P. C. OWEN

  • General
    • Vessel Name : P. C. OWEN
    • Operator : COASTAL PRODUCTION, LLC
    • Ships Type (ICST) : Offshore Support Vessel
    • Vessel Type : Crewboat / Supply / Utility Vessel
    • Construction : Aluminum
  • Engine
    • Horsepower rating : 1050
  • Location
    • City : DULAC
    • STATE : LA
  • Capacity
    • Net Tonnage : 34
    • Full Load Capacity : 5 Short ton
    • Passenger Capacity : 9
  • Size
    • Register length : 65 Feet
    • Regular Breadth : 16.6 Feet
    • Overall Length : 65 Feet
    • Overall Breadt : 16.6 Feet
    • Load draft : 5.5 Feet
    • Light Draft : 4.5 Feet
    • Height : 18 Feet
  • Other
    • Year : 1976
    • EQUIP1 : NONE
    • Coast Guard Number : 575038

COASTAL PRODUCTION, LLC

  • Operating Name : D/B/A COASTAL CREWBOATS, INC.
  • Area of Operation : INLAND BAYS AND GULF OF MEXICO
  • Principal Commodity : PERSONNEL

CAPT. GENE

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Aluminum

COASTAL

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Aluminum

F. M. BROWN

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Aluminum

JAMES ROBERT

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Aluminum

JANIE

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Aluminum

JEREMY R

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Aluminum

JONATHAN WOODWARD

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Aluminum

LADY BECKY

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Aluminum

LADY LEANNA

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Aluminum

MADELINE

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Aluminum

MISS JUDY

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Aluminum

MISS KARA

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Aluminum

MISS TRACY

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Aluminum

PORT EADS

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Aluminum

SANDY

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Aluminum

SOLOMON I

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Aluminum

SOLOMON II

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Aluminum

SOUTH FORK

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Aluminum

News

Callan Marine’s New Dredge General MacArthur Enters Service

Callan Marine’s New Dredge General MacArthur Enters Service

Callan Marine's new Jones Act cutterhead suction dredge (CSD) General MacArthur and its accompanying idler barge have entered service in Texas, heading to work on several projects before transiting to Corpus Christi for the second phase of the deepening and widening project.The newest and largest dredger in Callen Marine's fleet

Weeks Marine Orders New Dredger at Eastern

Weeks Marine Orders New Dredger at Eastern

Dredging contractor Weeks Marine has ordered a new trailer suction hopper dredger from Eastern Shipbuilding Group, to be delivered in the first quarter of 2023.The new dredge, RB Weeks, to be constructed at Eastern's Allanton shipyard in Panama City, Fla. will be a sister ship to the Eastern-built twin screw TSHD Magdalen placed into service in 2018.

Dredgers Make Way for USNS Comfort in New York

Dredgers Make Way for USNS Comfort in New York

Dredgers are expediting operations in New York to make way for the U.S. Navy hospital ship USNS Comfort, which will dock in the epicenter of America's COVID-19 outbreak to assist hospitals that become overrun by the pandemic.Dredging contractor Donjon Marine Co., Inc. was contacted last week and asked to begin dredging Manhattan Cruise Terminal’s Berth 4 in anticipation of the arrival of the ship

Bath Iron Works Begins Building Next US Navy Destroyer

Bath Iron Works Begins Building Next US Navy Destroyer

Shipbuilder Bath Iron Works (BIW) has officially started construction of the future USS Louis H. Wilson Jr. (DDG 126), the U.S. Navy announced. The new warship will be the first Arleigh Burke-class destroyer built in the Flight III configuration at BIW.The milestone was marked by a ceremony on Tuesday at General Dynamics BIW's structural fabrication facility in Brunswick, Maine.

Genco Scrubber Refits Completed

Genco Scrubber Refits Completed

Bulk carrier owner Genco Shipping & Trading said it has completed a refit program that saw scrubbers installed on board its 17 Capesize vessels as part of the New York-listed owner's plan to comply with new International Maritime Organization (IMO) regulations that limit sulfur emissions from vessels to 0.5% down from 3.5%.John C.

Aircraft Carrier John F. Kennedy Christened

Aircraft Carrier John F. Kennedy Christened

The U.S. Navy’s newest nuclear-powered aircraft carrier John F. Kennedy (CVN 79) was christened Saturday during a ceremony at Huntington Ingalls Industries’ (HII) Newport News Shipbuilding division.The second aircraft carrier in the Ford Class, John F. Kennedy (CVN 79) is also the second aircraft carrier built by Newport News Shipbuilding named for JFK.

Maersk Tankers to Add 11 Vessels to Fleet

Maersk Tankers to Add 11 Vessels to Fleet

Danish tanker owner and operator Maersk Tankers is set to add 11 ships to its managed fleet in a deal with BP Shipping and ICBC Financial Leasing.Under the terms of the agreement, Maersk Tankers will take each vessel from the owner under a bare-boat charter arrangement, which it will then hire out to BP under a time charter deal for a period of three years.

Putting Palatka Back on the Map

Putting Palatka Back on the Map

Diverse and conveniently located, St. Johns Ship Building has quickly developed into a reliable partner for its many repeat customers. Today, and as a direct result, a lot more people know exactly where Palatka, Florida is located.On the St Johns River, just 60 miles south of Jacksonville, lies the sleepy town of Palatka, Florida.

INSIGHTS: Edward C. Schwarz, ABB VP of Sales, New Builds

INSIGHTS: Edward C. Schwarz, ABB VP of Sales, New Builds

Based in Miramar, FL, ABB Vice President Ed Schwarz is today responsible for developing and leading the newly created new sales team for ABB in North America.He is the firm’s leading advocate for new build opportunities in US and Canada and more importantly, developing the business strategy necessary for bringing hybrid and electric solutions to North America market. A graduate of the U.S.

Interview: Dirk Balthasar, President, Thermamax

Interview: Dirk Balthasar, President, Thermamax

To start, can you give an overview of the Thermamax offering to the maritime industry?Thermamax is a specialist in the design and manufacture of thermal and acoustic insulation solutions for diesel engines, spark ignited engines, exhaust aftertreatment systems and electric storage systems.

Boat Sunk in Danube Ready to be Raised

Boat Sunk in Danube Ready to be Raised

Hungarian salvage crews prepared on Monday to raise the wreck of a pleasure boat that capsized on the Danube river in Budapest, killing 26 South Korean tourists and two local crew.The Mermaid sank after a large Swiss-owned cruise liner struck it from behind on May 29 as both vessels passed under a 19th century bridge in the Hungarian capital during heavy rain.

Maersk Orders Four Product Tankers

Maersk Orders Four Product Tankers

Danish ship owner Maersk confirmed it has exercised an option to order four additional product tankers from China's Dalian Shipyard.The order completes a a series of 10 newbuilds planned for delivery from 2020-2022 as part of Maersk's ongoing fleet renewal program in the LR2 segment. The first six vessels were ordered in May 2018.Søren C.