MARTHA'S VINEYARD

  • General
    • Vessel Name : MARTHA'S VINEYARD 0
    • Operator : WOODS HOLE, MARTHA'S VINEYARD & NANTUCKET STEAMSHIP AUTHORITY 0
    • Ships Type (ICST) : 329 0
    • Vessel Type : 13 0
    • Construction : A 0
  • Engine
    • Horsepower rating : 3000 0
  • Location
    • City : WOODS HOLE 0
    • STATE : MA 0
  • Capacity
    • Net Tonnage : 882 0
    • Full Load Capacity : 388 232
    • Passenger Capacity : 1263 0
  • Size
    • Register length : 224.1 257
    • Regular Breadth : 60 257
    • Overall Length : 230 257
    • Overall Breadt : 60 257
    • Load draft : 10.6 257
    • Light Draft : 8.5 257
    • Height : 63 257
  • Other
    • Year : 1993 0
    • EQUIP1 : NONE 0
    • Coast Guard Number : 997221 0

WOODS HOLE, MARTHA'S VINEYARD & NANTUCKET STEAMSHIP AUTHORITY

  • Area of Operation : WOODS HOLE, MARTHA'S VINEYARD, NANTUCKET AND HYANNIS 0
  • Principal Commodity : PASSENGERS, MAIL, VEHICLES AND GENERAL CARGO 0

EAGLE

  • Type : 13 0
  • Construction : A 0

GAY HEAD

  • Type : 13 0
  • Construction : A 0

GOVERNOR

  • Type : 13 0
  • Construction : A 0

ISLAND HOME

  • Type : 13 0
  • Construction : A 0

IYANOUGH

  • Type : 13 0
  • Construction : C 0

KATAMA

  • Type : 13 0
  • Construction : A 0

NANTUCKET

  • Type : 13 0
  • Construction : A 0

SANKATY

  • Type : 13 0
  • Construction : A 0

News

OSVs Gain New Life

OSVs Gain New Life

Faced with an aging fleet, the Woods Hole, Martha’s Vineyard and Nantucket Steamship Authority has turned to converted offshore support vessels (OSV) to breathe new life into its ferry operations.The operator announced its purchase of the OSVs HOS Shooting Star and HOS Lode Star from Hornbeck Offshore Services in 2022, to replace its open-deck freight vessels Gay Head and Katama

New England States Move Forward with Three Giant Offshore Wind Farms

New England States Move Forward with Three Giant Offshore Wind Farms

Massachusetts and Rhode Island are moving ahead with three offshore wind projects totaling 2.9 gigawatts (GW), or enough electricity to power about 1.6 million homes, government officials announced on Friday.The project selections, following a joint solicitation in March for wind farms to be built off of New England's shores

GE Vernova Turbine Blade Fails at UK's Dogger Bank Offshore Wind Farm

GE Vernova Turbine Blade Fails at UK's Dogger Bank Offshore Wind Farm

GE Vernova's shares fell nearly 7% on Friday following a turbine-blade failure at an offshore wind farm in the UK, the latest in a string of incidents involving the power service firm's equipment.The incident was reported at the Dogger Bank A project, located more than 130 km off the northeast coast of England, according to a statement from the project authorities.

GE Vernova Says Faulty Manufacturing Led to Offshore Wind Blade Failure

GE Vernova Says Faulty Manufacturing Led to Offshore Wind Blade Failure

Power services firm GE Vernova on Wednesday said a manufacturing flaw led to a turbine blade failure at the Vineyard Wind offshore project off the coast of Massachusetts earlier this month.The turbine blade broke on July 13 and left potentially dangerous debris on beaches on the island of Nantucket. Later, U.S. authorities ordered a shutdown of the project, which is still under construction.

Washington State Ferries Goes Out to Bid for New Hybrid-electric Vessels

Washington State Ferries Goes Out to Bid for New Hybrid-electric Vessels

Deliveries will begin in 2028 if all goes well. Delays and escalating costs have bedeviled the procurement process up until now.Washington State Ferries on Thursday published an invitation to bid on building five new hybrid-electric ferries, an overdue achievement that promises to eventually bring more reliability to cross-Sound ferry service.

Equinor, BP Cancel Contract to Sell Offshore Wind Power to New York

Equinor, BP Cancel Contract to Sell Offshore Wind Power to New York

European energy firms Equinor and BP  terminated their agreement to sell power to New York state from their proposed Empire Wind 2 offshore wind farm, citing rising inflation, higher borrowing costs, and supply chain issues."This agreement reflects changed economic circumstances on an industry-wide scale and repositions an already mature project to continue development in anticipation of new

Vineyard Wind Supplies First Power to Grid

Vineyard Wind Supplies First Power to Grid

Copenhagen Infrastructure Partners and Avangrid said on Wednesday their joint venture Vineyard Wind began generating power for the first time, supplying five megawatts (MW) to the New England grid.The project is expected to have five turbines operating at full capacity in early 2024, the companies said.

Some Vineyard Wind Blades to be Removed After Quality Checks

Some Vineyard Wind Blades to be Removed After Quality Checks

GE Vernova will remove some turbine blades installed at the Vineyard Wind offshore wind farm off the coast of Massachusetts following quality checks prompted by the failure of a blade in July, the company said on Wednesday.Progress on the still-unfinished project is being closely watched since it was barred from producing power or completing construction after a turbine blade broke and sent

GE Vernova Says Offshore Wind Turbine Blade Failures Are Unrelated

GE Vernova Says Offshore Wind Turbine Blade Failures Are Unrelated

GE Vernova on Friday said recent turbine blade failures at two offshore wind farms in the United States and the United Kingdom are unrelated.The statement comes as the company has been grappling with fallout from three separate blade accidents in four months.The most recent occurred on Aug.

US Offshore Wind Farm Shut Down After Turbine Debris Fouls Beaches

US Offshore Wind Farm Shut Down After Turbine Debris Fouls Beaches

The Vineyard Wind offshore wind project off the coast of Massachusetts is shut down until further notice while authorities investigate a turbine blade failure that caused debris to wash up on beaches, a federal agency said on Tuesday.The U.S. Bureau of Safety and Environmental Enforcement (BSEE) said it was working closely with Vineyard Wind to determine the cause of the incident

Gulf Craft Delivers CTV for WINDEA

Gulf Craft Delivers CTV for WINDEA

Franklin, La. shipbuilder Gulf Craft in December delivered WINDEA Intrepid, a new crew transfer vessel built for WINDEA CTV, a partnership between Hornblower Wind and MidOcean Wind.Designed by Incat Crowther and classed by Bureau Veritas, the 30-meter-long aluminum catamaran has capacity to carry 24 technicians, plus six crew.

St Johns Ship Building Delivers First CTV for WINDEA

St Johns Ship Building Delivers First CTV for WINDEA

Palatka, Fla. shipyard St. Johns Ship Building announced it has delivered WINDEA Courageous, the first of three Jones Act compliant crew transfer vessels (CTV) ordered by WINDEA CTV, a partnership between Hornblower Wind and MidOcean Wind.The 30-meter-long WINDEA Courageous and its sister vessels are designed by Incat Crowther and each have capacity to carry 24 technicians, plus six crew.