WC

  • General
    • Vessel Name : WC 0
    • Operator : WATERFRONT CONSTRUCTION, INC. 0
    • Ships Type (ICST) : 341 0
    • Vessel Type : 43 0
    • Construction : A 0
  • Engine
  • Location
    • City : SEATTLE 0
    • STATE : WA 0
  • Capacity
    • Net Tonnage : 150 0
    • Full Load Capacity : 150 232
  • Size
    • Register length : 80 257
    • Regular Breadth : 30.6 257
    • Overall Length : 80 257
    • Overall Breadt : 30.6 257
    • Load draft : 6 257
    • Light Draft : 3 257
    • Height : 10 257
  • Other
    • EQUIP1 : TRACK CRANE 0
    • Coast Guard Number : NOT/DOC 0

WATERFRONT CONSTRUCTION, INC.

  • Area of Operation : LAKE, RIVER HARBORS AND INTERCOASTAL WATERWAYS IN AND AROUND WASHINGTON STATE PUGET SOUND & SAN JUAN ISLANDS / SALISH SEA 0
  • Principal Commodity : BUILDING MATERIALS - I.E. SAND, DIRT, LUMBER, PILINGS, ROCK, PRE-FABRICATED CONSTRUCTION PIERS & EQUIPMENT 0

JUSTIN

  • Type : 03 0
  • Construction : A 0

SPEELYA

  • Type : 02 0
  • Construction : A 0

DIANE

  • Type : 36 0
  • Construction : A 0

LELA

  • Type : 36 0
  • Construction : A 0

MARGARET ANN

  • Type : 36 0
  • Construction : A 0

MISS TANA

  • Type : 43 0
  • Construction : A 0

R

  • Type : 74 0
  • Construction : A 0

News

Marine News' Naval Architecture Roundtable

Marine News' Naval Architecture Roundtable

Marine News spoke to leaders at three North American naval architecture and marine engineering firms about some of the latest trends impacting their business today. Morgan Fanberg, CEO, Glosten; Robert Ekse, President, Elliott Bay Design Group; and Wade Carson, CEO, Vard Marine, weigh in on topics ranging from digitalization and decarbonization to the naval architect talent pool.

Energy Transfer, TotalEnergies Pen Deal for Crude Oil Offtake from Blue Marlin Offshore Port

Energy Transfer, TotalEnergies Pen Deal for Crude Oil Offtake from Blue Marlin Offshore Port

Energy Transfer LP has entered into a non-binding Heads of Agreement (HOA) with TotalEnergies related to term crude oil offtake from its proposed Blue Marlin Offshore Port for 4 million barrels per month. The HOA is subject to the negotiation and execution of definitive agreements and the satisfaction of other conditions, including Energy Transfer taking a final investment decision on the project