VULCAN

  • General
    • Vessel Name : VULCAN 0
    • Operator : MANSON CONSTRUCTION CO. 0
    • Ships Type (ICST) : 341 0
    • Vessel Type : 43 0
    • Construction : A 0
  • Engine
  • Location
    • City : SEATTLE 0
    • STATE : WA 0
  • Capacity
    • Net Tonnage : 881 0
    • Full Load Capacity : 881 232
  • Size
    • Register length : 142 257
    • Regular Breadth : 58 257
    • Overall Length : 142 257
    • Overall Breadt : 58 257
    • Load draft : 7.6 257
    • Light Draft : 2.6 257
  • Other
    • EQUIP1 : NONE 0
    • Coast Guard Number : CG053320 0

MANSON CONSTRUCTION CO.

SOUTHMAN

  • Type : 02 0
  • Construction : A 0

VALHALLA

  • Type : 02 0
  • Construction : A 0

ERICA M

  • Type : 35 0
  • Construction : A 0

MANSON

  • Type : 40 0
  • Construction : A 0

MANSON D

  • Type : 99 0
  • Construction : A 0

SCANDIA

  • Type : 43 0
  • Construction : A 0

VASA

  • Type : 43 0
  • Construction : A 0

NORSEMAN

  • Type : 01 0
  • Construction : A 0

VALKYRIE

  • Type : 01 0
  • Construction : A 0

VIKING

  • Type : 01 0
  • Construction : A 0

News

Laborde Products Powers M/V Larry Gravely Towboat

Laborde Products Powers M/V Larry Gravely Towboat

Laborde Products powered the newbuild M/V Larry Gravely, constructed by Diversified Marine in Houma, Louisiana.The twin-screw towboat is equipped with a pair of Mitsubishi Tier 3 S6R2 main engines, each rated at 803 horsepower at 1,400 RPM. The engines were applied to support the vessel’s operating profile and the steady, day-to-day demands of aggregate service on the inland waterways.

Starlink Outage Exposes Pentagon’s Growing Reliance on SpaceX

Starlink Outage Exposes Pentagon’s Growing Reliance on SpaceX

Last August, U.S. Navy officials carrying out a test of unmanned vessels realized they had hit a single point of failure: Starlink. A global outage across Elon Musk’s satellite network affecting millions of Starlink users had left two dozen unmanned surface vessels bobbing off the California coast, disrupting communications and halting operations for almost an hour.