACE

President's Request Cuts Funding for USACE

Waterways Council, Inc. (WCI) reacted to the Trump Administration’s release of an outline of its top-line FY20 budget numbers yesterday. Today, the Corps of Engineers released its account and project-specific funding levels.  For the U.S. Army Corps of Engineers’ Civil Works program, the FY20 budget proposes $4.827 billion, a 31% cut from the FY19 appropriated amount of $7.0 billion.

WCI Applauds Corps’ FY20 Work Plan

WCI Applauds Corps’ FY20 Work Plan

Waterways Council, Inc. (WCI) offered praise for Congress, the U.S. Department of Agriculture and the the U.S. Army Corps of Engineers’ for the Corps’ Fiscal Year 2020 (FY20) work plan that lays out allocations for funds provided in the FY20 Energy & Water Development Appropriations bill toward the Corps’ civil works mission. The work plan was released late yesterday.

Port Authority: 'A strong start to 2019'

Tonnage on river increases 60 percent from 2018Through the first two months of 2019, the Port of Little Rock and its stevedorer, LSI, have seen a year-to-year increase of 33 barges, a 62% increase in activity. Additionally, tonnage is up 49,000 tons year-to-year (60%) with a total of 130,400 tons.

Waterways Council Reacts to Budget Numbers

Waterways Council Reacts to Budget Numbers

Waterways Council, Inc. (WCI) reacted to the Trump Administration’s release of an outline of its top-line FY20 budget numbers yesterday.  Today, the Corps of Engineers released its account and project-specific funding levels.For the U.S. Army Corps of Engineers’ Civil Works program, the FY20 budget proposes $4.827 billion, a 31% cut from the FY19 appropriated amount of $7.0 billion.