SILVER RIVER

  • General
    • Vessel Name : SILVER RIVER
    • Operator : T & T BOAT RENTALS
    • Ships Type (ICST) : Passenger (Cruise)
    • Vessel Type : Passenger Vessel
    • Construction : Aluminum
  • Engine
    • Horsepower rating : 300
  • Location
    • City : EMPIRE
    • STATE : LA
  • Capacity
    • Net Tonnage : 3
    • Full Load Capacity : 9 Short ton
    • Passenger Capacity : 5
  • Size
    • Register length : 26 Feet
    • Regular Breadth : 10 Feet
    • Overall Length : 26 Feet
    • Overall Breadt : 10 Feet
    • Load draft : 1.5 Feet
    • Light Draft : 0.7 Feet
    • Height : 11 Feet
  • Other
    • Year : 2005
    • EQUIP1 : NONE
    • Coast Guard Number : NOT/DOC

T & T BOAT RENTALS

  • Area of Operation : VENICE, BURAS, PORT SULPHUR AND SHALLOW INLAND AREAS
  • Principal Commodity : MEN AND LIGHT EQUIPMENT

SILVER SKY

  • Type : Passenger Vessel
  • Construction : Aluminum

News

More Than 1,000 Barges Backed Up on Lower Mississippi River

More Than 1,000 Barges Backed Up on Lower Mississippi River

More than 1,000 barges were backed up on the lower Mississippi River on Friday, according to the U.S. Coast Guard, while traders anxiously awaited an update on the shutdown of a portion of the waterway that is critical to U.S. crop exports.The Coast Guard on Tuesday stopped all traffic on the river near Memphis, Tennessee, after a fracture was discovered in the Hernando DeSoto Bridge

Barge Traffic Backs Up Near Memphis Amid Mississippi River Closure

Barge Traffic Backs Up Near Memphis Amid Mississippi River Closure

More than 700 barges are delayed on the lower Mississippi River on Thursday after a structural crack in the Hernando de Soto Bridge prompted the U.S. Coast Guard to halt vessel traffic on a portion of the crucial trade artery.The Coast Guard restricted all vessel traffic between mile markers 736 and 737 on the Mississippi River near Memphis after the Arkansas Department of Transportation (ARDOT)

Vessels Queue After Mississippi River Closed Near Memphis

Vessels Queue After Mississippi River Closed Near Memphis

Towing vessels and barges are lining up near Memphis, Tenn. after a significant structural crack discovered on the I-40 Hernando de Soto Bridge bridge led the U.S. Coast Guard to halt vessel traffic in the area.At least 16 vessels with a total of 229 barges are waiting to transit in either direction after vessel traffic was restricted between mile markers 736 and 737 on the Lower Mississippi

River Dance: Grounding Triggers Breakaway Barges

River Dance: Grounding Triggers Breakaway Barges

It was a beautiful mid-summer afternoon in the nation’s heartland. The skies were clear, the sun was shining and the variable southwest breeze barely caused a ripple on the muddy water of the winding river. Optimistic fishermen lined the riverbanks and a few recreational boaters were cruising close to the floating docks lining both shores.

Ingram Barge to Acquire Cheryl K and San Jacinto River Fleet

Ingram Barge to Acquire Cheryl K and San Jacinto River Fleet

Nashville-based Ingram Barge Company announced Tuesday that its wholly-owned subsidiary Houston Fleeting Services has reached a deal to acquire the business assets Houston-based Cheryl K and San Jacinto River Fleet. According to Ingram Barge, the purchase allows it to expand its footprint into the Houston area and along the Texas Gulf Coast while simultaneously growing its logistics

Bulk Carrier Grounds After Losing Propulsion in the Columbia River

Bulk Carrier Grounds After Losing Propulsion in the Columbia River

A 608-foot bulk carrier that suffered an engine failure and ran aground in the Columbia River Thursday has been refloated without injury or pollution, the U.S. Coast Guard said.Watchstanders at Coast Guard Sector Columbia River received a report at 12:50 a.m. that the Marshall Islands-flagged Genco Auvergne had run soft aground due to a loss of main engine propulsion while transiting down the

Mississippi River Ship Channel Deepening Begins

Mississippi River Ship Channel Deepening Begins

The U.S. Army Corps of Engineers (USACE) officially kicked off the project to deepen of the Mississippi River Ship Channel to 50 feet Friday, as Weeks Marine’s cutterhead dredge Captain Frank started dredging 5 miles above the Head of Passes.The USACE awarded this first contract for the Ship Channel deepening to Weeks Marine on September 3, 2020, and the Captain Frank started the deepening Friday.

Uber Boat Launches in London

Uber Boat Launches in London

Uber is taking to the water in London. Earlier this month the international ride-hailing company marked the start of a partnership with water taxi operator Thames Clippers to provide its services on the River Thames.The first vessel donning Uber Boat by Thames Clippers branding set sail on August 3 as part of a fleet of 20 passenger vessels departing from 23 piers across London from Putney in

US Coast Guard Commissions Cutter Harold Miller

US Coast Guard Commissions Cutter Harold Miller

The U.S. Coast Guard held a commissioning ceremony for the Coast Guard Cutter Harold Miller, the service's 38th Sentinel-class fast response cutter, at Sector Field Office Galveston, Texas, Wednesday.Rear Adm. John Nadeau, Eighth Coast Guard District commander, presided over the commissioning ceremony, along with Lt. Michael Salerno, Coast Guard Cutter Harold Miller’s commanding officer.

New Staten Island Ferry Launched at Eastern

New Staten Island Ferry Launched at Eastern

Eastern Shipbuilding Group, Inc. (ESG) launched the second of three new Staten Island “Ollis Class” Ferries for the City of New York Department of Transportation (NYCDOT) Staten Island Ferry Division. The Sandy Ground was launched Friday at Eastern’s Allanton facility in Panama City, Fla.

World First: Cruise Ship Piloted Remotely During Sea Trials

World First: Cruise Ship Piloted Remotely During Sea Trials

Royal Caribbean's Silversea Cruises says it is preparing to take delivery of its newest ship, Silver Origin, following a unique set of COVID-19-related challenges overcome by the shipbuilder and innovative sea trials that included world-first remote operations.The new 100-passenger ultra-luxury cruise ship was built by Dutch shipyard De Hoop

COVID-19 Economic Recovery Should Include Infrastructure Investment

COVID-19 Economic Recovery Should Include Infrastructure Investment

As the nation continues to be impacted by COVID-19, there are silver linings to the crisis: family time and togetherness, gratitude for what we had before it was taken away, and a chance to seek opportunities to be better and more productive.As funding bills related to the COVID-19 crisis move forward, there may be an opportunity for the nation to better itself by modernizing its infrastructure.