KOKOSING 2

  • General
    • Vessel Name : KOKOSING 2 0
    • Operator : DUROCHER MARINE, A DIVISION OF KOKOSING CONSTRUCTION CO., INC. 0
    • Ships Type (ICST) : 349 0
    • Vessel Type : 99 0
    • Construction : A 0
  • Engine
  • Location
    • City : CHEBOYGAN 0
    • STATE : MI 0
  • Capacity
    • Net Tonnage : 544 0
    • Full Load Capacity : 1500 232
  • Size
    • Register length : 150 257
    • Regular Breadth : 54 257
    • Overall Length : 150 257
    • Overall Breadt : 54 257
    • Load draft : 6 257
    • Light Draft : 2 257
    • Height : 16 257
  • Other
    • Year : 2010 0
    • EQUIP1 : DIESEL DERRICK 0
    • Coast Guard Number : 1228272 0

DUROCHER MARINE, A DIVISION OF KOKOSING CONSTRUCTION CO., INC.

  • Area of Operation : GREAT LAKES AND CONNECTING WATERWAYS 0
  • Principal Commodity : TOWING AND MARINE CONSTRUCTION 0

CHAMPION

  • Type : 36 0
  • Construction : A 0

GENERAL

  • Type : 36 0
  • Construction : A 0

JOE VAN

  • Type : 36 0
  • Construction : A 0

NANCY ANNE

  • Type : 36 0
  • Construction : A 0

RAY DUROCHER

  • Type : 36 0
  • Construction : A 0

TIMMY V

  • Type : 36 0
  • Construction : A 0

VALERIE B

  • Type : 36 0
  • Construction : A 0

BIG

  • Type : 48 0
  • Construction : A 0

D

  • Type : 43 0
  • Construction : A 0

KOKOSING 1

  • Type : 99 0
  • Construction : A 0

KOKOSING III

  • Type : 43 0
  • Construction : A 0

KOKOSING IV

  • Type : 43 0
  • Construction : A 0

M

  • Type : 43 0
  • Construction : A 0

MM

  • Type : 99 0
  • Construction : A 0

SAM II

  • Type : 99 0
  • Construction : A 0

News

Second Phase of New Soo Lock Construction Completed

Second Phase of New Soo Lock Construction Completed

U.S. Army Corps of Engineers, Detroit District’s New Lock at the Soo project in Sault Ste. Marie, Mich, substantially completed Phase 2 (Upstream Approach Walls) contract on September 17.“Phase 2 work focused on rehabilitating the upstream approach walls to guide vessels into the New Lock and will allow the vessels to moor on the wall,” said Ryan Berkompas, New Lock at the Soo Project Engineer.