SJ

  • General
    • Vessel Name : SJ
    • Operator : ARMSTRONG LOGISTICS SERVICES, LLC
    • Ships Type (ICST) : Open Dry Cargo Barge
    • Vessel Type : Open Hopper Barge
    • Construction : Steel
  • Engine
  • Location
    • City : MADISON- VILLE
    • STATE : KY
  • Capacity
    • Net Tonnage : 1375
    • Full Load Capacity : 3098 Short ton
  • Size
    • Register length : 260 Feet
    • Regular Breadth : 52.6 Feet
    • Overall Length : 260 Feet
    • Overall Breadt : 52.6 Feet
    • Load draft : 9 Feet
    • Light Draft : 1.5 Feet
    • Height : 14.7 Feet
  • Other
    • Year : 1983
    • EQUIP1 : NONE
    • Coast Guard Number : 665815

ARMSTRONG LOGISTICS SERVICES, LLC

  • Area of Operation : GREEN RIVER BETWEEN MILES 76.7 AND 81.2
  • Principal Commodity : COAL

News

Machine Odyssey: Autonomous Voyage Around Denmark Halfway Complete

Machine Odyssey: Autonomous Voyage Around Denmark Halfway Complete

A high-tech workboat is more than halfway through its record-setting journey to autonomously circumnavigate Denmark.The Nellie Bly, equipped with Sea Machines autonomous command and control systems, arrived in Laeso, Denmark on Saturday, marking the halfway point of the 1,000-nautical-mile autonomous voyage.

Volvo Penta to Supply Gensets for Five New Electric Ferries

Volvo Penta to Supply Gensets for Five New Electric Ferries

Turkish boat builder Sefine Shipyard has won a contract to supply Norwegian operator Boreal with five electric ferries – each supported by two Volvo Penta D13 MG IMO III generator sets (gensets). The ferries will operate to-and-from the islands in the inner Oslo fjord and run scheduled services throughout the day.

MacGregor Wins €31 Million RoRo Orders from Asia

MacGregor Wins €31 Million RoRo Orders from Asia

MacGregor, part of Cargotec, said it has secured equipment orders for eight RoRo vessels to be built in Asia. The orders are booked into Cargotec's second (€9 million) and third quarter (€22 million) 2021 order intake with deliveries planned to commence during the second quarter of 2022 and completed during the third quarter of 2023.