GATOR

  • General
    • Vessel Name : GATOR
    • Operator : RIVERVIEW EQUIPMENT COMPANY, LLC
    • Ships Type (ICST) : Open Dry Cargo Barge
    • Vessel Type : Open Dry Cargo Barge
    • Construction : Steel
  • Engine
  • Location
    • City : PETALUMA
    • STATE : CA
  • Capacity
    • Net Tonnage : 1800
    • Full Load Capacity : 1824 Short ton
  • Size
    • Register length : 195 Feet
    • Regular Breadth : 35 Feet
    • Overall Length : 195 Feet
    • Overall Breadt : 35 Feet
    • Load draft : 10.3 Feet
    • Light Draft : 1.5 Feet
    • Height : 16 Feet
  • Other
    • Year : 1980
    • EQUIP1 : NONE
    • Coast Guard Number : 622463

RIVERVIEW EQUIPMENT COMPANY, LLC

  • Area of Operation : BETWEEN SAN LEANDRO & PETALUMA OR COLLINSVILLE, CA; MIDDLEGROUND OR STEAMBOAT SLOUGH AND PETALUMA OR NAPA; SAN FRANCISCO OR PETALUMA; AND NECHES ISLAND AND REDWOOD CITY OR SAN FRANCISCO, CA
  • Principal Commodity : OYSTER SHELL, SAND AND CRUSHED ROCK

BERNICE LIND

  • Type : Pushboat
  • Construction : Steel

CASSIE LIND

  • Type : Pushboat
  • Construction : Steel

DENISE LIND

  • Type : Pushboat
  • Construction : Steel

MICHAEL LIND

  • Type : Tugboat
  • Construction : Steel

SHELLEY LIND

  • Type : Pushboat
  • Construction : Steel

DANNY B

  • Type : Open Hopper Barge
  • Construction : Steel

EARL BOUSE

  • Type : Flat / Deck Barge
  • Construction : Steel

JEANNE

  • Type : Flat / Deck Barge
  • Construction : Steel

JOHNNY B

  • Type : Open Hopper Barge
  • Construction : Steel

LB

  • Type : Flat / Deck Barge
  • Construction : Steel

MIWOK CHIEF

  • Type : Open Hopper Barge
  • Construction : Steel

PETER LIND

  • Type : Open Hopper Barge
  • Construction : Steel

SEAHORSE

  • Type : Flat / Deck Barge
  • Construction : Steel

TAYLOR ANNE II

  • Type : Undefined
  • Construction : Steel

News

Wiggins Pass Dredging Commences

Wiggins Pass Dredging Commences

The Coastal Zone Management Dredge Project for Wiggins Pass near Naples, Fla. began on Wednesday, and is estimated to be completed in 40 days.Major maintenance dredging at both Wiggins Pass and Doctors Pass typically occurs on a four- year cycle with minor interim dredging in-between.