ARKANSAS

  • General
    • Vessel Name : ARKANSAS
    • Operator : JANTRAN, INC.
    • Ships Type (ICST) : Tugboat
    • Vessel Type : Tugboat
    • Construction : Steel
  • Engine
    • Horsepower rating : 4400
  • Location
    • City : ROSEDALE
    • STATE : MS
  • Capacity
    • Net Tonnage : 163
  • Size
    • Register length : 116 Feet
    • Regular Breadth : 31 Feet
    • Overall Length : 116 Feet
    • Overall Breadt : 31 Feet
    • Load draft : 9 Feet
    • Light Draft : 7.6 Feet
    • Height : 32 Feet
  • Other
    • Rebuilt year : 1990
    • Year : 1990
    • EQUIP1 : NONE
    • Coast Guard Number : 264305
    • REBLT : *

JANTRAN, INC.

  • Area of Operation : ARKANSAS AND LOWER MISSISSIPPI RIVERS
  • Principal Commodity : TOWING; COAL, GRAIN, FERTILIZER, STEEL, CEMENT AND ALUMINUM

BROTHER WILSON

  • Type : Tugboat
  • Construction : Steel

BRUCE OAKLEY

  • Type : Tugboat
  • Construction : Steel

CITY OF CLEVELAND

  • Type : Pushboat
  • Construction : Steel

CONCORDIA

  • Type : Tugboat
  • Construction : Steel

DAVID WORK

  • Type : Tugboat
  • Construction : Steel

DOROTHY M JANOUSH

  • Type : Tugboat
  • Construction : Steel

FRANCES ANN

  • Type : Pushboat
  • Construction : Steel

LELAND SPEAKES

  • Type : Pushboat
  • Construction : Steel

LUCY JANOUSH

  • Type : Tugboat
  • Construction : Steel

MARY PARKER

  • Type : Pushboat
  • Construction : Steel

MISS ALEX

  • Type : Tugboat
  • Construction : Steel

MR. TOM

  • Type : Pushboat
  • Construction : Steel

NAPOLEON

  • Type : Pushboat
  • Construction : Steel

RIVERTON

  • Type : Pushboat
  • Construction : Steel

ROCK BLUFF

  • Type : Pushboat
  • Construction : Steel

VICTORIA

  • Type : Tugboat
  • Construction : Steel

WAXHAW

  • Type : Pushboat
  • Construction : Steel

JAN

  • Type : Covered Hopper Barge
  • Construction : Steel

ROSEDALE

  • Type : Covered Hopper Barge
  • Construction : Steel

News

2020 Vision

2020 Vision

The Congress worked hard and most importantly together at the end of the recently-concluded First Session in December to finalize and pass Fiscal Year (FY) 2020 appropriations that included the Energy & Water Development (E&WD) Appropriations bill that funds the U.S. Army Corps of Engineers’ (Corps) work on the nations’ waterways.

Robust Dredging on America’s Inland Waterways

Robust Dredging on America’s Inland Waterways

Inland Dredging Company helps keep commerce flowing on America’s inland waterway system.Dyersburg, Tenn. based Inland Dredging Company completed dredging projects spanning eight states and across four U.S. Army Corps of Engineers Districts. Beginning in July and finishing in December (2019), Inland Dredging crews dredged ports and harbors along the Mighty Mississippi River, Ouachita River

US Gulf Production Restarting After Barry

US Gulf Production Restarting After Barry

U.S. oil companies on Monday began restoring some of the more than nearly 74% production shut at U.S. Gulf of Mexico platforms ahead of Hurricane Barry, the U.S. offshore drilling regulator said.There was 1.3 million barrels per day (bpd) of oil production off line in the U.S.-regulated areas of the Gulf of Mexico on Monday, about 80,000 barrels less than on Sunday, according to the U.S.

Trump's FY21 Budget Request 'Inadequate' -WCI

Trump's FY21 Budget Request 'Inadequate' -WCI

President Trump’s Fiscal Year 2021 (FY21) budget request released on Monday is "astonishingly inadequate" says industry advocate Waterways Council, Inc. (WCI).The FY21 budget provides $0 for construction of ongoing priority navigation projects cost-shared through the Inland Waterways Trust Fund (IWTF); cuts funding for the U.S. Army Corps of Engineers’ Civil Works Mission by 22% ($5.

Barges Break Free, Hit Oklahoma Dam, Sink

Barges Break Free, Hit Oklahoma Dam, Sink

According to a report on WeatherChannel.com, a pair of barges broke free and hit Lock and Dam 16 on the flooded Arkansas River on Thursday, May 23, 2019, north of Webber Falls, Oklahoma.Early reports citing the Oklahoma Highway Patrol said there did not appear to be any damage to the lock.

President's Request Cuts Funding for USACE

President's Request Cuts Funding for USACE

Waterways Council, Inc. (WCI) reacted to the Trump Administration’s release of an outline of its top-line FY20 budget numbers yesterday. Today, the Corps of Engineers released its account and project-specific funding levels.  For the U.S. Army Corps of Engineers’ Civil Works program, the FY20 budget proposes $4.827 billion, a 31% cut from the FY19 appropriated amount of $7.0 billion.

WCI Applauds Corps’ FY20 Work Plan

WCI Applauds Corps’ FY20 Work Plan

Waterways Council, Inc. (WCI) offered praise for Congress, the U.S. Department of Agriculture and the the U.S. Army Corps of Engineers’ for the Corps’ Fiscal Year 2020 (FY20) work plan that lays out allocations for funds provided in the FY20 Energy & Water Development Appropriations bill toward the Corps’ civil works mission. The work plan was released late yesterday.

Port Authority: 'A strong start to 2019'

Tonnage on river increases 60 percent from 2018Through the first two months of 2019, the Port of Little Rock and its stevedorer, LSI, have seen a year-to-year increase of 33 barges, a 62% increase in activity. Additionally, tonnage is up 49,000 tons year-to-year (60%) with a total of 130,400 tons.

Waterways Council Reacts to Budget Numbers

Waterways Council Reacts to Budget Numbers

Waterways Council, Inc. (WCI) reacted to the Trump Administration’s release of an outline of its top-line FY20 budget numbers yesterday.  Today, the Corps of Engineers released its account and project-specific funding levels.For the U.S. Army Corps of Engineers’ Civil Works program, the FY20 budget proposes $4.827 billion, a 31% cut from the FY19 appropriated amount of $7.0 billion.