C-ENDURANCE

  • General
    • Vessel Name : C-ENDURANCE 0
    • Operator : TEAM MARINE, LLC 0
    • Ships Type (ICST) : 422 0
    • Vessel Type : 02 0
    • Construction : A 0
  • Engine
  • Location
    • City : GALLIANO 0
    • STATE : LA 0
  • Capacity
    • Net Tonnage : 1441 0
    • Full Load Capacity : 3242 232
  • Size
    • Register length : 277.9 257
    • Regular Breadth : 60 257
    • Overall Length : 277.9 257
    • Overall Breadt : 60 257
    • Load draft : 10 257
    • Light Draft : 2 257
  • Other
    • Year : 2013 0
    • EQUIP1 : NONE 0
    • Coast Guard Number : 1247918 0

TEAM MARINE, LLC

  • Area of Operation : GULF OF MEXICO 0
  • Principal Commodity : OILFIELD EQUIPMENT 0

AMBER

  • Type : 03 0
  • Construction : A 0

C-INSTALLER

  • Type : 02 0
  • Construction : A 0

CLARENCE MOORE

  • Type : 02 0
  • Construction : A 0

FAST DELIVERER

  • Type : 03 0
  • Construction : C 0

News

Maritime Market: Cable Layer Fleet Gains Scale, Scope

Maritime Market: Cable Layer Fleet Gains Scale, Scope

Accelerating demand for subsea power and telecoms cable network construction is fuelling major expansion of the world fleet of purpose-designed cable laying, maintenance and repair vessels.Driven by the growth of the offshore renewables sector and its advance into deeper waters, as well as by widening investment in cables connecting electrical grids in different countries

OMS Group Secures $1.03B Financing to Expand Subsea Cable-Laying Fleet

OMS Group Secures $1.03B Financing to Expand Subsea Cable-Laying Fleet

Singapore-based OMS Group has secured $1.0315 billion in corporate and export credit agency-backed financing facilities, supporting a fleet expansion that includes four new fibre-optic cable-laying vessels scheduled for delivery in 2027 and 2028.The financing package comprises $911.

Keel Laid for Canada's Largest Polar Icebreaker

Keel Laid for Canada's Largest Polar Icebreaker

The 158-meter CCGS Imnaryuaq will feature 47 MW of installed power, diesel-electric propulsion and Polar Class 2 icebreaking capability, extending the Canadian Coast Guard's operational reach into the High Arctic.Seaspan Shipyards marked a major construction milestone for the Canadian Coast Guard's (CCG) future flagship polar icebreaker, CCGS Imnaryuaq

Black Sea Drone Attack Sinks Cargo Ship, Leaves 11 Missing

Black Sea Drone Attack Sinks Cargo Ship, Leaves 11 Missing

Eleven sailors were missing at sea on Tuesday from a ship sunk by a drone attack off the coast of Bulgaria, possibly the second deadly sinking of a cargo vessel in the area in a week, prompting Bulgaria to summon Russia's ambassador.Two cargo ships were hit by drones overnight and one was sunk, Bulgarian officials said.

KRATT: A Biomethane-Fueled, Ice-Class Workboat

KRATT: A Biomethane-Fueled, Ice-Class Workboat

Estonia has taken delivery of a new 38-meter multipurpose workboat that combines compressed biomethane and battery-electric propulsion with research, buoy-handling, pollution-response and rescue capabilities in a single vessel.Named KRATT, the new vessel was designed and built by Baltic Workboats for the Estonian State Fleet and christened August 12 at Saaremaa, Estonia.

Unmanned Vessels Proliferate in today's "Hybrid Navy Extravaganza"

Unmanned Vessels Proliferate in today's "Hybrid Navy Extravaganza"

Technology companies and shipyards are vying for attention as the US unmanned navy grows in size and sophistication.No too long ago, US Navy Secretary John Phelan said: “If the last few years of conflict have taught us anything, it is that we will not win the wars of the future with the platforms of the past.

BRIN Taps Shipbuilder PIRIOU for Research Vessel Pair

BRIN Taps Shipbuilder PIRIOU for Research Vessel Pair

The “Badan Riset dan Inovasi Nasional” (BRIN), Indonesia’s national agency for research and innovation, has commissioned the French shipbuilder PIRIOU to design and build two research vessels:a multimission offshore hydro-oceanographic vessel (ORV – Ocean Going Research Vessel) and a coastal research vessel (CRV – Coastal Research Vessel).

Trump Pauses Effort to Escort Ships in Strait of Hormuz

Trump Pauses Effort to Escort Ships in Strait of Hormuz

U.S. President Donald Trump said on Tuesday he would briefly pause an operation to help escort ships through the Strait of Hormuz, citing progress toward a comprehensive agreement with Iran."We have mutually agreed that, while the Blockade will remain in full force and effect, Project Freedom ...

Orange Marine Orders Two More Cable Laying and Repair Vessels from Vard

Orange Marine Orders Two More Cable Laying and Repair Vessels from Vard

Norwegian ship designer and builder VARD has secured on order from France’s Orange Marine for two additional cable laying and repair vessels of the VARD 9 03 design, to be built at Colombo Dockyard in Sri Lanka.The vessels will be based on the same design as CS Sophie Germain, delivered to Orange Marine in July 2023.

Saronic Completes Multi-Day Corsair Deployment with 24/7 Operations

Saronic Completes Multi-Day Corsair Deployment with 24/7 Operations

Last month, the Saronic team completed a continuous, week-long, day and night test operation designed to push the limits of Corsair, their 24-foot Autonomous Surface Vessel currently under contract with the U.S. Navy.Conducted and funded by the company as part of ongoing independent research and development efforts

OMS Group Celebrates Keel-Laying of CS Resilience

OMS Group Celebrates Keel-Laying of CS Resilience

Construction of OMS Group’s next-generation cable-laying vessel, CS Resilience, has reached a milestone with the laying of its keel at CRIST Shipyard in Gdynia, Poland, on September 17, 2026.The keel laying marks the start of hull assembly for the first of two vessels being built to the ULSTEIN SX252 design for OMS Group’s GREAT-Class fleet.

OMS Group Cuts First Steel for its Third Cable Laying Vessel

OMS Group Cuts First Steel for its Third Cable Laying Vessel

OMS Group has started construction of CS Resilience, the third vessel in its next-generation GREAT-Class fleet, with a first steel cutting ceremony held at CRIST's shipyard in Gdynia, Poland.The milestone marks the start of construction of the cable-laying vessel, which is scheduled to enter service in 2028 and forms part of OMS Group's long-term fleet expansion program.