BR

  • General
    • Vessel Name : BR
    • Operator : TERRAL RIVER SERVICE, INC.
    • Ships Type (ICST) : Dry Cargo Deck Barge
    • Vessel Type : Flat / Deck Barge
    • Construction : Steel
  • Engine
  • Location
    • City : LAKE PROVIDENCE
    • STATE : LA
  • Capacity
    • Net Tonnage : 209
    • Full Load Capacity : 400 Short ton
  • Size
    • Register length : 120 Feet
    • Regular Breadth : 30 Feet
    • Overall Length : 120 Feet
    • Overall Breadt : 30 Feet
    • Load draft : 7.1 Feet
    • Light Draft : 7.1 Feet
    • Height : 7.1 Feet
  • Other
    • Year : 1969
    • EQUIP1 : NONE
    • Coast Guard Number : 522045

TERRAL RIVER SERVICE, INC.

  • Area of Operation : GIWW AND MISSISSIPPI RIVER
  • Principal Commodity : HARBOR TOWING AND ROCK, FERTILIZER

TRS

  • Type : Open Hopper Barge
  • Construction : Steel

AMY GATTLE

  • Type : Pushboat
  • Construction : Steel

AMY T

  • Type : Pushboat
  • Construction : Steel

ANNA MARIE

  • Type : Pushboat
  • Construction : Steel

CHRISTY T.

  • Type : Pushboat
  • Construction : Steel

EDNA T. GATTLE

  • Type : Pushboat
  • Construction : Steel

GLENNA M

  • Type : Pushboat
  • Construction : Steel

JOHN C. TERRAL

  • Type : Pushboat
  • Construction : Steel

JOHNNY M.

  • Type : Pushboat
  • Construction : Steel

KIM KING

  • Type : Pushboat
  • Construction : Steel

MARGUERITE L. TERRAL

  • Type : Pushboat
  • Construction : Steel

OLIVIA C

  • Type : Pushboat
  • Construction : Steel

RENEE T. WHATLEY

  • Type : Pushboat
  • Construction : Steel

SYDNEY T

  • Type : Pushboat
  • Construction : Steel

THOMAS M. GATTLE

  • Type : Pushboat
  • Construction : Steel

VIRGINIA RENEE

  • Type : Pushboat
  • Construction : Steel

CNC

  • Type : Covered Hopper Barge
  • Construction : Steel

ME

  • Type : Flat / Deck Barge
  • Construction : Steel

MM V

  • Type : Flat / Deck Barge
  • Construction : Steel

TERRAL

  • Type : Flat / Deck Barge
  • Construction : Steel

News

World’s First Zero-emission Cruise Ship Ordered

World’s First Zero-emission Cruise Ship Ordered

Northern Xplorer has signed a letter of intent (LoI) with Portuguese shipbuilder West Sea for the construction its maiden vessel, said to be the world’s first zero-emission cruise ship.West Sea intends to build the 250-passenger vessel at its facility in Viana do Costello north of Porto for expected delivery at the start of the 2025/2026 cruise season.

Ship Design: Zero-Emission Cruise Ship Concept Unveiled

Ship Design: Zero-Emission Cruise Ship Concept Unveiled

Northern Xplorer AS (NX) announced itszero-emission, luxury cruise concept, designed to feature 'clean' technologies including fully electric propulsion, battery energy storage, hydrogen fuel cells and auxiliary renewable energy supply (wind and solar power). Northern Xplorer will provide opportunities to travel ‘off the beaten track’

Bladt, Semco to Deliver Three 880MW Offshore Substations for CVOW Project

Bladt, Semco to Deliver Three 880MW Offshore Substations for CVOW Project

Danish offshore energy industry services firms Bladt Industries and Semco Maritime have been awarded a contract to deliver substations for Dominion Energy's Coastal Virginia Offshore Wind project in the U.S.The contract comprises three 880 MW offshore substations, which will be established in 2021-2025 and commissioned in 2026.

Dry Bulk: Heavy Rains Disrupt Shipping in Southeast Brazil

Dry Bulk: Heavy Rains Disrupt Shipping in Southeast Brazil

Heavy rainfall in southeastern Brazil has prompted miners including Vale SA to suspend some operations, they said on Monday, after downpours caused deadly floods in the northeast and threatened to delay harvests in the midwest.Rainfall is expected to remain heavy this week in most of top mining state Minas Gerais, after runoff closed roads and railways.

Gladding-Hearn Delivers Completely Refitted Ferry to Bermuda

Gladding-Hearn Delivers Completely Refitted Ferry to Bermuda

Resolute, one of two high-speed passenger catamarans delivered by Gladding-Hearn Shipbuilding, Duclos Corporation, to the Government of Bermuda, Ministry on Transport in 2002, has returned to service after a compete refit. In turn, the vessel’s sister ship, Serenity, has been delivered to the shipyard for the same types of upgrades — scheduled for completion by next March.

TSI Helps Marine Business Run Silent

TSI Helps Marine Business Run Silent

To help shipbuilders meet increasing demands to reduce the impact of noise on marine life, Técnicas y Servicios de Ingeniería, S.L (TSI) has obtained technology especially for the construction of ‘silent vessels’.In addition to environmental effects, the health of staff and the vessels themselves can also be affected by a loud ship.