EE

  • General
    • Vessel Name : EE 0
    • Operator : CAPITAL SAND CO. 0
    • Ships Type (ICST) : 341 0
    • Vessel Type : 43 0
    • Construction : A 0
  • Engine
  • Location
    • City : N. JEFFER- SON CITY 0
    • STATE : MO 0
  • Capacity
    • Net Tonnage : 380 0
    • Full Load Capacity : 1200 232
  • Size
    • Register length : 195 257
    • Regular Breadth : 35 257
    • Overall Length : 195 257
    • Overall Breadt : 35 257
    • Load draft : 9.6 257
    • Light Draft : 2 257
    • Height : 12 257
  • Other
    • Year : 1971 0
    • EQUIP1 : NONE 0

CAPITAL SAND CO.

  • Area of Operation : MISSOURI RIVER MILE 0 TO 317.0 0
  • Principal Commodity : SAND 0

ALLISON MARIE

  • Type : 36 0
  • Construction : A 0

HALLE KATE

  • Type : 36 0
  • Construction : A 0

MARGE I

  • Type : 36 0
  • Construction : A 0

TARKIO

  • Type : 36 0
  • Construction : A 0

BARGE

  • Type : 43 0
  • Construction : A 0

CGB

  • Type : 43 0
  • Construction : A 0

DB 3

  • Type : 43 0
  • Construction : A 0

NO.

  • Type : 44 0
  • Construction : A 0

NO. CSC17

  • Type : 47 0
  • Construction : A 0

NO. CSC18

  • Type : 47 0
  • Construction : A 0

NO. CSC19

  • Type : 47 0
  • Construction : A 0

NO. CSC23

  • Type : 47 0
  • Construction : A 0

NO. CSC24

  • Type : 47 0
  • Construction : A 0

NO. CSC25

  • Type : 47 0
  • Construction : A 0

NO. L976

  • Type : 43 0
  • Construction : A 0

NO. M-152

  • Type : 47 0
  • Construction : A 0

RAE MARIE

  • Type : 47 0
  • Construction : A 0

News

Excelerate Energy taps Nord Gas for  Reliquefaction Retrofit

Excelerate Energy taps Nord Gas for Reliquefaction Retrofit

Nord Gas Solutions (NGS) has been awarded a contract to supply its Compact Reliquefaction System for a floating storage and regasification Unit (FSRU) retrofit project with Excelerate Energy (NYSE: EE). This is the second order Excelerate has placed with NGS for this type of vessel upgrade. The contract was booked in Nord Gas Solutions order book in Q3 2026.

IMO Sub-Committee on Ship Design and Construction Holds 12th Session

IMO Sub-Committee on Ship Design and Construction Holds 12th Session

The International Maritime Organization's Sub-Committee on Ship Design and Construction (SDC) held its 12th session at IMO Headquarters in London, January 19-23, and was chaired by Mr. Erik Tvedt (Denmark). Outcomes are summarized below:KEY OUTCOMESDraft workplan agreed to develop a safety framework for selected GHG-reducing technologiesActions to reduce underwater radiated noise from shipsDraft