NAUTILUS

  • General
    • Vessel Name : NAUTILUS 0
    • Operator : BILLY B, INC. 0
    • Ships Type (ICST) : 422 0
    • Vessel Type : 02 0
    • Construction : C 0
  • Engine
    • Horsepower rating : 2700 0
  • Location
    • City : GALVESTON 0
    • STATE : TX 0
  • Capacity
    • Net Tonnage : 66 0
    • Full Load Capacity : 30 232
    • Passenger Capacity : 63 0
  • Size
    • Register length : 101.4 257
    • Regular Breadth : 24 257
    • Overall Length : 110 257
    • Overall Breadt : 24 257
    • Load draft : 10.2 257
    • Light Draft : 8.9 257
    • Height : 18 257
  • Other
    • Year : 1979 0
    • EQUIP1 : NONE 0
    • Coast Guard Number : 615490 0

BILLY B, INC.

  • Area of Operation : GULF COAST OF TEXAS AND LOUISIANA TO A MAXIMUM OF 200 NAUTICAL MILES OFFSHORE 0
  • Principal Commodity : COMPANY PERSONNEL, EQUIPMENT AND SUPPLIES 0

APOLLO

  • Type : 02 0
  • Construction : C 0

MISS ROSEANN

  • Type : 02 0
  • Construction : C 0

RED EAGLE

  • Type : 02 0
  • Construction : C 0

News

TDI-Brooks' Retrofitted Vessel Arrives to US for Offshore Wind Work

TDI-Brooks' Retrofitted Vessel Arrives to US for Offshore Wind Work

TDI-Brooks' latest dynamic positioning vessel, the RV Nautilus, has reached the shores of the East Coast of the United States ahead of work for offshore wind sector.After undergoing a six-month retrofit in Las Palmas, the 2000-built vessel will be put to work to provide support for offshore wind projects and various other subsea needs.

Esgian Week 26 Report: Drilling Activity is High

Esgian Week 26 Report: Drilling Activity is High

Esgian provides an update on drilling activity in its Week 26 Rig Analytics Market Roundup.Report SummaryContractsVentura Offshore has been granted exclusive marketing rights from Hanwha Drilling LLC for the newbuild 12,000-ft 7th generation drillship, Tidal Action, for an ongoing tender process in Brazil.

TDI-Brooks' New Vessel Ready for Work

TDI-Brooks' New Vessel Ready for Work

TDI-Brooks' newest vessel R/V Nautilus (formerly known as Nautical Geo) is ready to go to work following a 6-month retrofit period in Las Palmas.The DP2 vessel is currently enroute to the U.S. East Coast to provide support for offshore wind operations. It is expected to be fully prepared for the first offshore wind program by early March.