CALADESI CONNECTION II

  • General
    • Vessel Name : CALADESI CONNECTION II
    • Operator : CALADESI ISLAND CONNECTION INC.
    • Ships Type (ICST) : Other Carriers (Specialized)
    • Vessel Type : Ferry
    • Construction : Fiberglass
  • Engine
    • Horsepower rating : 300
  • Location
    • City : DUNEDIN
    • STATE : FL
  • Capacity
    • Net Tonnage : 3
    • Full Load Capacity : 6 Short ton
    • Passenger Capacity : 51
  • Size
    • Register length : 40 Feet
    • Regular Breadth : 12 Feet
    • Overall Length : 40 Feet
    • Overall Breadt : 12 Feet
    • Load draft : 3 Feet
    • Light Draft : 2 Feet
    • Height : 10 Feet
  • Other
    • Rebuilt year : 2002
    • Year : 2002
    • EQUIP1 : NONE
    • Coast Guard Number : 940679
    • REBLT : *

CALADESI ISLAND CONNECTION INC.

  • Area of Operation : BAYS AND COASTLINE OF GULF OF MEXICO IN VICINITY OF DUNEDIN, FL
  • Principal Commodity : PASSENGERS

CALADESI CONNECTION I

  • Type : Ferry
  • Construction : Fiberglass

News

USS Nevada Shipwreck Located

USS Nevada Shipwreck Located

The wreck of one of the U.S. Navy's longest serving battleships has been found 15,400 feet beneath the surface about 65 nautical miles southwest of Pearl Harbor, researchers said Monday.The USS Nevada (BB-36), which served in two world wars over the course of a career that spanned more than three and a half decades, was discovered by underwater and terrestrial archaeology firm SEARCH, Inc.

US Postal Service Sending Mail on Ships

US Postal Service Sending Mail on Ships

The U.S. Postal Service is using ships for overseas transport as the number of commercial flights typically used to send mail abroad has plummeted due to the coronavirus pandemic. The agency said on April 23 that a first mail shipment bound for Europe departed JFK International Service Center in New York three days earlier and is being transported on a containership scheduled to arrive at the

HII Wins 1.5B Deal to Build 15th LPD for U.S. Navy

HII Wins 1.5B Deal to Build 15th LPD for U.S. Navy

Huntington Ingalls Industries (NYSE: HII) said that its Ingalls Shipbuilding division has received a $1.5 billion fixed-price-incentive modification to a previously awarded contract for the procurement of the detail design and construction of amphibious transport dock LPD 31. The ship will be the 15th in the San Antonio class and the second Flight II LPD.

Sunken Submarine USS Stickleback Found

Sunken Submarine USS Stickleback Found

A World War II era submarine sunk during a Cold War training exercise off the shores of Hawaii more than six decades ago has been discovered by a team of ocean explorers utilizing pioneering robotics and methods at the forefront of today's underwater technology.USS Stickleback (SS 415), lost in nearly 11,000 feet of water 62 years ago

USS Hershel 'Woody' Williams Commissioned

USS Hershel 'Woody' Williams Commissioned

The U.S. Navy commissioned its newest Expeditionary Sea Base, USS Hershel “Woody” Williams (ESB 4), during a ceremony Saturday, March 7, in Norfolk, Va.USS Hershel “Woody” Williams is optimized to support a variety of maritime-based missions and designed around four core capabilities: aviation facilities, berthing, equipment staging support, and command and control assets.

Containership Loses Steering After Engine Room Fire

Containership Loses Steering After Engine Room Fire

A containership lost steering off the coast of Mozambique on Monday after its crew put out an engine room fire on board the 680-foot vessel.Towage operator KOTUG International said two of its vessels responded after picking up a mayday call from the Marshall-Islands-flagged Em Oinousses, approximately 50 miles off the coast of Nacala, Mozambique, while en route from Maputo, Mozambique to Mombasa

Digitalization Key for Port Operators to Survive and Thrive

Digitalization Key for Port Operators to Survive and Thrive

As the demand for goods continues to rise, the need to move a higher number of containers quicker and more efficiently is also increasing with this. As a result, port operators are proactively seeking new ways to boost productivity, all while reducing costs to meet this demand.The emergence of the Industrial Internet of Things (IIoT) is a significant factor in convincing ports to adopt new

USN to Commission Destroyer Paul Ignatius

USN to Commission Destroyer Paul Ignatius

The U.S. Navy will commission its newest Arleigh Burke-class guided missile destroyer -- arguably the most successful shipbuilding series in naval history -- the future USS Paul Ignatius (DDG 117), during a ceremony July 27 at Port Everglades in Fort Lauderdale, FL.The ship is named in honor of Paul Robert Ignatius, who served in the U.S. Navy during World War II, and later during the Lyndon B.

Oil Recovered from WWII Shipwreck

Oil Recovered from WWII Shipwreck

Operations to recover oil from a World War II-era shipwreck are nearing completion after commencing on May 11, 2019 off the coast of Long Island, N.Y., the U.S. Coast Guard said on Thursday.The sunken vessel, Coimbra, was a supply ship owned by Great Britain that was torpedoed by a German U-boat off the coast of Long Island during World War II.

Floating Wind: Norway Seeks to Expand

Floating Wind: Norway Seeks to Expand

Norway will seek to open two areas for the construction of floating offshore wind parks, which combined could hold a turbine capacity of up to 3.5 gigawatts (GW), the Norwegian oil and energy ministry said.Norway has recently been seeking to develop wind power, both onshore and offshore.

Port of Virginia Posts its Busiest May

Port of Virginia Posts its Busiest May

Record cargo volumes are moving across The Port of Virginia and doing so with efficiency as a result of expanded container handling capacity at its two primary container terminals.In May, the port processed nearly 261,000 TEUs (twenty-foot equivalent units) making it the busiest May in the port’s history.

Seadrill Contract Backlog Reaches $1.9bln

Seadrill Contract Backlog Reaches $1.9bln

The deepwater drilling contractor Seadrill said that its contract backlog, as of May 23, 2019, totaled approximately $1.9 billion.The drilling services provider said it has added $130 million of additional backlog from March, including the AOD I award of a three year follow on contract with Saudi Aramco keeping the unit employed until June 2022, which adds approximately $82 million in backlog.