LUEDTKE ENGINEERING COMPANY

  • Engineering District : 23 0
  • TSO Series Number : 3 0
  • Principal Commodity List : BREAKWATER STONE AND RIP RAP, SAND AND GRAVEL, DREDGE SPOILS, MASONRY AND STEEL WATER PIPE 0
  • Area of Operation : GREAT LAKES AND CONNECTING WATERS 0
  • Vessels
    • Tugboat : 9 0
    • Deck Barge : 8 0
    • Dry Open Barge : 8 0
    • Vessels List : ALAN K LUEDTKE, ANN MARIE, CHRIS E LUEDTKE, ERICH R LUEDTKE, GRETCHEN B., KARL E LUEDTKE, KRISTA S., KURT R LUEDTKE, PAUL L. LUEDTKE, DBT, DES, DPS 0
  • Address
    10 FOURTH STREET FRANKFORT MI 49635
  • Contact
    • Phone : 231-352-9631 0
10 FOURTH STREET FRANKFORT MI 49635

Managed Vessels

ALAN K LUEDTKE

  • Type : 36 0
  • Construction : A 0

ANN MARIE

  • Type : 36 0
  • Construction : A 0

CHRIS E LUEDTKE

  • Type : 36 0
  • Construction : A 0

ERICH R LUEDTKE

  • Type : 36 0
  • Construction : A 0

GRETCHEN B.

  • Type : 36 0
  • Construction : A 0

KARL E LUEDTKE

  • Type : 36 0
  • Construction : A 0

KRISTA S.

  • Type : 36 0
  • Construction : A 0

KURT R LUEDTKE

  • Type : 36 0
  • Construction : A 0

PAUL L. LUEDTKE

  • Type : 36 0
  • Construction : A 0

DBT

  • Type : 43 0
  • Construction : A 0

DES

  • Type : 43 0
  • Construction : A 0

DPS

  • Type : 40 0
  • Construction : A 0

Related News [LUEDTKE ENGINEERING COMPANY]

Seatrium Delivers Next-Gen WTIV Newbuild to Maersk Offshore Wind

Seatrium Delivers Next-Gen WTIV Newbuild to Maersk Offshore Wind

Singapore-based Seatrium has delivered a next-generation wind turbine installation vessel (WTIV) to Maersk Offshore Wind, following the completion of sea trials and final readiness evaluations.The custom-engineered vessel is designed to install 15+ MW-class offshore wind turbines and is equipped with a 1,900-tonne main crane featuring a 180-metre hook height.

Watch: Salvors Refloat Grounded Barge in San Juan Harbor

Watch: Salvors Refloat Grounded Barge in San Juan Harbor

The barge Defiant was refloated from the Castillo San Felipe del Morro shoreline in San Juan Harbor, Wednesday at approximately 2:22 a.m., just before high tide.Salvage crews and tugboat operators prepositioned three tugboats and completed all the preparations, including the pressurization of all cargo tanks, voids and compartments in the barge.

SDHI to Complete Five Offshore Support Vessels for San Maritime

SDHI to Complete Five Offshore Support Vessels for San Maritime

Swan Defence and Heavy Industries Limited (SDHI) has announced it will complete five offshore support vessels (OSVs) for Kakinada-based San Maritime India, marking a further step in the revival of the Pipavav shipyard.San Maritime has begun docking the vessels at SDHI’s yard in Pipavav for completion under IR Class, after which the ships are expected to serve offshore industry demand.

India's SDHI Books $227M Chemical Tanker Order from European Shipowner

India's SDHI Books $227M Chemical Tanker Order from European Shipowner

Swan Defence and Heavy Industries (SDHI) has signed its first newbuild contract for six IMO Type II chemical tankers, marking a milestone for India’s commercial shipbuilding sector and the country’s first chemical tanker order placed with a domestic shipyard.The contract, valued at $227 million, was awarded by European shipowner Rederiet Stenersen AS and covers six 18

New $60m U.S. Defense Shipbuilding Facility Set to Open in 2027

New $60m U.S. Defense Shipbuilding Facility Set to Open in 2027

Facility will include 150,000 square feet of covered manufacturing space optimized for serial productionNew yard will support 200 new jobs and expands shipbuilding capacity Master Boat Builders announced plans to build a new $60 million, 150,000 sq ft manufacturing facility dedicated exclusively to government and defense shipbuilding programs.

HD Korea Shipbuilding Books $507M Order for Two LNG Carriers

HD Korea Shipbuilding Books $507M Order for Two LNG Carriers

HD Korea Shipbuilding & Offshore Engineering (HD KSOE) has secured a contract to build two liquefied natural gas (LNG) carriers for a North American shipowner.The order is valued at 741.2 billion won (about $507 million), HD KSOE said.The vessels will be constructed by HD Hyundai Samho and are scheduled for delivery in 2028.

Webinar: Seequent Unlocks Subsea Intelligence

Webinar: Seequent Unlocks Subsea Intelligence

Whether you're in offshore wind, grid operations, geotechnical engineering, or digital transformation, this session, in conjunction with Offshore Engineer, will offer actionable insights, live demos, and expert opinions on:Why cable heat matters — from environmental impact to dynamic ratingHow to build better ground models using connected workflows and 3D subsurface dataHow thermal analysis

Obituary: Iconic Maritime, Shipbuilding Leader Fred Harris Passes

Obituary: Iconic Maritime, Shipbuilding Leader Fred Harris Passes

Frederick Joseph Harris of Mystic CT, passed peacefully at 5:47PM on 10/24/2025, with his family by his side. “Fred” was born on 11/25/1944 at Framingham Union Hospital to Frederick Everett and MaryRosa Camilla Harris.Fred was a proud patriot who loved his country. Fred received his bachelor’s degree in Marine Engineering from Maine Maritime Academy (with Honors) in 1967.

Alaska LNG Pipeline Study Will Be Completed This Year

Alaska LNG Pipeline Study Will Be Completed This Year

The backers of a proposed 800-mile (1,287 km) gas pipeline in Alaska championed by U.S. President Donald Trump expect to complete a key engineering and cost study by the end of this year, Interior Secretary Doug Burgum said on Monday.The ambitious proposal to transport gas from Alaska's far north to the Gulf of Alaska has been talked about for decades but has received new impetus under Trump

ABS, Herbert Engineering Report Details Design Considerations for Floating Data Centers

ABS, Herbert Engineering Report Details Design Considerations for Floating Data Centers

How can the global energy grid keep pace with fast-growing demand from new data centers supporting artificial intelligence (AI) and cloud computing? Nuclear energy and coastal waters offer a potential answer.The potential for floating nuclear-powered data centers is explored in depth in the latest research from ABS and Herbert Engineering.

First of Its Kind LCO2 Barge Design Approved for U.S. Operation

First of Its Kind LCO2 Barge Design Approved for U.S. Operation

ABS awarded approval in principle (AiP) to Overseas Shipholding Group, Inc. (OSG), the parent company of Aptamus Carbon Solutions, for its preliminary design of a liquefied carbon dioxide (LCO2) barge.The development of the barge design is a core component of the Tampa Regional Intermodal Carbon Hub (T-RICH) project to receive

Scarborough FPU's Topsides and Hull Come Together in Major Engineering Feat (Video)

Scarborough FPU's Topsides and Hull Come Together in Major Engineering Feat (Video)

Woodside Energy’s Scarborough energy project has achieved a major engineering milestone with the joining together of the topsides and hull for the Floating Production Unit (FPU).Constructed separately at two different fabrication yards in China, the joining of the two mega-structures is a significant step forward for the Scarborough energy project as it progresses towards first liquefied natural