CB

  • General
    • Vessel Name : CB
    • Operator : EPL OIL & GAS, INC.
    • Ships Type (ICST) : Liquid Tank Barge (Other)
    • Vessel Type : Other Liquid Cargo Barge Not Elsewhere Included
    • Construction : Steel
  • Engine
  • Location
    • City : VENICE
    • STATE : LA
  • Capacity
    • Net Tonnage : 200
    • Full Load Capacity : 400 Short ton
  • Size
    • Register length : 110 Feet
    • Regular Breadth : 30 Feet
    • Overall Length : 110 Feet
    • Overall Breadt : 30 Feet
    • Load draft : 5 Feet
    • Light Draft : 1.5 Feet
    • Height : 11 Feet
  • Other
    • Year : 1955
    • EQUIP1 : NONE

EPL OIL & GAS, INC.

  • Area of Operation : EAST BAY MOUTH OF MISSISSIPPI RIVER TO VENICE, LA
  • Principal Commodity : GENERAL MATERIAL AND WATER

BIG AL

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Aluminum

CROKER

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Aluminum

GOLDEN SHELL

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Aluminum

NAVAID

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Aluminum

SUPERVISOR

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Aluminum

TJ

  • Type : Flat / Deck Barge
  • Construction : Steel

News

Electronic Navigational Charts: An Update and Some Issues

Electronic Navigational Charts: An Update and Some Issues

In November 2019, the Office of Coast Survey (OCS), part of the National Oceanic and Atmospheric Administration (NOAA), announced the start of a five-year program to “sunset” all raster and paper nautical charts.NOAA has produced electronic navigational charts (ENCs) since 1993. In the 2019 notice, NOAA writes that “ENC sales increased 425% since 2008

RWO's BWMS Earns USCG Type Approval

RWO's BWMS Earns USCG Type Approval

The U.S. Coast Guard (USCG) said its Marine Safety Center issued type approval to RWO GmbH for its ballast water management system (BWMS) after a detailed review of the manufacturer’s application determined the system met the requirements of 46 CFR 162.060.The treatment principle of the CleanBallast-Ocean Barrier System (CB-OBS) BWMS consists of filtration and electrochemical disinfection during