LINDY MARIE

  • General
    • Vessel Name : LINDY MARIE
    • Operator : ADVANCED AMERICAN CONSTRUCTION
    • Ships Type (ICST) : Tugboat
    • Vessel Type : Tugboat
    • Construction : Steel
  • Engine
    • Horsepower rating : 1095
  • Location
    • City : PORTLAND
    • STATE : OR
  • Capacity
    • Net Tonnage : 30
  • Size
    • Register length : 58.4 Feet
    • Regular Breadth : 16.5 Feet
    • Overall Length : 58.4 Feet
    • Overall Breadt : 16.5 Feet
    • Load draft : 5.3 Feet
    • Light Draft : 5.3 Feet
    • Height : 16 Feet
  • Other
    • Year : 1952
    • EQUIP1 : NONE
    • Coast Guard Number : 265180

ADVANCED AMERICAN CONSTRUCTION

RUTH

  • Type : Tugboat
  • Construction : Steel

AAC MILLENNIUM

  • Type : Flat / Deck Barge
  • Construction : Steel

B

  • Type : Open Dry Cargo Barge
  • Construction : Steel

News

Pasha Hawaii Takes Delivery of LNG-fueled Containership

Pasha Hawaii Takes Delivery of LNG-fueled Containership

Hawaii-based Pasha Hawaii announced on Thursday it has taken delivery of a new liquefied natural gas (LNG)-fueled containership from Brownsville, Texas shipbuilder Keppel AmFELS.The 774-foot George III is the first of two new ‘Ohana Class containerships to join Pasha Hawaii’s fleet, serving the Hawaii/Mainland trade lane.

USACE Awards $1 Billion Contract for New Lock at the Soo Phase 3

USACE Awards $1 Billion Contract for New Lock at the Soo Phase 3

The U.S. Army Corps of Engineers' Detroit District said it anticipates Phase 3 construction will start this summer following a $1.068 billion contract for the New Lock at the Soo Phase 3 awarded July 1, 2022.This contract allows the contractor Kokosing Alberici Traylor, LLC (KAT), a joint venture headquartered in Westerville, Ohio to begin constructing the largest phase

More Than Two Dozen Missing after Ship Snaps in Two, Sinks Off Hong Kong

More Than Two Dozen Missing after Ship Snaps in Two, Sinks Off Hong Kong

More than two dozen crew on an engineering [reportedly an offshore wind] vessel [Fujing 001] with 30 people on board were missing after it snapped in two in waters off Hong Kong as tropical storm Chaba passed through, authorities said.Three crew members were rescued, and search and rescue operations were continuing for others about 300 km (200 miles) southwest of the city

Mackinac Island Ferry Goes Adrift After Steering Loss

Mackinac Island Ferry Goes Adrift After Steering Loss

Passengers were removed from a Mackinac Island ferry that suffered mechanical issues and went adrift in the Straits of Mackinac on Tuesday.The Star Line winter service ferry Huron had 144 passengers and four crewmembers on board when it lost steering at about 6 p.m. while on its way from Mackinac Island to St. Ignace, Mich., the U.S. Coast Guard said.

First LNG Shipment Arrives at New Dutch Floating Terminal

First LNG Shipment Arrives at New Dutch Floating Terminal

The first ship to bring a cargo of liquefied natural gas (LNG) to a new terminal at the Dutch port of Eemshaven has docked and has started the unloading process, the gas grid operator said on Thursday, part of Europe's bid to cut reliance on Russian gas.The LNG tanker Murex berthed alongside the regasification unit at the new EemsEnergyTerminal

Pasha's New LNG Containership Makes Maiden Call at Port of Long Beach

Pasha's New LNG Containership Makes Maiden Call at Port of Long Beach

Hawaii-based Pasha Hawaii welcomed the newest member to its containership fleet with the arrival of George III at the Port of Long Beach in California, where she will begin her maiden voyage to Honolulu, Hawaii. This is the first liquefied natural gas (LNG) powered vessel to fuel on the West Coast and the first to serve Hawaii.

Lack of Icebreaking Hampers Great Lakes Shipping

Lack of Icebreaking Hampers Great Lakes Shipping

A lack of Coast Guard icebreaking assets is hampering U.S.-flag shipping on the Great Lakes, according to industry coalition the Great Lakes Maritime Task Force.“The inefficiency introduced into the Great Lakes Navigation System by inadequate Coast Guard icebreaking resources impacts the carriers, their customers and the entire North American Manufacturing supply chain,” said Jim Weakley

US Coast Guard Upgrading HVAC Systems On Its Icebreaking Tugs

US Coast Guard Upgrading HVAC Systems On Its Icebreaking Tugs

The U.S. Coast Guard said its In-Service Vessel Sustainment (ISVS) Program has passed the halfway point in its effort to upgrade the heating, ventilation and air conditioning (HVAC) systems on the service’s 140-foot bay-class icebreaking tugs.The HVAC upgrade on Coast Guard Cutter Katmai Bay was completed on June 1—20 days ahead of schedule—in Cheboygan, Mich.

VIDEO: U.S. Coast Guard Medevacs Fisherman Off Nantucket

VIDEO: U.S. Coast Guard Medevacs Fisherman Off Nantucket

The U.S. Coast Guard earlier this week medevaced a fisherman from a vessel 58 miles southeast of Nantucket, Massachussets.Coast Guard Sector Southeast New England watchstanders received a notification from the fishing vessel Jean Marie on Wednesday, reporting that a crewmember was having trouble breathing, and was requesting assistance.

Canadian Coast Guard Begins Great Lakes Icebreaking

Canadian Coast Guard Begins Great Lakes Icebreaking

The Canadian Coast Guard's (CCG) annual icebreaking season on the Great Lakes, which provides assistance to the shipping industry, is underway. Working in partnership with the U.S. Coast Guard (USCG) District 9, the CCG has two icebreakers assigned to the Great Lakes for the entire winter season: CCGS Griffon and CCGS Samuel Risley.

SeaBubbles Selects Spear’s Trident Battery Solution

SeaBubbles Selects Spear’s Trident Battery Solution

U.S.-based Spear Power Systems said it will provide its Trident marine battery systems for SeaBubbles' 100% electric, hybrid hydrogen and batteries flying boats. The first-of-its-kind water vehicle designed by France-based manufacturer SeaBubbles has been developed to help alleviate heavy congestion in cities close to bodies of water.

Burger Boat Awarded New Ferry Build

Burger Boat Awarded New Ferry Build

Manitowoc, Wis., shipbuilder Burger Boat Company announced it has begun work on a new vehicle and passenger ferry for the Eastern Upper Peninsula Transportation Authority (EUPTA), located in Sault Ste. Marie, Mich.Due to launch Summer 2022, the 92-foot steel ferry will operate year-round on the St. Mary’s River in Michigan’s Upper Peninsula between Barbeau, Mich., and Neebish Island.