JENNY

  • General
    • Vessel Name : JENNY
    • Operator : WILMINGTON TUG, INC.
    • Ships Type (ICST) : Offshore Support Vessel
    • Vessel Type : Crewboat / Supply / Utility Vessel
    • Construction : Aluminum
  • Engine
    • Horsepower rating : 900
  • Location
    • City : WILMINGTON
    • STATE : DE
  • Capacity
    • Net Tonnage : 11
    • Full Load Capacity : 17 Short ton
    • Passenger Capacity : 14
  • Size
    • Register length : 40.1 Feet
    • Regular Breadth : 12 Feet
    • Overall Length : 42 Feet
    • Overall Breadt : 12 Feet
    • Load draft : 4.5 Feet
    • Light Draft : 4 Feet
    • Height : 13 Feet
  • Other
    • Year : 1981
    • EQUIP1 : NONE
    • Coast Guard Number : 641049

WILMINGTON TUG, INC.

  • Area of Operation : DELAWARE RIVER
  • Principal Commodity : SHIP DOCKING

CAPT. HARRY

  • Type : Tugboat
  • Construction : Steel

CAREY

  • Type : Tugboat
  • Construction : Steel

CHRIS

  • Type : Tugboat
  • Construction : Steel

LINDSEY

  • Type : Tugboat
  • Construction : Steel

MADELINE

  • Type : Tugboat
  • Construction : Steel

SALLY

  • Type : Tugboat
  • Construction : Steel

SONIE

  • Type : Tugboat
  • Construction : Steel

TINA

  • Type : Tugboat
  • Construction : Steel

News

Contract Finalized for Two New Ferries for the Little Minch

Contract Finalized for Two New Ferries for the Little Minch

Caledonian Maritime Assets Ltd (CMAL) confirmed the signing of the Bank Refund Guarantee (BRG) for two new vessels for the Little Minch routes between Uig, Lochmaddy and Tarbert (Harris).Work to build the ferries will now begin at Cemre Marin Endustri A.S shipyard in Turkey, with an expected delivery date for both in June and October 2025 respectively.

Turkish Yard Starts Construction of Two Ferries for Scotland

Turkish Yard Starts Construction of Two Ferries for Scotland

Keel laying and steel-cutting ceremonies for two new ferries being built for Scotland's Caledonian Maritime Assets Ltd (CMAL) were held this week at Cemre Marin Endustri shipyard in Turkey.The first ferry in the production timeline has had its keel laid, while steel-cutting for the second vessel has also begun – three weeks earlier than planned.The new, 94.

Cemre Selected as Preferred Bidder to Build Two Ferries for Little Minch

Cemre Selected as Preferred Bidder to Build Two Ferries for Little Minch

The preferred bidder has been named for a contract to build two new ferries to support the communities at Uig, Lochmaddy and Tarbert (Harris).Caledonian Maritime Assets Ltd (CMAL) said it intends to award the contract to the Cemre Marin Endustri A.S shipyard in Turkey, following a 10 day standstill period.