NORTHLAND

  • General
    • Vessel Name : NORTHLAND 0
    • Operator : HANSON MATERIAL SERVICE 0
    • Ships Type (ICST) : 432 0
    • Vessel Type : 35 0
    • Construction : A 0
  • Engine
    • Horsepower rating : 1500 0
  • Location
    • City : LOCKPORT 0
    • STATE : IL 0
  • Capacity
    • Net Tonnage : 97 0
  • Size
    • Register length : 71.6 257
    • Regular Breadth : 26 257
    • Overall Length : 75 257
    • Overall Breadt : 26.5 257
    • Load draft : 6 257
    • Light Draft : 5.5 257
    • Height : 16 257
  • Other
    • Year : 1971 0
    • EQUIP1 : NONE 0
    • Coast Guard Number : 530040 0

HANSON MATERIAL SERVICE

  • Area of Operation : ILLINOIS WATERWAY - UPPER MISSISSIPPI RIVER 0
  • Principal Commodity : TOWING, SAND, GRAVEL AND STONE 0

BLANCHE V.

  • Type : 35 0
  • Construction : A 0

KIOWA

  • Type : 35 0
  • Construction : A 0

LIMEY II

  • Type : 35 0
  • Construction : A 0

MALLARD

  • Type : 35 0
  • Construction : A 0

MARIETTE

  • Type : 35 0
  • Construction : A 0

MORRIS NO

  • Type : 35 0
  • Construction : A 0

STACY DIANNE

  • Type : 35 0
  • Construction : A 0

MSC

  • Type : 43 0
  • Construction : A 0

ALFRED HAGERTY

  • Type : 35 0
  • Construction : A 0

News

First Locally-Built Nacelles Installed at Polish Offshore Wind Farm

First Locally-Built Nacelles Installed at Polish Offshore Wind Farm

The Baltic Power offshore wind project has installed the first turbine nacelles manufactured in Poland, marking a milestone for the country’s emerging offshore wind supply chain.Three 15 MW turbines have been fitted with nacelles produced at Vestas’ newly opened plant in Szczecin, the first offshore wind manufacturing facility operated by the Danish company in Poland.

Second Hai Long Substation Heads to Project Site Offshore Taiwan

Second Hai Long Substation Heads to Project Site Offshore Taiwan

Consortium partners Semco Maritime and PTSC M&C have completed the load-out and sail-away of the second and last offshore substation for the Hai Long Offshore wind project in Taiwan.The load-out and sail-away of the second substation for Hai Long 3 offshore wind farm, which took place on March 8, 2025, comes almost a year after the first substation for Hai Long 2 was delivered to the project site.