GATOR

  • General
    • Vessel Name : GATOR 0
    • Operator : RIVERVIEW EQUIPMENT COMPANY, LLC 0
    • Ships Type (ICST) : 344 0
    • Vessel Type : 47 0
    • Construction : A 0
  • Engine
  • Location
    • City : PETALUMA 0
    • STATE : CA 0
  • Capacity
    • Net Tonnage : 1800 0
    • Full Load Capacity : 1824 232
  • Size
    • Register length : 195 257
    • Regular Breadth : 35 257
    • Overall Length : 195 257
    • Overall Breadt : 35 257
    • Load draft : 10.3 257
    • Light Draft : 1.5 257
    • Height : 16 257
  • Other
    • Year : 1980 0
    • EQUIP1 : NONE 0
    • Coast Guard Number : 622463 0

RIVERVIEW EQUIPMENT COMPANY, LLC

  • Area of Operation : BETWEEN SAN LEANDRO & PETALUMA OR COLLINSVILLE, CA; MIDDLEGROUND OR STEAMBOAT SLOUGH AND PETALUMA OR NAPA; SAN FRANCISCO OR PETALUMA; AND NECHES ISLAND AND REDWOOD CITY OR SAN FRANCISCO, CA 0
  • Principal Commodity : OYSTER SHELL, SAND AND CRUSHED ROCK 0

BERNICE LIND

  • Type : 35 0
  • Construction : A 0

CASSIE LIND

  • Type : 35 0
  • Construction : A 0

DENISE LIND

  • Type : 35 0
  • Construction : A 0

MICHAEL LIND

  • Type : 36 0
  • Construction : A 0

SHELLEY LIND

  • Type : 35 0
  • Construction : A 0

DANNY B

  • Type : 40 0
  • Construction : A 0

EARL BOUSE

  • Type : 43 0
  • Construction : A 0

JEANNE

  • Type : 43 0
  • Construction : A 0

JOHNNY B

  • Type : 40 0
  • Construction : A 0

LB

  • Type : 43 0
  • Construction : A 0

MIWOK CHIEF

  • Type : 40 0
  • Construction : A 0

PETER LIND

  • Type : 40 0
  • Construction : A 0

SEAHORSE

  • Type : 43 0
  • Construction : A 0

TAYLOR ANNE II

  • Type : 01 0
  • Construction : A 0

News

Venture Global gets FERC Nod for LA LNG Plant

Federal regulators on Wednesday gave Venture Global LNG permission to introduce natural gas into its Plaquemines export plant in Louisiana, documents show, moving the plant a step closer to producing the superchilled gas.The 20 million metric tons per annum (MTPA) Plaquemines LNG plant will be the second-largest U.S. export facility when fully operational.