NEW ENGLAND COAST

  • General
    • Vessel Name : NEW ENGLAND COAST 0
    • Operator : DANN MARINE TOWING 0
    • Ships Type (ICST) : 431 0
    • Vessel Type : 36 0
    • Construction : A 0
  • Engine
    • Horsepower rating : 2150 0
  • Location
    • City : WILMINGTON 0
    • STATE : DE 0
  • Capacity
    • Net Tonnage : 132 0
  • Size
    • Register length : 105 257
    • Regular Breadth : 30 257
    • Overall Length : 105 257
    • Overall Breadt : 30 257
    • Load draft : 13.6 257
    • Light Draft : 10.5 257
    • Height : 45 257
  • Other
    • Year : 1966 0
    • EQUIP1 : NONE 0
    • Coast Guard Number : 503273 0

DANN MARINE TOWING

  • Area of Operation : ATLANTIC OCEAN, GULF OF MEXICO AND LAKES 0

ATLANTIC COAST

  • Type : 36 0
  • Construction : A 0

CALUSA COAST

  • Type : 36 0
  • Construction : A 0

CHESAPEAKE COAST

  • Type : 36 0
  • Construction : A 0

CORAL COAST

  • Type : 36 0
  • Construction : A 0

CRYSTAL COAST

  • Type : 35 0
  • Construction : A 0

DISCOVERY COAST

  • Type : 36 0
  • Construction : A 0

EMERALD COAST

  • Type : 35 0
  • Construction : A 0

FIRST COAST

  • Type : 36 0
  • Construction : A 0

GOLD COAST

  • Type : 35 0
  • Construction : A 0

GULF COAST

  • Type : 36 0
  • Construction : A 0

IVORY COAST

  • Type : 36 0
  • Construction : A 0

PALM COAST

  • Type : 35 0
  • Construction : A 0

SEA COAST

  • Type : 36 0
  • Construction : A 0

SUN COAST

  • Type : 36 0
  • Construction : A 0

TREASURE COAST

  • Type : 36 0
  • Construction : A 0

ZEUS

  • Type : 36 0
  • Construction : A 0

CEMENT TRANSPORTER

  • Type : 41 0
  • Construction : A 0

News

Seaway7 Secures Inter-Array Cabling Work for East Anglia TWO Offshore Wind Farm

Seaway7 Secures Inter-Array Cabling Work for East Anglia TWO Offshore Wind Farm

Seaway7, part of the Subsea7 Group, has secured a ‘substantial’ contract from ScottishPower Renewables for the transport and installation of the inter-array cables of the East Anglia TWO offshore wind project.Seaway7’s scope of work for East Anglia TWO includes the engineering, supply and installation of the 64 inter-array cables.

Cadeler Gets Turbine and Foundation Installation Job for UK Offshore Wind Farm

Cadeler Gets Turbine and Foundation Installation Job for UK Offshore Wind Farm

Danish firm Cadeler has signed firm contracts, valued up to $415 million, for the transport and installation of turbines and foundations for East Anglia TWO offshore wind farm, being developed by ScottishPower Renewables, part of Iberdrola Group.The contracts, valued between $390 million and $415 million, are for the transportation and installation of 64 turbines, each rated at 15 MW

US East Coast, Gulf Coast Port Workers Union to Resume Contract Talks in November

US East Coast, Gulf Coast Port Workers Union to Resume Contract Talks in November

The union representing 45,000 East Coast and Gulf Coast dockworkers and a group representing employers will resume negotiations next month toward reaching a new six-year contract ahead of a Jan. 15 deadline, they said on Friday.The International Longshoremen's Association union agreed to end a three-day strike on Oct.

New England States Move Forward with Three Giant Offshore Wind Farms

New England States Move Forward with Three Giant Offshore Wind Farms

Massachusetts and Rhode Island are moving ahead with three offshore wind projects totaling 2.9 gigawatts (GW), or enough electricity to power about 1.6 million homes, government officials announced on Friday.The project selections, following a joint solicitation in March for wind farms to be built off of New England's shores

US Coast Guard Academy Students Seek $130 Million Over Alleged Sexual Assaults

US Coast Guard Academy Students Seek $130 Million Over Alleged Sexual Assaults

More than a dozen former U.S. Coast Guard Academy students who say they were victims of sexual assault filed complaints on Thursday seeking $130 million in damages, accusing the school of allowing sexual violence to go unchecked.The former students filed administrative claims with the U.S.

First Offshore Wind Turbine Stands Tall at US Revolution Wind Project

First Offshore Wind Turbine Stands Tall at US Revolution Wind Project

The first 11 MW Siemens Gamesa offshore wind turbine, out of total 65 planned, has been installed at Ørsted’s 704 MW Revolution Wind offshore wind farm in the United States.Once in operation, Revolution Wind will have the capacity to generate 400 MW of clean power for Rhode Island and 304 MW for Connecticut, enough to power more than 350

GE Vernova Turbine Blade Fails at UK's Dogger Bank Offshore Wind Farm

GE Vernova Turbine Blade Fails at UK's Dogger Bank Offshore Wind Farm

GE Vernova's shares fell nearly 7% on Friday following a turbine-blade failure at an offshore wind farm in the UK, the latest in a string of incidents involving the power service firm's equipment.The incident was reported at the Dogger Bank A project, located more than 130 km off the northeast coast of England, according to a statement from the project authorities.

UK to End Use of Controversial Bibby Stockholm Migrant Barge

UK to End Use of Controversial Bibby Stockholm Migrant Barge

Britain's new Labor government will end the use of the controversial Bibby Stockholm barge to house migrants off the south coast of England as part of its overhaul of the asylum system, it said on Tuesday.Use of the vessel, which can house up to 500 men, began under the Conservative government with the aim of cutting the 8 million pounds a day cost of hotel accommodation for asylum seekers while

At Least Five People Drown Trying to Cross English Channel

At Least Five People Drown Trying to Cross English Channel

At least five people, including a child, died in an attempt to cross the English Channel from France, hours after Britain passed a bill to deport asylum seekers to Rwanda to try to deter the dangerous crossings.The deaths of one child, a woman and three men occurred on an overcrowded small boat carrying around 110 people attempting to cross one of the busiest shipping lanes in the world.

Equinor, BP Cancel Contract to Sell Offshore Wind Power to New York

Equinor, BP Cancel Contract to Sell Offshore Wind Power to New York

European energy firms Equinor and BP  terminated their agreement to sell power to New York state from their proposed Empire Wind 2 offshore wind farm, citing rising inflation, higher borrowing costs, and supply chain issues."This agreement reflects changed economic circumstances on an industry-wide scale and repositions an already mature project to continue development in anticipation of new

Vineyard Wind Supplies First Power to Grid

Vineyard Wind Supplies First Power to Grid

Copenhagen Infrastructure Partners and Avangrid said on Wednesday their joint venture Vineyard Wind began generating power for the first time, supplying five megawatts (MW) to the New England grid.The project is expected to have five turbines operating at full capacity in early 2024, the companies said.

U.S. Coast Guard Responds to Gulf of Mexico Oil Spill

U.S. Coast Guard Responds to Gulf of Mexico Oil Spill

The U.S. Coast Guard was leading an oil spill clean-up in the Gulf of Mexico on Friday, partnering with local and federal agencies and companies after a Main Pass Oil Gathering Co (MPOG) underwater pipeline began leaking.The crude oil pipeline is around 19 miles (30 km) offshore in the Gulf of Mexico, east of Venice, Louisiana, the U.S. Environmental Protection Agency (EPA) said.