P C S PHOSPHATE

  • Engineering District : 12 0
  • TSO Series Number : 5 0
  • Principal Commodity List : FERTILIZER, MOLTEN SULPHUR, PHOSPHORIC ACID AND SULFURIC ACID 0
  • Area of Operation : AURORA, NC; MOREHEAD CITY, NC; PAMLICO RIVER; INTERCOASTAL WATERWAY; NEUSE RIVER AND NEWPORT RIVER 0
  • Vessels
    • Tugboat : 2 0
    • Double Hull Tank Barge : 6 0
    • Dry Covered Barge : 4 0
    • Vessels List : BEAUFORT BELLE, PAMLICO, LC, PCS 0
  • Address
    1530 NC HIGHWAY 306 SOUTH AURORA NC 27806
  • Contact
    • Phone : 252-322-8200 0
1530 NC HIGHWAY 306 SOUTH AURORA NC 27806

Managed Vessels

BEAUFORT BELLE

  • Type : 36 0
  • Construction : A 0

PAMLICO

  • Type : 36 0
  • Construction : A 0

LC

  • Type : 48 0
  • Construction : A 0

PCS

  • Type : 48 0
  • Construction : A 0

Related News [P C S PHOSPHATE]

Tankers Transiting Strait of Hormuz Face Disruption as Tensions Rise

Tankers Transiting Strait of Hormuz Face Disruption as Tensions Rise

At least two supertankers made U-turns near the Strait of Hormuz following U.S. military strikes on Iran, shiptracking data shows, as more than a week of violence in the region prompts vessels to speed, pause, or alter their journeys.Washington's decision to join Israel's attacks on Iran has stoked fears that Iran could retaliate by closing the strait between Iran and Oman through which around

Bayesian Took Less Than 15 Seconds to Heel Irrecoverably

Bayesian Took Less Than 15 Seconds to Heel Irrecoverably

The UK Marine Accident Investigation Branch (MAIB) has released its interim report on the foundering of the Bayesian, saying the yacht may have been vulnerable to high winds and that such winds may have been evident at the time of the accident.On 19 August 2024, the UK registered large sailing yacht Bayesian foundered in high winds 0.5 nautical miles south-east of the port of Porticello, Italy.

Main Iron Works Delivers 10th Vessel for Ingram Marine Group

Main Iron Works Delivers 10th Vessel for Ingram Marine Group

Benny Cenac Jr.’s Houma based Main Iron Works Company has completed the 10th boat newbuild for Ingram Marine Group. This partnership with Main Iron Works and Ingram began in 2021 and included the construction of 10 new towboats to be completed by the end of 2024.  The first towboat, the Adrienne M.

VIDEO: Explosion Rocks Yang Ming Containership YM Mobility in Chinese Port

VIDEO: Explosion Rocks Yang Ming Containership YM Mobility in Chinese Port

Taiwanese shipping firm Yang Ming Marine Transport Corp said one of its cargo ships caught fire on Friday at China's Ningbo-Zhoushan Port, one of the world's busiest.Earlier, Chinese state media said an explosion was reported at the port and shockwaves were felt a kilometer away.Yang Ming Marine Transport said a fire occurred on board the YM Mobility while it was operating in the port.

Lehmann Marine Launches New Water-Cooled LFP Battery System

Lehmann Marine Launches New Water-Cooled LFP Battery System

Lehmann Marine, a leading provider of maritime battery systems, has introduced its latest product development, AQUBE, at the Electric & Hybrid Marine Expo in Amsterdam. AQUBE combines the compact and flexible design of Lehmann Marine‘s CUBE with advanced water-cooling technology derived from the proven COBRA battery system.

EST-Floattech Expands Octopus Portfolio with New Battery Modules

EST-Floattech Expands Octopus Portfolio with New Battery Modules

EST-Floattech, Dutch energy storage systems provider for maritime and industrial applications, has expanded its Octopus Series with the introduction of Lithium Iron Phosphate (LFP) battery modules.With the latest addition the company aims to address the market demand for battery systems based on another chemical configuration.

Odyssey Marine Exploration Welcomes New Executive Order for Deep Sea Mining

Odyssey Marine Exploration Welcomes New Executive Order for Deep Sea Mining

Odyssey Marine Exploration, Inc. is pleased to see the issuance of a new Executive Order titled Unleashing America’s Offshore Critical Minerals and Resources. In addition, the company confirms that it currently has no specific plans to issue any securities under its universal shelf registration statement on Form S-3

Kim Heng’s Rebuilt Geotechnical Survey Vessel Sets Sail

Kim Heng’s Rebuilt Geotechnical Survey Vessel Sets Sail

Singapore's offshore services firm Kim Heng has held a christening ceremony for the Bridgewater Discovery, a DP2 geotechnical survey vessel, rebuilt in 2024.With the Bridgewater Discovery vessel, Kim Heng has marked another milestone in its expansion into the renewable business sector.

Kongsberg Maritime to Equip Bibby Marine’s Fully-Electric CSOV

Kongsberg Maritime to Equip Bibby Marine’s Fully-Electric CSOV

Kongsberg Maritime has secured a contract to supply an integrated package of equipment for Bibby Marine’s new electric Commissioning Service Operation Vessel (eCSOV), the world’s first fully-electric offshore vessel.Kongsberg Maritime will provide full-electric rim-drive propulsion with azimuth and tunnel thrusters.

Corvus ESS Powers the World's First Fully Electric Offshore Vessel

Corvus ESS Powers the World's First Fully Electric Offshore Vessel

Corvus Energy will deliver a mega-size battery system for the first fully electric offshore vessel ever to be built. The vessel is an electric Commissioning Service Operation Vessel (eCSOV) that will be constructed by Armon shipyard in Spain for UK-based shipowner Bibby Marine Ltd.

First Coastal Virginia Offshore Wind Substation Checks In at US Port

First Coastal Virginia Offshore Wind Substation Checks In at US Port

Port of Virginia’s Portsmouth Marine Terminal has welcomed the arrival of the first substation to be installed at the Coastal Virginia Offshore Wind (CVOW) project.The CS Wind Offshore and Semco Maritime consortium was selected by Dominion Energy in 2021 to deliver three 880 MW offshore substations for the project, under development by Dominion Energy.

First Jacket Foundation for CVOW Substation Sets Sail from Danish Port

First Jacket Foundation for CVOW Substation Sets Sail from Danish Port

The first jacket foundation for the substation of the Coastal Virginia Offshore Wind (CVOW) project has departed from the Danish Port of Esbjerg and is on its way to the United States to be installed at the country’s largest offshore wind farm.The first of three offshore jacket foundations, standing 60-meter-tall and weighing approximately 2,445.