ALFRED P. CENAC III

  • General
    • Vessel Name : ALFRED P. CENAC III
    • Operator : CENAC, AL TOWING, LLC
    • Ships Type (ICST) : Tugboat
    • Vessel Type : Tugboat
    • Construction : Steel
  • Engine
    • Horsepower rating : 1800
  • Location
    • City : HOUMA
    • STATE : LA
  • Capacity
    • Net Tonnage : 52
  • Size
    • Register length : 64.3 Feet
    • Regular Breadth : 27.7 Feet
    • Overall Length : 64.3 Feet
    • Overall Breadt : 27.7 Feet
    • Load draft : 8.3 Feet
    • Light Draft : 8.3 Feet
    • Height : 39 Feet
  • Other
    • Year : 2007
    • EQUIP1 : NONE
    • Coast Guard Number : 1211745

CENAC, AL TOWING, LLC

  • Area of Operation : INLAND AND INTRACOASTAL WATERWAY OF TEXAS, LOUISIANA, MISSISSIPPI AND ALABAMA
  • Principal Commodity : DIESEL, GAS, CRUDE OIL AND ASPHALT

ACT

  • Type : Other Liquid Cargo Barge Not Elsewhere Included
  • Construction : Steel

News

Dredgers Make Way for USNS Comfort in New York

Dredgers Make Way for USNS Comfort in New York

Dredgers are expediting operations in New York to make way for the U.S. Navy hospital ship USNS Comfort, which will dock in the epicenter of America's COVID-19 outbreak to assist hospitals that become overrun by the pandemic.Dredging contractor Donjon Marine Co., Inc. was contacted last week and asked to begin dredging Manhattan Cruise Terminal’s Berth 4 in anticipation of the arrival of the ship

Osage Takes Towboat Delivery from Master Marine

Osage Takes Towboat Delivery from Master Marine

Master Marine, Inc. has delivered a second towboat for Osage Marine Services, Inc. The newly built M/V Frank Mellor, like its sister ship, is a 67’ x 28’ vessel designed by Entech Designs, LLC. All USCG certificates for their Sub M compliance have been obtained.The towboat is powered by a pair of Laborde Products, S6R2-Y3MPTAW Mitsubishi 803 HP Tier III diesel marine engines to be operated at 1

Research Vessel Atair to be Commissioned this Spring

Research Vessel Atair to be Commissioned this Spring

A new liquefied natural gas (LNG) powered survey, wreck-search and research vessel built by German Naval Yards Kiel is currently undergoing installation and finishing works at Fassmer in Berne, Germany prior to being commissioned this spring.Ordered by the German Federal Maritime and Hydrographic Agency (BSH), the new research vessel will be homeported in Hamburg, replacing the previous Atair

Bath Iron Works Begins Building Next US Navy Destroyer

Bath Iron Works Begins Building Next US Navy Destroyer

Shipbuilder Bath Iron Works (BIW) has officially started construction of the future USS Louis H. Wilson Jr. (DDG 126), the U.S. Navy announced. The new warship will be the first Arleigh Burke-class destroyer built in the Flight III configuration at BIW.The milestone was marked by a ceremony on Tuesday at General Dynamics BIW's structural fabrication facility in Brunswick, Maine.

Future USS Delbert D. Black Completes Builders Trials

Future USS Delbert D. Black Completes Builders Trials

The future USS Delbert D. Black (DDG 119) completed builder’s trials February 22 after spending three days underway in the Gulf of Mexico, the U.S. Navy said. The trials were conducted by the shipbuilder, Huntington Ingalls Industries (HII), Ingalls Shipbuilding Division.The ship was previously underway for Alpha trials in December, and will be underway again in March for acceptance trials

IMO2020: Methanol Proves Promising

IMO2020: Methanol Proves Promising

When the clock strikes midnight on December 31, 2019, the maritime world enters a bold new era of emission reduction. With its growing fleet of methanol fueled ship and more than 60,000 hours of operating experience under its belt, Waterfront Shipping Company has a five-year headstart.

Keppel Delivers TSHD Sanderus to Jan De Nul

Keppel Delivers TSHD Sanderus to Jan De Nul

Keppel Offshore & Marine Ltd (Keppel O&M) delivered the 6000m3 Trailing Suction Hopper Dredger (TSHD) Sanderus to Jan De Nul Group.The Ultra-Low Emission vessel (ULEv) is the fourth dredger that Keppel O&M has delivered to Jan De Nul Group.According to a press release from the shipbuilder, this follows the delivery of three 3500m3 TSHDs earlier this year

Tsuneishi Wins First Order for TESS42

Tsuneishi Wins First Order for TESS42

Tsuneishi Shipbuilding Co, ship repair and manufacturing company in Japan, has received its first order from a shipowner in Japan for several 42,000-metric-ton log and bulk carriers Tsuneishi Economical Standard Ship (TESS) 42.The newly developed TESS42 follows the design concept of the TESS38 while improving transportation efficiency, with deadweight capacity increased by approximately 2

Kirby’s Secret Sauce

Kirby’s Secret Sauce

Another year; another major fleet takeover by Kirby Corporation. But the leader of the inland tank-barge sector is not growing for growth’s sake: a deeper look at the numbers shows a disciplined strategy at work.“Kirby is definitely the big gorilla in the inland barge market,” affirmed Jefferies analyst Randy Giveans.

World Navies: Taiwan develops indigenous combat capabilities

World Navies: Taiwan develops indigenous combat capabilities

Navies operate on a spectrum between deterrence and defense, to include offensive operation, support of foreign policy, and power projection to civil affair and humanitarian assistance and disaster response.  Many have constabulary responsibilities, and it could be argued that, with the exception of the largest navies

Vigor to Build Pair for LA Port Pilots

Vigor to Build Pair for LA Port Pilots

Shipbuilder Vigor said it has been awarded a contract from the Port of Los Angeles to build two 56’ pilot boats.The new vessels, designed by Camarc, will feature a twin chine heavy weather hull form for excellent seakeeping. The design accommodates multiple heavy fender systems facilitating safer pilot transfers in challenging weather. An articulated rescue davit provides man overboard recovery.

Tsuneishi Delivers First  LRI Tanker

Tsuneishi Delivers First LRI Tanker

Tsuneishi Shipbuilding Co, ship repair and manufacturing company in Japan, has delivered its first long-range-one (LRI) (77,000 DWT) Product/Chemical Tanker."This first ship was constructed at Tsuineishi Group (Zhoushan) Shipbuilding, Inc., the Group’s shipbuilding site in China," said a press statement.