SME

  • General
    • Vessel Name : SME
    • Operator : SHAWNEE MARINE ENTERPRISES, INC.
    • Ships Type (ICST) : Dry Cargo Covered Barge
    • Vessel Type : Covered Dry Cargo Barge
    • Construction : Steel
  • Engine
  • Location
    • City : COLUMBIA
    • STATE : IL
  • Capacity
    • Net Tonnage : 764
    • Full Load Capacity : 1500 Short ton
  • Size
    • Register length : 200 Feet
    • Regular Breadth : 35 Feet
    • Overall Length : 200 Feet
    • Overall Breadt : 35 Feet
    • Load draft : 10.5 Feet
    • Light Draft : 1.5 Feet
    • Height : 13 Feet
  • Other
    • Year : 2008
    • EQUIP1 : NONE
    • Coast Guard Number : 1208666

SHAWNEE MARINE ENTERPRISES, INC.

  • Area of Operation : MISSISSIPPI RIVER
  • Principal Commodity : GRAIN AND AGGREGATE

BIG

  • Type : Flat / Deck Barge
  • Construction : Steel

JWS

  • Type : Covered Dry Cargo Barge
  • Construction : Steel

KMK

  • Type : Covered Dry Cargo Barge
  • Construction : Steel

News

REGULATORY REVIEW: Subchapter M

REGULATORY REVIEW: Subchapter M

One Year In: Industry SME (Captain) Pat Folan weighs in from the front lines.It has been an interesting year for towing industry. As the new Subchapter M towboat rule rolled out, it didn’t take long to discover that the regulation wasn’t perfect. As stakeholders look ahead to what comes next, it is also helpful to take a look back at what went right, what didn’t, and more importantly – why.The U.

Study: Ship Tech a $278B Market by 2030

Study: Ship Tech a $278B Market by 2030

New research into maritime startups concludes that higher bandwidth connecting ships to shore at lower costs is empowering a new breed of single-minded innovators to bring the true benefits of digitalization to the shipping and offshore sectors, according to a report conducted for Inmarsat by UK GovTech venture firm and research house, PUBLIC, The report, ‘Trade 2.

Maersk Outlines Year in Review, Outlook

Maersk Outlines Year in Review, Outlook

Steve Felder, Managing Director, Maersk South Asia has outlined the developments in 2019 and what we can expect in 2020:“While the global container demand was lower in 2019 due to weaker growth in the global economy, India witnessed a broad-based slowdown in its import export trade as well after a growth of several years.

Completion of the EU Research Project SHIPLYS

Completion of the EU Research Project SHIPLYS

SHIPLYS (Ship life cycle software solutions) is a three-year project that started in September 2016. The project is in response to needs of SME naval architects, shipbuilders and ship-owners, who, in order to survive in the world market, need to improve their capability to reduce the time and costs of design and production.

USCG Seeking SME's for Working Groups

USCG Seeking SME's for Working Groups

The National Maritime Center is still seeking participants for the three remaining merchant mariner examination working group meetings in 2019.Deck working group – September 10-12Engine working group – October 22-24Deck working group – December 3-5Examination reviews are currently scheduled to take place at the National Maritime Center in Martinsburg, West Virginia.

SSA Forms Digital Transformation Committee

SSA Forms Digital Transformation Committee

The Singapore Shipping Association (SSA)—the industry voice of Singapore’s maritime community—today organized its inaugural Tech and Demo Day, during which it announced the formation of a new Digital Transformation Committee.The association said that the Tech and Demo Day aims to help shipping companies—including the small and medium-sized enterprises (SME)—catalyze their adoption of

JGC Containers Ready for Moray East OWF

JGC Containers Ready for Moray East OWF

UK engineering company JGC Engineering and Technical Serviceshas, on behalf of Siemens, completed the construction of high voltage equipment containers for the Moray East offshore substation platforms."The Moray East offshore windfarm project completed its first fabrication milestone as the Thurso SME engineering firm finalised work on the containers which will be fitted in the three offshore