AMERICAN STAR

  • General
    • Vessel Name : AMERICAN STAR
    • Operator : JJC BOATS, INC.
    • Ships Type (ICST) : Passenger (Other)
    • Vessel Type : Excursion / Sightseeing Vessels
    • Construction : Aluminum
  • Engine
    • Horsepower rating : 1800
  • Location
    • City : CAPE MAY
    • STATE : NJ
  • Capacity
    • Net Tonnage : 64
    • Full Load Capacity : 50 Short ton
    • Passenger Capacity : 154
  • Size
    • Register length : 80.6 Feet
    • Regular Breadth : 24 Feet
    • Overall Length : 90 Feet
    • Overall Breadt : 24 Feet
    • Load draft : 9.5 Feet
    • Light Draft : 9 Feet
    • Height : 30 Feet
  • Other
    • Year : 1990
    • EQUIP1 : NONE
    • Coast Guard Number : 959543

JJC BOATS, INC.

  • Area of Operation : ATLANTIC OCEAN; DELEWARE BAY & INTERCOASTAL, SOUTHERN NEW JERSEY
  • Principal Commodity : PASSENGERS

ATLANTIC STAR

  • Type : Excursion / Sightseeing Vessels
  • Construction : Aluminum

DARK STAR

  • Type : Excursion / Sightseeing Vessels
  • Construction : Fiberglass

STARLIGHT

  • Type : Excursion / Sightseeing Vessels
  • Construction : Aluminum

News

Adm. Schultz Delivers State of the Coast Guard Address

Adm. Schultz Delivers State of the Coast Guard Address

U.S. Coast Guard Commandant Adm. Karl Schultz outlined his vision for the service Thursday during the State of the Coast Guard Address in Charleston, highlighting the organization’s top initiatives, accomplishments over the past year, and challenges facing the service today and on the road ahead.

Rand Logistics to Buy American Steamship Company

Rand Logistics to Buy American Steamship Company

New Jersey-based Rand Logistics announced it has entered into a stock purchase agreement to acquire rival Great Lakes shipping company American Steamship Company (ASC) from Chicago-based GATX Corporation for $260 million.Headquartered in upstate New York, ASC operates the Lakes' largest U.S.

US Icebreaker Polar Star Reaches Antarctica

US Icebreaker Polar Star Reaches Antarctica

The U.S. Coast Guard's sole heavy icebreaker arrived January 22 at McMurdo Station, following a 58-day transit from the United States. Cutter Polar Star (WAGB 10) departed its’ homeport of Seattle on November 26.This year marks the Polar Star’s 23rd journey to Antarctica in support of Operation Deep Freeze, an annual joint military service mission to resupply the United States Antarctic stations

Storm Beaches Merchant Ship in Israel

Storm Beaches Merchant Ship in Israel

A cargo ship drifted onto a beach in southern Israel on Thursday after heavy winds and stormy weather forced the vessel away from its anchor point near the port of Ashdod.The 90 meter-long Zelek Star was carrying cement and other goods from Greece to Israel when it was swept away and approached Oranim Beach, officials said.

AWT, Blount, Chartwell Sign Offshore Vessel Deal

AWT, Blount, Chartwell Sign Offshore Vessel Deal

U.S. offshore wind farm support company Atlantic Wind Transfers (AWT) has signed a multi-million-dollar, market-first order for two state-of the-art Chartwell 24 Crew Transfer Vessels (CTVs), developed by Chartwell Marine.The vessels, to be deployed in support of new wind farms off the East Coast, will be built by Blount Boats, with delivery scheduled for 2020."Meeting the demands of U.S.

USCG PSC Equals meaningful Polar Presence

USCG PSC Equals meaningful Polar Presence

The Coast Guard needs a ship that can do more than just break ice; it needs a multi-mission ship to provide for the nation’s security, asserting its sovereign rights, and protecting its long-term economic interests.  That ship is the Polar Security Cutter.Since Russia cashed the check in 1867 for the purchase of Alaska the U.S. has been an Arctic nation.

Aalund Named International Propeller Club's President

Aalund Named International Propeller Club's President

Niels Aalund was elected at the 93rd International Convention and Conference in New Orleans on October 17th.New Orleans, LA: Prominent maritime industry stakeholder Niels Aalund has been elected President of the International Propeller Club. Mr. Aalund will serve a two-year term, commencing from October 17th.

Fincantieri Fits New Midsection in Star Breeze

Fincantieri Fits New Midsection in Star Breeze

The most complex cruise ship lengthening ever undertaken is clipping along at Fincantieri’s Palermo yard.The final welding cut to Windstar Cruises’ Star Breeze was completed and  the ship’s 25.6-meter/84-foot prefabricated midsection was glided into place between the two halves in the drydock, an operation that took just half an hour.

US-flagged LNG Bunker Barge Launched

US-flagged LNG Bunker Barge Launched

America’s first offshore liquefied natural gas (LNG) barge has been launched for owner Q-LNG Transport, Mississippi shipbuilder VT Halter Marine announced on Wednesday.The Q-LNG 4000 barge, designed to carry 4,000 cubic meters of LNG, with dimensions of 324’ x 64’ x 32’.6”, will be operated as part of an articulated tug and barge (ATB) unit designed to meet the requirements of American Bureau of

OP/ED: The Jones Act is Worth Fighting For

OP/ED: The Jones Act is Worth Fighting For

The President says he wants to make American great again, so why is he trying to destroy the principal support system for America’s maritime industry? This week, we learned that President Trump is “seriously considering” issuing a broad waiver for the Jones Act, a critical law that requires domestic shipping in the U.S. to occur on ships that are built in the United States, fly the U.S.

VT Halter Wins Historic $746m CG Contract

VT Halter Wins Historic $746m CG Contract

VT Halter Marine of Pascagoula, MS has emerged the victor in one of the most prized and coveted shipbuilding contracts in recent memory, a $746m deal to build the Coast Guard's lead Polar Security Cutter. If two additional ship options are exercised, the total deal could approach $2B.The U.S. Coast Guard and U.S. Navy, through an Integrated Program Office (IPO), awarded VT Halter Marine Inc.

Fire Breaks out on USCG's Polar Star

Fire Breaks out on USCG's Polar Star

It seems the U.S. cannot do enough to fast-track the construction of its new icebreaking fleet, as the USCG announce last night that the 150-member crew of the U.S. Coast Guard Cutter Polar Star fought a fire at approximately 9 p.m. PST Feb. 10 that broke out in the ship's incinerator room about 650 miles north of McMurdo Sound, Antarctica.