WHIDBEY

  • General
    • Vessel Name : WHIDBEY 0
    • Operator : DUNLAP TOWING CO. 0
    • Ships Type (ICST) : 431 0
    • Vessel Type : 36 0
    • Construction : A 0
  • Engine
    • Horsepower rating : 750 0
  • Location
    • City : EVERETT 0
    • STATE : WA 0
  • Capacity
    • Net Tonnage : 24 0
  • Size
    • Register length : 42 257
    • Regular Breadth : 16 257
    • Overall Length : 42 257
    • Overall Breadt : 16 257
    • Load draft : 6.9 257
    • Light Draft : 6.9 257
    • Height : 19 257
  • Other
    • Year : 1988 0
    • EQUIP1 : NONE 0
    • Coast Guard Number : 941367 0

DUNLAP TOWING CO.

  • Area of Operation : PUGET SOUND, ALASKA AND PACIFIC COAST 0
  • Principal Commodity : TOWING, LOGS AND WOOD CHIPS, OIL AND CONTAINERIZED CARGO, SHIP ASSIST 0

CAMANO

  • Type : 36 0
  • Construction : A 0

CEDAR KING

  • Type : 36 0
  • Construction : A 0

FIDALGO

  • Type : 36 0
  • Construction : A 0

GENE DUNLAP

  • Type : 36 0
  • Construction : A 0

HERCULES

  • Type : 36 0
  • Construction : A 0

JAMES DUNLAP

  • Type : 36 0
  • Construction : A 0

MALOLO

  • Type : 36 0
  • Construction : A 0

MANFRED NYSTROM

  • Type : 36 0
  • Construction : A 0

MIKE O'LEARY

  • Type : 36 0
  • Construction : A 0

PHYLLIS DUNLAP

  • Type : 36 0
  • Construction : A 0

PORT GARDNER

  • Type : 36 0
  • Construction : A 0

PORT SUSAN

  • Type : 36 0
  • Construction : A 0

PULL-AND-BE-DAMNED

  • Type : 36 0
  • Construction : A 0

ROSARIO

  • Type : 36 0
  • Construction : A 0

SARATOGA

  • Type : 36 0
  • Construction : A 0

SNEE-OOSH

  • Type : 36 0
  • Construction : A 0

SNOHOMISH

  • Type : 36 0
  • Construction : A 0

SUIATTLE

  • Type : 36 0
  • Construction : A 0

SWINOMISH

  • Type : 36 0
  • Construction : A 0

TAURUS

  • Type : 36 0
  • Construction : A 0

VULCAN

  • Type : 36 0
  • Construction : A 0

DT

  • Type : 43 0
  • Construction : A 0

SCOW

  • Type : 43 0
  • Construction : A 0

News

WSF Hybrid-Electric Ferry Conversions Put on Ice

WSF Hybrid-Electric Ferry Conversions Put on Ice

In a move to restore full domestic ferry service by summer, Governor Bob Ferguson said that Washington State Ferries (WSF) will delay the hybrid-electric conversion of two of the state’s largest ferries. The decision comes as WSF works to increase its operational fleet, ensuring that 18 vessels are in service simultaneously for the first time since 2019.

An (Electric) Jolt for the Passenger Vessel Industry

An (Electric) Jolt for the Passenger Vessel Industry

The domestic passenger vessel answers the call for cleaner and more efficient platforms. It is truly an electric time to be a part of this niche industry.In the shadow of a rapidly changing political landscape, the domestic passenger ferry sector is nevertheless seeing an increasing number of newbuild vessel orders.