VULCAN

  • General
    • Vessel Name : VULCAN
    • Operator : MANSON CONSTRUCTION CO.
    • Ships Type (ICST) : Dry Cargo Deck Barge
    • Vessel Type : Flat / Deck Barge
    • Construction : Steel
  • Engine
  • Location
    • City : SEATTLE
    • STATE : WA
  • Capacity
    • Net Tonnage : 881
    • Full Load Capacity : 881 Short ton
  • Size
    • Register length : 142 Feet
    • Regular Breadth : 58 Feet
    • Overall Length : 142 Feet
    • Overall Breadt : 58 Feet
    • Load draft : 7.6 Feet
    • Light Draft : 2.6 Feet
  • Other
    • EQUIP1 : NONE
    • Coast Guard Number : CG053320

MANSON CONSTRUCTION CO.

SOUTHMAN

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Steel

VALHALLA

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Steel

ERICA M

  • Type : Pushboat
  • Construction : Steel

MANSON

  • Type : Open Hopper Barge
  • Construction : Steel

MANSON D

  • Type : Other
  • Construction : Steel

SCANDIA

  • Type : Flat / Deck Barge
  • Construction : Steel

VASA

  • Type : Flat / Deck Barge
  • Construction : Steel

NORSEMAN

  • Type : Undefined
  • Construction : Steel

VALKYRIE

  • Type : Undefined
  • Construction : Steel

VIKING

  • Type : Undefined
  • Construction : Steel

News

ULA Orders Rocket Transport Ship from Bollinger

ULA Orders Rocket Transport Ship from Bollinger

American aerospace manufacturer ULA on Wednesday announced it has ordered a new ship to transport rockets from its factory in Decatur, Ala. to launch sites at Cape Canaveral Space Force Station in Florida and Vandenberg Space Force Base in California.ULA said it awarded a contract to build the 356-foot-long roll-on/roll-off vessel to Bollinger Shipyards

Jadestone Energy Working to Address Tank Defect on Montara Venture FPSO

Jadestone Energy Working to Address Tank Defect on Montara Venture FPSO

Asia Pacific-focused Jadestone Energy, which last month shut down production from its Montara Venture FPSO off Western Australia due to an issue with the FPSO's 4S ballast water tank,is still working to address the defect in the tank.Jadestone Energy said Thursday that since the shutdown, tank 4S has been emptied and cleaned, with an inspection starting on August 8, 2023.