HOWELL GUIDRY

  • General
    • Vessel Name : HOWELL GUIDRY 0
    • Operator : E & L ENTERPRISES, INC. 0
    • Ships Type (ICST) : 431 0
    • Vessel Type : 36 0
    • Construction : A 0
  • Engine
    • Horsepower rating : 325 0
  • Location
    • City : GALLIANO 0
    • STATE : LA 0
  • Capacity
    • Net Tonnage : 15 0
  • Size
    • Register length : 41.9 257
    • Regular Breadth : 12.4 257
    • Overall Length : 41.9 257
    • Overall Breadt : 12.4 257
    • Load draft : 6.6 257
    • Light Draft : 4.5 257
    • Height : 18 257
  • Other
    • Year : 1962 0
    • EQUIP1 : NONE 0
    • Coast Guard Number : 288120 0

E & L ENTERPRISES, INC.

  • Area of Operation : BAYOU LAFOURCHE - GALLIANO TO FOURCHON 0
  • Principal Commodity : TOWING 0

News

Bisso Towboat Christens Tractor Tug Mr. Brian

Bisso Towboat Christens Tractor Tug Mr. Brian

Bisso Towboat Co., Inc. officially christened the M/V Mr. Brian on December 5, 2024, on the Mississippi River while docked at Woldenburg Riverfront Park at the Audubon Aquarium of the Americas.The Mr. Brian is a 100’ x 38’ x 13.5’ ASD Tractor Tugboat and was officially christened with a bottle breaking at 5:00 pm followed by a reception at the Audubon Aquarium - River Terrace Room.The Mr.

Texas A&M Training Ship Rescues Three People Adrift at Sea

Texas A&M Training Ship Rescues Three People Adrift at Sea

Texas A&M Maritime Academy's training ship came to the aid of a small vessel disabled and in distress drifting in the central Gulf of Mexico.While traveling from Texas to Florida aboard TS Kennedy, cadets William Flores and Kai Ethridge spotted the stricken vessel near daybreak during their morning watch.“Shortly after sunrise, a small black object was spotted in the distance.

Con Edison, NGV Propose Offshore Wind Project for New Jersey

Con Edison, NGV Propose Offshore Wind Project for New Jersey

Con Edison Transmission and National Grid Ventures submitted a plan to carry offshore wind power to New Jersey's electric grid as the state aims to meet renewable energy goals, according to a press release on Thursday.If awarded, the 'Garden State Energy Path' proposal involves building transmission infrastructure that would be operational by early 2029 and deliver about six gigawatts (GW) of