D B SEATTLE

  • General
    • Vessel Name : D B SEATTLE
    • Operator : GENERAL CONSTRUCTION CO.
    • Vessel Type : Undefined
    • Construction : Steel
  • Engine
  • Location
    • City : SEATTLE
    • STATE : WA
  • Capacity
    • Net Tonnage : 1524
    • Full Load Capacity : 4572 Short ton
  • Size
    • Register length : 216 Feet
    • Regular Breadth : 70 Feet
    • Overall Length : 216 Feet
    • Overall Breadt : 70 Feet
    • Load draft : 10 Feet
    • Light Draft : 3 Feet
  • Other
    • Year : 2014
    • EQUIP1 : NONE
    • Coast Guard Number : 1250897

GENERAL CONSTRUCTION CO.

  • Area of Operation : TACOMA, SEATTLE & PUGET SOUND, WA; AND SAN FRANCISCO BAY AREA
  • Principal Commodity : CONSTRUCTION MATERIALS

D B ANCHORAGE

  • Type : Undefined
  • Construction : Steel

D B LOS ANGELES

  • Type : Undefined
  • Construction : Steel

D. B. COLUMBIA

  • Type : Undefined
  • Construction : Steel

D.B. GENERAL

  • Type : Undefined
  • Construction : Steel

D.B. OLYMPIA

  • Type : Undefined
  • Construction : Steel

D.B. PACIFIC

  • Type : Undefined
  • Construction : Steel

GC

  • Type : Undefined
  • Construction : Steel

GC PT NO POINT

  • Type : Undefined
  • Construction : Steel

KIEWIT

  • Type : Undefined
  • Construction : Steel

KIEWIT PACIFIC

  • Type : Undefined
  • Construction : Steel

KP

  • Type : Undefined
  • Construction : Steel

PT. BASALT

  • Type : Undefined
  • Construction : Steel

PT. DEFIANCE

  • Type : Undefined
  • Construction : Steel

PT. VASHON

  • Type : Undefined
  • Construction : Steel

News

Manson Orders US' Largest Hopper Dredge

Manson Orders US' Largest Hopper Dredge

Manson Construction Co. signed a contract with Keppel AmFELS to build a new hopper dredge at the shipbuilder's facility in Brownsville, Texas, the Seattle-based marine contractor announced Monday. The new dredge is scheduled to be fully operational by spring 2023 and continues a dredge building boom currently underway in the U.S.

Kitsap Transit Gets Fed Funds for High-Speed, Low-Emission Ferry Project

Kitsap Transit Gets Fed Funds for High-Speed, Low-Emission Ferry Project

As the global maritime community collectively is slowly pushed toward decarbonization, it is generally agreed that there is no ‘silver bullet’ technical solution and that progress will come in steps, led by public/private collaboration and funding.A recent development following that script is the awarding this week of federal funds to a Washington State team working to accelerate ferry technology

US Icebreaker Suffers Fire, Engine Failure

US Icebreaker Suffers Fire, Engine Failure

The U.S. Coast Guard Cutter Healy (WAGB-20) is making an early return to its Seattle homeport, and its future Arctic operations have been canceled after the 21-year-old medium icebreaker suffered a fire in one of its main propulsion motors last week.The electrical fire was reported at 9:30 p.m.

Port of Seattle Shelves Plans for New Cruise Terminal

Port of Seattle Shelves Plans for New Cruise Terminal

Plans to develop a new cruise terminal at the Port of Seattle have been derailed by the coronavirus pandemic. The port announced Tuesday it has called off a request for industry proposals for a joint investment to build and operate a proposed new cruise terminal to serve the Alaska market.“Our current focus remains on public health,” said Port of Seattle Executive Director Steve Metruck.

Carnival Plans to Resume Some Voyages in August

Carnival Plans to Resume Some Voyages in August

Carnival Corp announced Monday it plans to resume certain North American voyages in August as it tries to rebound from the coronavirus pandemic, which has idled its ships since March.The company said its Carnival Cruise Line brand intends to restart cruises on eight ships from Miami (Carnival Horizon, Carnival Magic and Carnival Sensation)

Valaris to Lose $620,000 a Day Rig Deal with Total after BOP Drop off Angola

Valaris to Lose $620,000 a Day Rig Deal with Total after BOP Drop off Angola

Valaris, the world's largest offshore drilling company by fleet size, is set to lose one of the most lucrative contracts in the offshore drilling industry today after it recently accidentally dropped a blowout preventer stack to seabed offshore Angola.The contract, at a day rate of $620,000 per day, is with the French oil major Total for the drillship Valaris DS-8.

California Asks Trump to Deploy USNS Mecy to LA 'Immediately'

California Asks Trump to Deploy USNS Mecy to LA 'Immediately'

California’s governor on Thursday asked President Donald Trump to send a U.S. Navy hospital ship to the port of Los Angeles “immediately” as the state braces for an expected surge in the number of coronavirus cases over the next eight weeks.Trump said earlier this week the Navy hospital ships Mercy and Comfort would be pressed into service, one on each coast

Seattle Cancels Two Cruise Calls Amid Coronavirs Outbreak

Seattle Cancels Two Cruise Calls Amid Coronavirs Outbreak

The Port of Seattle announced Wednesday that it has canceled two cruise ship calls to help curb the spread of the novel coronoavirus.“This region is in a public health emergency and we will cancel the first two sailings of our cruise season,” said Port of Seattle Commission President Peter Steinbrueck. “The health, safety, and wellbeing of our residents is our top priority.

Marine News' 2020 ATB Report

Marine News' 2020 ATB Report

There’s a barge full of reasons why many operators turn to ATBs.A  mainstay of the U.S. coastwise dirty and refined products trades, articulated tug barges (ATB) have increasingly filled a void left as the fleet of Jones Act tankers (with crew complement requirements exceeding that of tugs) has aged out.

US Icebreaker Polar Star Reaches Antarctica

US Icebreaker Polar Star Reaches Antarctica

The U.S. Coast Guard's sole heavy icebreaker arrived January 22 at McMurdo Station, following a 58-day transit from the United States. Cutter Polar Star (WAGB 10) departed its’ homeport of Seattle on November 26.This year marks the Polar Star’s 23rd journey to Antarctica in support of Operation Deep Freeze, an annual joint military service mission to resupply the United States Antarctic stations

US Coast Guard Vessel Capsizes

US Coast Guard Vessel Capsizes

A U.S. Coast Guard vessel capsized on Saturday with four crew members aboard near Pier 39 in Astoria, Ore.Four Coast Guardsmen were aboard the 26-foot Coast Guard Trailerable Aids to Navigation Boat conducting routine operations when the vessel reportedly encountered a series of heavy wakes that came over the bow, which resulted in an unrecoverable starboard list that capsized the vessel

Matson Takes Delivery of First Kanaloa Class ConRo

Matson Takes Delivery of First Kanaloa Class ConRo

Largest "Con-Ro" Ship Built in U.S. Will Serve Hawaii.Matson today took delivery of its newest vessel, the largest combination container / roll-on, roll-off ("con-ro") ship ever built in the United States, from General Dynamics NASSCO. Christened 'Lurline,' the new ship is the first of two "Kanaloa Class" con-ro vessels being built for Matson by NASSCO at a total cost of approximately $500