ADELAIDE

  • General
    • Vessel Name : ADELAIDE
    • Operator : LAFARGE BUILDING MATERIALS, INC.
    • Ships Type (ICST) : Dry Cargo Covered Barge
    • Vessel Type : Covered Dry Cargo Barge
    • Construction : Steel
  • Engine
  • Location
    • City : RAVENA
    • STATE : NY
  • Capacity
    • Net Tonnage : 8512
    • Full Load Capacity : 17000 Short ton
  • Size
    • Register length : 420 Feet
    • Regular Breadth : 80 Feet
    • Overall Length : 420 Feet
    • Overall Breadt : 80 Feet
    • Load draft : 27 Feet
    • Light Draft : 5.6 Feet
    • Height : 63.6 Feet
  • Other
    • Year : 1963
    • EQUIP2 : PUMPS; BOOMS
    • EQUIP1 : ELECTRIC CEMENT
    • Coast Guard Number : 292097

LAFARGE BUILDING MATERIALS, INC.

  • Area of Operation : HUDSON RIVER, NEW YORK HARBOR, ATLANTIC COAST, LONG ISLAND SOUND, CAPE COD CANAL, BOSTON HARBOR, NEW HAVEN HARBOR, NEWARK BAY, C&D CANAL, DELAWARE & CHESAPEAKE BAYS, WILMINGTON (NC) HARBOR, ST. JOHN'S AND SAVANNAH RIVERS
  • Principal Commodity : BULK CEMENT

ALEXANDRA

  • Type : Covered Dry Cargo Barge
  • Construction : Steel

BECRAFT

  • Type : Covered Dry Cargo Barge
  • Construction : Steel

MARIA T

  • Type : Covered Dry Cargo Barge
  • Construction : Steel

News

Hull Fouling Spoils Australia-New Zealand Cruise

Hull Fouling Spoils Australia-New Zealand Cruise

Viking Cruises will compensate hundreds of passengers on its Orion cruise ship after cruisers were forced to stay on board and miss multiple stops because officials blocked port access due to marine growth on the ship's hull.The 930-guest capacity Viking Orion docked in Sydney on Wednesday, the final stop on what is normally a 15-day, 9-stop cruise of New Zealand and Australia.

Australia Gas Price Cap Boosts LNG Import Terminal Plans but Adds risk

Australia Gas Price Cap Boosts LNG Import Terminal Plans but Adds risk

Australia's plan to control domestic natural gas prices, which producers say will deter the development of new supply, is expected to boost the prospects for proposed LNG import terminals but potentially defeat the government's aim to cut energy bills.Parliament is set to pass legislation on Thursday to cap gas prices at A$12 per gigajoule (GJ) for a year and then require a "reasonable price"

Australia's First LNG Import Terminal Seen Ready by Late-2023

Australia's First LNG Import Terminal Seen Ready by Late-2023

Squadron Energy, the private company building Australia's first LNG import terminal, expects its Port Kembla facility in New South Wales to be ready to take its first gas shipment by the end of 2023, its commercial director said on Tuesday.Squadron Energy, owned by Australian mining billionaire Andrew Forrest