RACHEL SHANNON

  • General
    • Vessel Name : RACHEL SHANNON
    • Operator : BARBARA ANN, LLC
    • Ships Type (ICST) : 432
    • Vessel Type : Pushboat
    • Construction : Steel
  • Engine
    • Horsepower rating : 900
  • Location
    • City : MORGAN CITY
    • STATE : LA
  • Capacity
    • Net Tonnage : 71
  • Size
    • Register length : 61 Feet
    • Regular Breadth : 22 Feet
    • Overall Length : 61 Feet
    • Overall Breadt : 22 Feet
    • Load draft : 7 Feet
    • Light Draft : 7 Feet
    • Height : 20 Feet
  • Other
    • Year : 1967
    • EQUIP1 : NONE
    • Coast Guard Number : 506969

BARBARA ANN, LLC

  • Area of Operation : GULF OF MEXICO
  • Principal Commodity : PERSONNEL AND EQUIPMENT

MS BRYELLE

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Steel

MS. ISABELLE

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Steel

RANDI NICHOLE

  • Type : Crewboat / Supply / Utility Vessel
  • Construction : Steel

News

Shannon Buys Ardent's Australian Subsidiary

Shannon Buys Ardent's Australian Subsidiary

The Ardent Group sold its Australian subsidiary Ardent Oceania Pty Ltd to its managing director Drew Shannon. It will continue as an independent company under the new name United Salvage Pty Ltd.Ardent, a maritime emergency management and wreck removal company created by the 2015 merger of salvage divisions of Svitzer and Crowley

EPA Tier 4: Difficult and Contentious, 12 Years and Counting

EPA Tier 4: Difficult and Contentious, 12 Years and Counting

When it comes to complying with EPA’s Tier 4 emissions regulations, there’s no shortage of creativity emerging from America’s maritime engineering firms. Companies such as Hug Engineering are offering flexible, customized aftertreatment-based control systems that can assemble almost in modular like fashion.

Vendors Sought to Inform Electric Ferry Design

Vendors Sought to Inform Electric Ferry Design

Skagit County Public Works and vessel designer Glosten say they are seeking technical information and cost estimates from vendors to inform design decisions related to the electrical system, the propulsion system, the shore side electrical system, and the automated charging plug of the all-electric ferry design to replace the 41-year-old M/V Guemes currently in operation on the U.S. West Coast.

Port of Virginia Posts Record July Volumes

Port of Virginia Posts Record July Volumes

July is Second Busiest Month in Port of Virginia’s History.The Port of Virginia in July processed 265,559 TEUs (twenty-foot equivalent units) in July, making it the second busiest month in the port’s history.The strong cargo performance was driven by an increase of more than 4 percent in loaded import containers, and a jump of nearly 18 percent in export empty containers

Saga Cruises Hit by Coronavirus Cancellations

Saga Cruises Hit by Coronavirus Cancellations

Travel and insurance group Saga said it has seen a higher level of near-term cancellations for its cruises and tours due to the coronavirus epidemic.Forward passenger tour bookings were down around 20% versus the prior year, with a more significant impact in recent weeks, the UK group that caters for the over-50s said in a statement on Thursday.