SEA PRIDE

  • General
    • Vessel Name : SEA PRIDE
    • Operator : ALASCO TOWING CO.
    • Ships Type (ICST) : Tugboat
    • Vessel Type : Tugboat
    • Construction : Steel
  • Engine
    • Horsepower rating : 365
  • Location
    • City : WRANGELL
    • STATE : AK
  • Capacity
    • Net Tonnage : 20
  • Size
    • Register length : 37.5 Feet
    • Regular Breadth : 13.5 Feet
    • Overall Length : 40 Feet
    • Overall Breadt : 14 Feet
    • Load draft : 7 Feet
    • Light Draft : 6 Feet
    • Height : 30 Feet
  • Other
    • Year : 1963
    • EQUIP1 : NONE
    • Coast Guard Number : 292241

ALASCO TOWING CO.

  • Area of Operation : S. E. ALASKA

News

Ingalls Wins $936 Mln Contract to Build US Navy Destroyer

Ingalls Wins $936 Mln Contract to Build US Navy Destroyer

Huntington Ingalls Industries’ (HII) Ingalls Shipbuilding division has been awarded a $936 million contract for the construction of an additional Arleigh Burke-class (DDG 51) Flight III destroyer for the U.S. Navy. In 2018, Ingalls was awarded a $5.1 billion fixed-price incentive, multiyear contract for construction of six Arleigh Burke-class Flight III destroyers for the U.S. Navy.

MarAd Insights: “In peace and war” -- Even Against a Virus

MarAd Insights: “In peace and war” -- Even Against a Virus

The U.S. maritime industry takes great pride in our motto: “In Peace and War.” It sums what we’re all about. From colonial times, through the Revolution, the Civil War, two World Wars, several regional conflicts, and many natural and humanitarian disasters, we got the cargo delivered because our economic security and our national security depend on it.

Australia Pressing Yang Ming to Pay for Container Cleanup

Australia Pressing Yang Ming to Pay for Container Cleanup

Dozens of containers lost from a ship at sea have been recovered off the coast of Australia as the country's maritime authority continues to press the vessel's owner to pay the $11 million cleanup costs.The 63 boxes plucked from the bottom of the Tasman Sea are among more than 80 lost from Yang Ming's containership YM Efficiency about 20 miles from shore in June 2018.

First YM Efficiency Containers Retrieved

First YM Efficiency Containers Retrieved

Work is underway to retrieve dozens of containers lost from a containership off the coast of Australia, with the first boxes raised to the surface this week. The first container was recovered from the seafloor on Monday using a hydraulic crane and rigging, remotely operated underwater vehicles (ROV) and a specially manufactured steel basket, the Australian Maritime Safety Authority said.

Developer Seeking New Home for SS United States

Developer Seeking New Home for SS United States

A real estate development company is looking for a U.S. city to become the new home for one of America's most historic ocean liners.Having reached a deal with the ship’s nonprofit owner last year, RXR Realty has been developing a plan to restore the famed SS United States and this week issued a Request for Expressions of Interest (RFEI) seeking a permanent waterfront location where America’s

Austal Launches High-speed Ferry

Austal Launches High-speed Ferry

Austal Limited announce that Austal Australia has launched Hull 394, the first of two 118-meter high-speed trimaran ferries currently under construction for Fred. Olsen Express of the Canary Islands.The aluminum vehicle-passenger ferry, to be known as Bajamar Express, was launched at Austal’s Henderson, Western Australia shipyard on February 4, and is now in the final stages of fit out

Houston Ship Channel Reopens After 7-hour Closure

Houston Ship Channel Reopens After 7-hour Closure

The Houston Ship Channel reopened on Tuesday morning after a seven-hour closure to raise a fishing vessel that sank in mid-January near the waterway's entrance in the Gulf of Mexico, according to the Houston ship pilots association.The ship channel, a 53-mile waterway connecting the busiest U.S. petrochemical port with the Gulf of Mexico, reopened at 10:15 a.m.

Coal Carrier Sunshine Pride Delivered

Coal Carrier Sunshine Pride Delivered

Today, Sunshine Pride, an NYK-operated coal carrier for Joban Joint Power Co. Ltd., was delivered by Japanese builder Tsuneishi Shipbuilding Co. Ltd.Under a long-term contract, this vessel will be dedicated to the transport of coal to generate electricity at the Nakoso Power Station in the city of Iwaki, Japan.

Search Called Off for Two Missing After Ship Collision

Search Called Off for Two Missing After Ship Collision

Responders have called off a search for two fisherman missing following a fatal ship collision near Galveston, Texas, the U.S. Coast Guard said on Thursday.One crew member has been rescued, one is deceased and two remain missing at the conclusion of a three-day search involving the Coast Guard and local responders that covered more than 49 square miles by aerial flights

One Dead, Two Missing in Galveston Ship Collision

One Dead, Two Missing in Galveston Ship Collision

The US Coast Guard and local authorities on Wednesday continue to search for two fishermen missing after a fatal vessel collision in Galveston, Texas.The Coast Guard said four fisherman were forced into the water on Tuesday afternoon when their 81-foot vessel Pappy's Pride capsized following a collision with the 600-foot chemical tanker Bow Fortune near the Galveston jetties.

Aircraft Carrier John F. Kennedy Christened

Aircraft Carrier John F. Kennedy Christened

The U.S. Navy’s newest nuclear-powered aircraft carrier John F. Kennedy (CVN 79) was christened Saturday during a ceremony at Huntington Ingalls Industries’ (HII) Newport News Shipbuilding division.The second aircraft carrier in the Ford Class, John F. Kennedy (CVN 79) is also the second aircraft carrier built by Newport News Shipbuilding named for JFK.

Fincantieri Fits New Midsection in Star Breeze

Fincantieri Fits New Midsection in Star Breeze

The most complex cruise ship lengthening ever undertaken is clipping along at Fincantieri’s Palermo yard.The final welding cut to Windstar Cruises’ Star Breeze was completed and  the ship’s 25.6-meter/84-foot prefabricated midsection was glided into place between the two halves in the drydock, an operation that took just half an hour.