WEST WIND

  • General
    • Vessel Name : WEST WIND 0
    • Operator : WEST WIND TOWING, LLC 0
    • Ships Type (ICST) : 432 0
    • Vessel Type : 35 0
    • Construction : A 0
  • Engine
    • Horsepower rating : 1000 0
  • Location
    • City : HOUSTON 0
    • STATE : TX 0
  • Capacity
    • Net Tonnage : 69 0
  • Size
    • Register length : 57.8 257
    • Regular Breadth : 22.1 257
    • Overall Length : 57.8 257
    • Overall Breadt : 22.1 257
    • Load draft : 7.9 257
    • Light Draft : 7.9 257
    • Height : 30 257
  • Other
    • Year : 1978 0
    • EQUIP1 : NONE 0
    • Coast Guard Number : 594757 0

WEST WIND TOWING, LLC

  • Area of Operation : HOUSTON SHIP CHANNEL AND SURROUNDING AREAS 0
  • Principal Commodity : TOWING BULK CARGO, LIQUID / CHEMICAL 0

News

Equinor Halts Activities on Empire Wind Project After US Stop-Work Order

Equinor Halts Activities on Empire Wind Project After US Stop-Work Order

Equinor said it is complying with a stop-work order issued by the U.S. Department of the Interior’s Bureau of Ocean Energy Management (BOEM), which ordered the suspension of offshore construction activities on the Empire Wind project citing national security concerns.Empire Offshore Wind LLC, the project company

Trump Freezes Five Offshore Wind Projects, Company Shares Plummet

Trump Freezes Five Offshore Wind Projects, Company Shares Plummet

The Trump administration suspended leases on Monday for five large offshore wind projects that are under construction off the U.S. East Coast over what it called national security concerns, sending shares of offshore wind companies plunging.The suspension was the latest blow for offshore wind developers that have faced repeated disruptions to their multi-billion-dollar projects under U.S.

Cadeler’s WTIV Newbuild En Route to Europe for Maiden Offshore Wind Job

Cadeler’s WTIV Newbuild En Route to Europe for Maiden Offshore Wind Job

Hanwha Ocean has delivered the Wind Mover wind turbine installation vessel (WTIV) to offshore wind contractor Cadeler, completing the second vessel in the company’s M-class series about one month ahead of schedule.The vessel was formally signed over on November 28 and sailed away on December 2, following a naming ceremony at Hanwha Ocean’s shipyard in Korea.

Cadeler Welcomes First A-Class Offshore Wind Jack-Up Vessel to its Fleet

Cadeler Welcomes First A-Class Offshore Wind Jack-Up Vessel to its Fleet

Danish offshore wind installation firm Cadeler has taken delivery of its first A-class wind turbine installation vessel (WTIV), Wind Ally, designed to transport up to six sets of XXL monopile foundations per round trip.Wind Ally has become the ninth vessel on the water in Cadeler’s growing fleet of next-generation WTIVs.

Canada Readies for Offshore Wind

Canada Readies for Offshore Wind

Sean Fraser, Canada’s Minister responsible for the Atlantic Canada Opportunities Agency, has announced that strategic direction has been given to the Canada–Nova Scotia Offshore Energy Regulator as a next step toward realizing Canada’s first-ever offshore wind project.Fraser made the announcement on behalf of Tim Hodgson, Canada’s Minister of Energy and Natural Resources

Cadeler to Install Turbines at Ocean Winds’ Polish Offshore Wind Farm

Cadeler to Install Turbines at Ocean Winds’ Polish Offshore Wind Farm

Danish offshore wind installation firm Cadeler has signed a firm contract with Ocean Winds for the transportation and installation of 26 Siemens Gamesa 14 MW offshore wind turbines at the BC-Wind offshore wind farm in the Polish Baltic Sea. The signing of this firm contract follows the Vessel Reservation Agreement (VRA) signed in February 2025 between Cadeler and Ocean Winds.

US Halts Revolution Wind Project

US Halts Revolution Wind Project

The Trump administration on Friday ordered Denmark's Orsted to stop far-advanced construction on an offshore wind project near Rhode Island, in a move that threatens to exacerbate the company's financial troubles.With construction now frozen at 80% completion, Orsted has no immediate path to revenue generation, heightening pressure on the company as it seeks to shore up finances through a $9.

All Inter-Array Cables Installed at 488 MW French Offshore Wind Farm

All Inter-Array Cables Installed at 488 MW French Offshore Wind Farm

The final inter-array cable has been installed at Îles d’Yeu and Noirmoutier (EMYN) offshore wind farm in France, being developed by Les Éoliennes en Mer Services.The 61st and final inter-array cable was installed on June 22 at the EMYN offshore wind farm, Louis Dreyfus TravOcean said on social media.The accomplishment paves the way for a transmission capacity of 512 MW.

DEME Concludes Havfram Acquisition

DEME Concludes Havfram Acquisition

Belgium-based offshore installation services company DEME has completed the acquisition Havfram, an offshore wind installation contractor based in Norway, in a deal valued at approximately $1.02 billion (€900 million).The transaction, first announced in April 2025, has passed all customary closing conditions.

Jan De Nul Installs First Foundation at RWE’s Thor Offshore Wind Farm

Jan De Nul Installs First Foundation at RWE’s Thor Offshore Wind Farm

Jan De Nul has kicked off the installation campaign of the monopile foundations for RWE’s Thor offshore wind farm, completing the installation of the first of 72 monopiles with its heavy-lift vessel Les Alizés.When finished, Denmark’s largest wind farm to date will provide enough renewable energy to power more than a million Danish households.

Navigating the Stormy Seas of U.S. Offshore Wind

Navigating the Stormy Seas of U.S. Offshore Wind

Companies that once committed to investing in U.S. offshore wind infrastructure and supply chains are now scrapping their plans as the industry experiences significant challenges. These setbacks stem from project delays, soaring costs, and the potential loss of federal support under former President Donald Trump’s proposed policies.

Ocean Winds Lines Up Cadeler’s Vessel for Work at Polish Offshore Wind Farm

Ocean Winds Lines Up Cadeler’s Vessel for Work at Polish Offshore Wind Farm

Danish offshore wind installation firm Cadeler has signed a vessel reservation agreement with Ocean Winds for the installation of the wind turbine generators at BC-Wind offshore wind farm in the Polish Baltic Sea.The potential value of the contract to be negotiated during the pendency of the agreement is estimated to be between $49 million and $58 million.