TVA

  • General
    • Vessel Name : TVA 0
    • Operator : TENNESSEE VALLEY AUTHORITY 0
    • Ships Type (ICST) : 341 0
    • Vessel Type : 43 0
    • Construction : A 0
  • Engine
  • Location
    • City : JOHNSON- VLE STMPLT 0
    • STATE : TN 0
  • Capacity
    • Net Tonnage : 94 0
    • Full Load Capacity : 272 232
  • Size
    • Register length : 100 257
    • Regular Breadth : 30 257
    • Overall Length : 100 257
    • Overall Breadt : 30 257
    • Load draft : 4 257
    • Light Draft : 1 257
    • Height : 4.5 257
  • Other
    • Year : 1934 0
    • EQUIP1 : NONE 0
    • Coast Guard Number : 000858 0

TENNESSEE VALLEY AUTHORITY

  • Area of Operation : TENNESSEE, CUMBERLAND, OHIO AND MISSISSIPPI RIVERS 0
  • Principal Commodity : CONSTRUCTION MATERIALS, EQUIPMENT AND HARBOR SERVICE OF COAL BARGES 0

BOB JONES

  • Type : 35 0
  • Construction : A 0

BUCKEYE

  • Type : 35 0
  • Construction : A 0

BULLDOG TVA

  • Type : 35 0
  • Construction : A 0

FREEDOM

  • Type : 35 0
  • Construction : A 0

MARY LOU TVA

  • Type : 35 0
  • Construction : A 0

MAYOR BOB

  • Type : 35 0
  • Construction : A 0

PATRICIA H.

  • Type : 35 0
  • Construction : A 0

PATRIOT

  • Type : 35 0
  • Construction : A 0

RANDY L. KANIPE

  • Type : 35 0
  • Construction : A 0

RED WAGNER TVA

  • Type : 35 0
  • Construction : A 0

BC

  • Type : 43 0
  • Construction : A 0

TVA 3

  • Type : 74 0
  • Construction : A 0

News

MEGA INFRASTRUCTURE: Inside the Chickamauga Lock Upgrade Project

MEGA INFRASTRUCTURE: Inside the Chickamauga Lock Upgrade Project

This episode of Maritime Matters: The MarineLink Podcast, delves into the critical importance of the inland waterways infrastructure in the U.S., focusing on the Chickamauga Lock Project on the Tennessee River. A trio of experts – Tracy Zea, President & CEO of WCI; Elizabeth Burks, USACE Nashville Division Chief; and Capt.

MEGA INFRASTRUCTURE: Inside the Chickamauga Lock Upgrade Project

MEGA INFRASTRUCTURE: Inside the Chickamauga Lock Upgrade Project

This episode of Maritime Matters: The MarineLink Podcast, delves into the critical importance of the inland waterways infrastructure in the U.S., focusing on the Chickamauga Lock Project on the Tennessee River. A trio of experts discusses with MarineNews magazine the current state of the inland waterways, the history and significance of the Chickamauga Lock