HELEN LAY

  • General
    • Vessel Name : HELEN LAY 0
    • Operator : LAY LEASING, INC. 0
    • Ships Type (ICST) : 432 0
    • Vessel Type : 35 0
    • Construction : A 0
  • Engine
    • Horsepower rating : 5600 0
  • Location
    • City : PADUCAH 0
    • STATE : KY 0
  • Capacity
    • Net Tonnage : 153 0
  • Size
    • Register length : 137.5 257
    • Regular Breadth : 35 257
    • Overall Length : 137.5 257
    • Overall Breadt : 35 257
    • Load draft : 9 257
    • Light Draft : 9 257
    • Height : 42 257
  • Other
    • Year : 1991 0
    • EQUIP1 : NONE 0
    • Coast Guard Number : 978178 0

LAY LEASING, INC.

  • Area of Operation : MISSISSIPPI, ILLINOIS AND OHIO RIVERS 0
  • Principal Commodity : TOWING GENERAL CARGO 0

CALEB LAY

  • Type : 35 0
  • Construction : A 0

News

Pakistan Prepares for Talks on Ending Iran War

Pakistan Prepares for Talks on Ending Iran War

Pakistan said on Sunday it was preparing to host "meaningful talks" to end the conflict over Iran in coming days even though Tehran earlier accused Washington of preparing a land assault while seeking negotiations.Speaking after talks between regional foreign ministers, Pakistan's Foreign Minister Ishaq Dar said they had covered possible ways to bring an early and permanent end to the war in the

US Navy Says Escorts Not Possible but Destroys Mine-Layers

US Navy Says Escorts Not Possible but Destroys Mine-Layers

The U.S. Navy has refused near-daily requests from the shipping industry for military escorts through the Strait of Hormuz since the start of the war on Iran, saying the risk of attacks is too high for now, according to sources familiar with the matter.The Navy's assessments spell continued disruption to Middle East oil exports and reflect a divergence from President Donald Trump’s statements

Orange Marine Orders Two More Cable Laying and Repair Vessels from Vard

Orange Marine Orders Two More Cable Laying and Repair Vessels from Vard

Norwegian ship designer and builder VARD has secured on order from France’s Orange Marine for two additional cable laying and repair vessels of the VARD 9 03 design, to be built at Colombo Dockyard in Sri Lanka.The vessels will be based on the same design as CS Sophie Germain, delivered to Orange Marine in July 2023.

OMS Group Enlists Ulstein to Build Two Next-Gen Cable Layers

OMS Group Enlists Ulstein to Build Two Next-Gen Cable Layers

Subsea services provider OMS Group has signed contracts with Ulstein for the design and construction of two cable laying vessels (CLVs).The vessels will be designed by Ulstein Design & Solutions and constructed at Ulstein Verft, with delivery planned for 2028. Each vessel will be about 130 meters long and 22 meters wide, with cable capacity of up to 6,500 tonnes and accommodation for 75 people.

Shipbuilding is Full Speed Ahead at RMC in Finland

Shipbuilding is Full Speed Ahead at RMC in Finland

For Rauma Marine Constructions (RMC), the year has had a strong start. Today, a significant milestone was reached in the Squadron 2020 project with the start of production of the fourth multi-purpose corvette and the keel-laying of the third one. This also means that all four multi-purpose corvettes of Pohjanmaa class -- ships that measure 117 x 16.

Equinor Halts Activities on Empire Wind Project After US Stop-Work Order

Equinor Halts Activities on Empire Wind Project After US Stop-Work Order

Equinor said it is complying with a stop-work order issued by the U.S. Department of the Interior’s Bureau of Ocean Energy Management (BOEM), which ordered the suspension of offshore construction activities on the Empire Wind project citing national security concerns.Empire Offshore Wind LLC, the project company

Saipem Milestone in Guyana Yellowtail Project

Saipem Milestone in Guyana Yellowtail Project

Saipem reports it has successfully completed its designated scope of work for the development of the Yellowtail field, operated by ExxonMobil Guyana Ltd., locatedin approximately 1,800m of water within the Stabroek Block offshore Guyana.Awarded the contract in 2022, Saipem undertook the Engineering, Procurement, Construction, and Installation (EPCI) of the Subsea Umbilical, Riser

All Inter-Array Cables Installed at 488 MW French Offshore Wind Farm

All Inter-Array Cables Installed at 488 MW French Offshore Wind Farm

The final inter-array cable has been installed at Îles d’Yeu and Noirmoutier (EMYN) offshore wind farm in France, being developed by Les Éoliennes en Mer Services.The 61st and final inter-array cable was installed on June 22 at the EMYN offshore wind farm, Louis Dreyfus TravOcean said on social media.The accomplishment paves the way for a transmission capacity of 512 MW.

Iran Must Take Control of the Strait of Hormuz, says Former Iranian Minister

Iran Must Take Control of the Strait of Hormuz, says Former Iranian Minister

Former Iranian Economy Minister Ehsan Khandouzi has said that tankers and LNG cargoes should only transit the Strait of Hormuz with Iranian permission and this policy should be carried out from "tomorrow [Wednesday] for a hundred days."It was not immediately clear whether Khandouzi was echoing a plan under theIranian establishment's consideration or sharing his personal opinion.

UK's Prince William Calls for Urgent Action to Protect Oceans

UK's Prince William Calls for Urgent Action to Protect Oceans

Britain's Prince William on Sunday called on world leaders and businesses to take urgent action to protect the planet's oceans, saying it was a challenge "like none we have faced before."Speaking ahead of the U.N. Ocean Conference, which begins in France on Monday, William said rising sea temperatures

Death Toll from Blast at Iranian Port Rises to 40

Death Toll from Blast at Iranian Port Rises to 40

The death toll from a powerful explosion at Iran's biggest port of Bandar Abbas has risen to at least 40, with more than 1,200 people injured, state media reported on Sunday, as firefighters worked to fully extinguish the fire.Saturday's blast took place in the Shahid Rajaee section of the port, Iran's biggest container hub, shattering windows for several kilometres around

KAUST Research Vessel Keel Laid at Freire Shipyard

KAUST Research Vessel Keel Laid at Freire Shipyard

The keel laying of the new research vessel, Thuwal II, for the King Abdullah University of Science and Technology (KAUST) at the Freire Shipyard marks the beginning of a new chapter in marine research in Saudi Arabia, driving innovation in this crucial field for the country. The contract for the newbuild was announced in August 2024.