ARCTIC GULL

  • General
    • Vessel Name : ARCTIC GULL
    • Operator : 3800189
    • Ships Type (ICST) : 432
    • Vessel Type : Pushboat
    • Construction : Steel
  • Engine
    • Horsepower rating : 730
  • Location
    • City : BETHEL
    • STATE : AK
  • Capacity
    • Net Tonnage : 47
  • Size
    • Register length : 42.8 Feet
    • Regular Breadth : 22.4 Feet
    • Overall Length : 42.8 Feet
    • Overall Breadt : 22.4 Feet
    • Load draft : 3.5 Feet
    • Light Draft : 2.5 Feet
    • Height : 35 Feet
  • Other
    • Year : 1982
    • EQUIP1 : NONE
    • Coast Guard Number : 648775

CORDOVA PROVIDER

  • Type : Flat / Deck Barge
  • Construction : Steel

STICKEEN

  • Type : Flat / Deck Barge
  • Construction : Steel

ARCTIC BEAR

  • Type : Tugboat
  • Construction : Steel

KRYSTAL SEA

  • Type : Tugboat
  • Construction : Steel

KUSKO SCOUT

  • Type : Pushboat
  • Construction : Steel

ALASKA PROVIDER

  • Type : Flat / Deck Barge
  • Construction : Steel

News

Arctic LNG 2 Partners Charter 14 LNG Carriers

Arctic LNG 2 Partners Charter 14 LNG Carriers

Russian gas giant Novatek has informed that its Arctic LNG 2 joint venture has entered into long-term charter agreements for 14 Arc7 ice-class LNG tankers.The Arctic LNG 2 partners have signed the charter agreements will SMART LNG, a joint venture established in September 2019 between NOVATEK and PAO Sovcomflot.

US Icebreaker Suffers Fire, Engine Failure

US Icebreaker Suffers Fire, Engine Failure

The U.S. Coast Guard Cutter Healy (WAGB-20) is making an early return to its Seattle homeport, and its future Arctic operations have been canceled after the 21-year-old medium icebreaker suffered a fire in one of its main propulsion motors last week.The electrical fire was reported at 9:30 p.m.

Canada's First Arctic and Offshore Patrol Ship Delivered

Canada's First Arctic and Offshore Patrol Ship Delivered

The first Arctic and Offshore Patrol Ship (AOPS), Harry DeWolf, was delivered to the Government of Canada on July 31, 2020, in Halifax, N.S.Built by Irving Shipbuilding, the new 6,615-metric-ton, 103.6-meter ship is the largest vessel ever built in Canada in a combat package as well as the largest Navy vessel built in the country in more than 50 years.

Canadian Shipyards Partner to Bid for Polar Icebreaker Build

Canadian Shipyards Partner to Bid for Polar Icebreaker Build

Two Canadian shipyards have joined forces in a bid for the contract to deliver the next polar icebreaker under Canada's National Shipbuilding Strategy (NSS).Seaspan Shipyards (Vancouver Shipyards Co. Ltd.) and Heddle Shipyards (Heddle Marine Service Inc.) announced Tuesday they will big as partners to build the Canadian Coast Guard’s future polar icebreaker to replace the decades old CCGS Louis S.

Unique Arctic Journey for Russian LNG Carrier

Unique Arctic Journey for Russian LNG Carrier

Sovcomflot's Arc7 ice-class Christophe de Margerie liquefied natural gas (LNG) carrier has made history by successfully transiting the Eastbound ice-covered part of the Northern Sea Route (NSR) in May, carrying LNG from Novatek's Yamal LNG project to China.The Russian vessel owner said the event marked the first time in the history of the shipping industry that a large-capacity vessel of this

Mammoet Lands its ‘Biggest Ever’ Contract at Arctic LNG 2 Project

Mammoet Lands its ‘Biggest Ever’ Contract at Arctic LNG 2 Project

Dutch heavy lift and transportation company Mammoet has said it has won its largest-ever contract at the Arctic LNG 2 project in Russia.Mammoet said Monday the contract was awarded by Technip-led joint venture NovArctic in cooperation with Saipem and NIPIgas. Under the contract, Mammoet will be responsible for unloading, transportation

USCG Polar Security Cutters: The History and Future

USCG Polar Security Cutters: The History and Future

The good news is that work has commenced on the first new heavy polar icebreaker for the United States Coast Guard in 43 years. The bad news is that when it enters service, projected to occur in FY2024, it will be the first new heavy polar icebreaker for the USCG in 47 years.Meanwhile, Russia has approximately 30 active polar icebreakers, including four that are nuclear powered.

SHI Wins Two Ice-class Tanker Order

SHI Wins Two Ice-class Tanker Order

South Korean shipbuilding giant Samsung Heavy Industries Co (SHI) has won a 187.5 billion-won (US$158 million) order to build a two ice-class oil tankers.According to a regulatory filing,  under the deal with a European shipper, Samsung Heavy will deliver two Aframax tankers by March 2022.

USCG PSC Equals meaningful Polar Presence

USCG PSC Equals meaningful Polar Presence

The Coast Guard needs a ship that can do more than just break ice; it needs a multi-mission ship to provide for the nation’s security, asserting its sovereign rights, and protecting its long-term economic interests.  That ship is the Polar Security Cutter.Since Russia cashed the check in 1867 for the purchase of Alaska the U.S. has been an Arctic nation.

UK Polar Research Vessel Named

UK Polar Research Vessel Named

The UK’s new polar research ship is being formally named the RRS Sir David Attenborough today (Thursday, September 26) by the Duke and Duchess of Cambridge and special guest Sir David Attenborough will be in attendance. A three-day public celebration, hosted at the shipyard by British Antarctic Survey and Cammell Laird

Seaborne Nuclear Power Plant Docks in Russia

Seaborne Nuclear Power Plant Docks in Russia

Russia's first-floating nuclear power plant has arrived to its permanent base near an isolated Russian town across the Bering Strait from Alaska, Russian state nuclear energy company Rosatom said on Saturday.Developed by Rosatom, the plant, known as "Akademik Lomonosov", set off on a 5,000 km (3,100 mile) journey on Aug. 23 through Arctic waters to reach the Chukotka region.

SHI to Build Arctic LNG Ship for Zvezda

SHI to Build Arctic LNG Ship for Zvezda

Russia's Zvezda Shipbuilding Complex has awarded the contract for the LNG carriers for the Arctic LNG 2 project to Samsung Heavy Industries (SHI). The South Korean company will also provide technical specifications and design documentation for the LNG carriers project.SHI will design LNG ships with 45 MW power capacity, enabling the safe transportation of LNG while breaking up to 2.