AE

  • General
    • Vessel Name : AE
    • Operator : O-KAN MARINE REPAIR, INC.
    • Ships Type (ICST) : Open Dry Cargo Barge
    • Vessel Type : Open Hopper Barge
    • Construction : Steel
  • Engine
  • Location
    • City : LAKIN
    • STATE : WV
  • Capacity
    • Net Tonnage : 687
    • Full Load Capacity : 1505 Short ton
  • Size
    • Register length : 195 Feet
    • Regular Breadth : 35 Feet
    • Overall Length : 195 Feet
    • Overall Breadt : 35 Feet
    • Load draft : 9 Feet
    • Light Draft : 1.6 Feet
    • Height : 13.5 Feet
  • Other
    • Year : 1988
    • EQUIP1 : NONE
    • Coast Guard Number : 935364

O-KAN MARINE REPAIR, INC.

  • Area of Operation : OHIO RIVER
  • Principal Commodity : TOWING COMPANY

LILLI MARLENE

  • Type : Tugboat
  • Construction : Steel

PENNY P

  • Type : Pushboat
  • Construction : Steel

A

  • Type : Flat / Deck Barge
  • Construction : Steel

AO B

  • Type : Flat / Deck Barge
  • Construction : Steel

FS

  • Type : Open Hopper Barge
  • Construction : Steel

H

  • Type : Open Hopper Barge
  • Construction : Steel

News

23,756 TEU “MSC Gulsun" Transits Suez Canal

23,756 TEU “MSC Gulsun" Transits Suez Canal

Admiral Mohab Mameesh, Chairman of the Suez Canal Authority and Suez Canal Economic Zone, announced the successful transit of MSC GULSUN, the world’s largest container vessel, on its first trip through the New Suez Canal. The Panamanian ship transited the Canal with the northbound convoy, heading to North Western Europe from the Port of XINGANG.

OET Gets Loan for Two Suezmax Newbuilds

OET Gets Loan for Two Suezmax Newbuilds

Greece-based shipping company Okeanis Eco Tankers (OET) said it  has secured funding to finance the pre-delivery of two new ECO scrubber-fitted Suezmax tankers.The Greek tanker owner and operator said that it has secured commitment to a USD 45.9 million secured loan facility from Alpha Bank A.E. to finance 88.95% of the total pre-delivery yard installments for the vessel pair.

First Shore-to-Ship Cold Ironing Connection In Eastern Med

First Shore-to-Ship Cold Ironing Connection In Eastern Med

Eastern Mediterranean achieved reduced environmental footprint at the port of Killini, which on December 20th, 2018 held an inauguration event of the first pilot shore installation for the electrification of ships with an overwhelming ceremony that shed light to the endeavor that was accomplished by the EU co-funded Action ‘elemed’ and the shipping company Levante Ferries