AO

  • General
    • Vessel Name : AO
    • Operator : MCGINNIS, INC.
    • Ships Type (ICST) : Liquid Tank Barge (Double Hull)
    • Vessel Type : Liquid Cargo Barge (Double Hull)
    • Construction : Steel
  • Engine
  • Location
    • City : ASHLAND
    • STATE : KY
  • Capacity
    • Net Tonnage : 797
    • Full Load Capacity : 1783 Short ton
  • Size
    • Register length : 147.5 Feet
    • Regular Breadth : 52.5 Feet
    • Overall Length : 147.5 Feet
    • Overall Breadt : 52.5 Feet
    • Load draft : 9 Feet
    • Light Draft : 2 Feet
    • Height : 13.3 Feet
  • Other
    • Year : 1973
    • EQUIP1 : DEEP WELL PUMP
    • Coast Guard Number : CG020230

MCGINNIS, INC.

  • Area of Operation : OHIO RIVER AND TRIBUTARIES
  • Principal Commodity : SAND AND GRAVEL

ALAN ALBRIGHT

  • Type : Pushboat
  • Construction : Steel

BRANT

  • Type : Pushboat
  • Construction : Steel

BRUCE D

  • Type : Pushboat
  • Construction : Steel

BTU SPECIAL

  • Type : Pushboat
  • Construction : Steel

CANADIAN

  • Type : Pushboat
  • Construction : Steel

CAPT. JOHN CHURCH

  • Type : Pushboat
  • Construction : Steel

CHRIS ARDEN

  • Type : Pushboat
  • Construction : Steel

CHUCK PIEPMEIER

  • Type : Pushboat
  • Construction : Steel

CITY OF SOUTH POINT

  • Type : Pushboat
  • Construction : Steel

E. W. THOMPSON

  • Type : Pushboat
  • Construction : Steel

GARRY LACEY

  • Type : Pushboat
  • Construction : Steel

JIM LANCASTER

  • Type : Tugboat
  • Construction : Steel

JO ANN MCGINNIS

  • Type : Pushboat
  • Construction : Steel

JOHN GREER

  • Type : Pushboat
  • Construction : Steel

MAC MCGINNIS

  • Type : Pushboat
  • Construction : Steel

MOUNTAIN GIRL

  • Type : Pushboat
  • Construction : Steel

MR. KING

  • Type : Pushboat
  • Construction : Steel

POCAHONTAS

  • Type : Pushboat
  • Construction : Steel

SUSAN E

  • Type : Pushboat
  • Construction : Steel

TOM BUSSLER

  • Type : Pushboat
  • Construction : Steel

TOMBIGBEE

  • Type : Pushboat
  • Construction : Steel

VIVIAN MC GINNIS

  • Type : Pushboat
  • Construction : Steel

WILLIAM B

  • Type : Pushboat
  • Construction : Steel

MGI

  • Type : Covered Hopper Barge
  • Construction : Steel

WTT

  • Type : Open Hopper Barge
  • Construction : Steel

EBL

  • Type : Liquid Cargo Barge (Double Hull)
  • Construction : Steel

News

India, Russia to Widen Maritime Cooperation

India, Russia to Widen Maritime Cooperation

India and Russia will explore the possibility of using new transport corridors such as the Northern Sea Route and Eastern Maritime Corridor between Vladivostok and Chennai to widen maritime cooperation, the Indian government said on Wednesday.A decision to work towards this was made during a meeting between India's Ports, Shipping and Waterways minister, Sarbananda Sonowal

NASSCO Delivers USNS Harvey Milk (T-AO 206)

NASSCO Delivers USNS Harvey Milk (T-AO 206)

The General Dynamics NASSCO shipyard in San Diego on Tuesday delivered the future USNS Harvey Milk (T-AO 206) to the U.S. Navy.The ship is the second of the Navy’s John Lewis-class fleet oiler program, following the series' lead vessel, USNS John Lewis (T-AO 205), delivered in July 2022.Operated by Military Sealift Command (MSC), the 742-foot-long oilers are designed to transfer fuel to U.S.

NASSCO Awarded $736 Million to Build T-AO 213

NASSCO Awarded $736 Million to Build T-AO 213

San Diego shipbuilder General Dynamics NASSCO announced it has been awarded a $736 million modification to the existing T-AO contract for construction of a ninth ship (T-AO 213) in the John Lewis-class fleet oiler program. Construction is scheduled to begin in the third quarter of 2025.In 2016, the U.S.

SECNAV Names Ship After Harriet Tubman

SECNAV Names Ship After Harriet Tubman

Secretary of the Navy (SECNAV) Carlos Del Toro announced that a future John Lewis-class oiler, T-AO 205-class, will be named after American abolitionist and social activist Harriet Tubman.SECNAV Del Toro made the announcement during an Emancipation Celebration at Harriet Tubman Underground Railroad Visitor Center in Church Creek, Md. National Park Service Director Chuck Sams, who is also a U.S.

Vestdavit To Supply US Navy With Davits for New Class of Oilers

Vestdavit To Supply US Navy With Davits for New Class of Oilers

Davits supplied by Vestdavit will be used for the launch and recovery of fast craft to support refuelling operations at sea for the US naval fleet after the company was awarded a major contract for six vessels being built by General Dynamics NASSCO in the US.The contract covers delivery of 12 high-specification PLRH-5000 davits to be installed on the John Lewis-class of T-AO oilers ordered by

Alabama Shipyard Wins USNS John Lenthall Repair Work

Alabama Shipyard Wins USNS John Lenthall Repair Work

Alabama Shipyard has been awarded a contract for an 81-calendar day shipyard availability for the mid-term availability of Military Sealift Command’s (MSC) fleet replenishment oiler USNS John Lenthall (T-AO 189).The $10,729,026 firm-fixed-price contract includes a base period and five unexercised options, which if exercised, would increase the cumulative value of this contract to $11,265,523.

Boston Ship Repair Awarded Contract for USNS Patuxent Overhaul

Boston Ship Repair Awarded Contract for USNS Patuxent Overhaul

Boston Ship Repair has been awarded a contract for the the regular overhaul/dry docking of Military Sealift Command’s fleet replenishment oiler USNS Patuxent (T-AO 201).The $14,759,604 firm-fixed-price contract includes a base period and four options which, if exercised, would bring the cumulative value of this contract to $15,853,866.