KIRBY OFFSHORE MARINE

  • Engineering District : 33 0
  • TSO Series Number : 4 0
  • Vessels
    • Tugboat : 5 0
    • Double Hull Tank Barge : 8 0
    • Deck Barge : 1 0
    • Dry Covered Barge : 2 0
    • Other Tank Barge : 1 0
    • Vessels List : PETREL, SEA EAGLE, SEA HAWK, SEA RAVEN, SEA ROBIN, ATC, JONATHAN, SUGAR EXPRESS, ASC, DBL, HUGH, TMI 0
  • Address
    55 WAUGH DR., SUITE 1000 HOUSTON TX 77007
  • Contact
    • Phone : 713-435-1000 0
55 WAUGH DR., SUITE 1000 HOUSTON TX 77007

Managed Vessels

PETREL

  • Type : 36 0
  • Construction : A 0

SEA EAGLE

  • Type : 36 0
  • Construction : A 0

SEA HAWK

  • Type : 36 0
  • Construction : A 0

SEA RAVEN

  • Type : 36 0
  • Construction : A 0

SEA ROBIN

  • Type : 36 0
  • Construction : A 0

ATC

  • Type : 43 0
  • Construction : A 0

JONATHAN

  • Type : 48 0
  • Construction : A 0

SUGAR EXPRESS

  • Type : 48 0
  • Construction : A 0

ASC

  • Type : 71 0
  • Construction : A 0

DBL

  • Type : 71 0
  • Construction : A 0

HUGH

  • Type : 71 0
  • Construction : A 0

TMI

  • Type : 71 0
  • Construction : A 0

Related News [KIRBY OFFSHORE MARINE]

Navigating the Stormy Seas of U.S. Offshore Wind

Navigating the Stormy Seas of U.S. Offshore Wind

Companies that once committed to investing in U.S. offshore wind infrastructure and supply chains are now scrapping their plans as the industry experiences significant challenges. These setbacks stem from project delays, soaring costs, and the potential loss of federal support under former President Donald Trump’s proposed policies.

Brazil’s President Authorizes Offshore Wind Development

Brazil’s President Authorizes Offshore Wind Development

Brazilian President Luiz Inacio Lula da Silva has signed into law a bill authorizing the development of offshore wind farms, a statement said late on Friday, a bid to strengthen the country's energy security and spark a wave of investment.The new law foresees incentives for the development of offshore energy projects in Brazilian territorial waters, the statement said.

BOEM Okays Maryland Offshore Wind Plans

The Bureau of Ocean Energy Management (BOEM) has announced its approval of the Construction and Operations Plan for the Maryland Offshore Wind project.This is the final approval needed for the project from BOEM following the Department of the Interior’s September 2024 Record of Decision.

Workboat 2024: A Ton of Energy

Workboat 2024: A Ton of Energy

There’s plenty to go around for everyone, no matter it comes from.I will admit that attending the 2024 Workboat Show in the Big Easy just ten days after settling into the MarineNews Editor’s chair (for this, the second time around) had my full attention. The event typically evokes the specter of drinking from the proverbial fire hose in routine times

Fire Breaks Out on Malta-Flagged Tanker Offshore Singapore

Fire Breaks Out on Malta-Flagged Tanker Offshore Singapore

The Maritime and Port Authority of Singapore (MPA) has reported a fire on a Malta-flagged tanker Med Atlantic in the East Johor Straits.The vessel is currently anchored and there is no disruption to vessel traffic in the area, MPA said, adding that all 22 crew had disembarked the vessel and were safe with no injuries.

First Offshore Wind Turbine Stands Tall at US Revolution Wind Project

First Offshore Wind Turbine Stands Tall at US Revolution Wind Project

The first 11 MW Siemens Gamesa offshore wind turbine, out of total 65 planned, has been installed at Ørsted’s 704 MW Revolution Wind offshore wind farm in the United States.Once in operation, Revolution Wind will have the capacity to generate 400 MW of clean power for Rhode Island and 304 MW for Connecticut, enough to power more than 350

Cyan Renewables to Buy MMA Offshore

Cyan Renewables to Buy MMA Offshore

Singapore's Cyan Renewables, which operates vessels for offshore wind farms, said on Thursday it will buy its Australian peer MMA Offshore for A$1.1 billion ($725.67 million), marking the largest take-private deal in this space in the Asia Pacific region.MMA shareholders will receive A$2.

All Inter-Array Cables Laid at Dogger Bank’s First 1.2GW Phase

All Inter-Array Cables Laid at Dogger Bank’s First 1.2GW Phase

Deme Offshore has laid all inter-array cables, manufactured by its partner Hellenic Cables, for the first phase of 3.6 GW Dogger Bank offshore wind farm in UK.More than 200 miles of 66KV inter-array cables have been successfully installed by delivery partners working on the construction of the world’s largest offshore wind farm.

First Foundation Installed for Coastal Virginia Offshore Wind

First Foundation Installed for Coastal Virginia Offshore Wind

Dominion Energy has announced that the first monopile foundation for the 2.6-gigawatt Coastal Virginia Offshore Wind (CVOW), the largest offshore wind farm under construction in the United States, has been installed approximately 29 miles off the Virginia Beach coast.The monopile was installed by the Orion, DEME Group's heavy lift vessel.

Marine News' 2024 US Shipbuilding Report

Marine News' 2024 US Shipbuilding Report

If nothing else, building vessels in the U.S. is a complicated business.In a session on the domestic shipbuilding marketplace, at Marine Money’s late-November 2023 conference held in New Orleans, Ben Bordelon, president and CEO of Bollinger Shipyards (with more than a dozen facilities, in Mississippi and Louisiana)

Kalypso, Royal IHC Partner to Build US' First Jones Act Cable Layer for Offshore Wind

Kalypso, Royal IHC Partner to Build US' First Jones Act Cable Layer for Offshore Wind

New York-based Kalypso Offshore Energy on Monday announced it is teaming up with Dutch marine technology group and shipbuilder Royal IHC to design and construct a Jones Act compliant cable lay vessel (CLV)—the first purpose-built for the U.S. offshore wind market.Under a newly signed letter of intent (LOI), the partners are working together to finalize contract

First US-built WTIV Charybdis Launched

First US-built WTIV Charybdis Launched

The United States' first Jones Act-compliant offshore wind turbine installation vessel (WTIV), Charybdis, was launched into the water at the Seatrium AmFELS shipyard in Brownsville, Texas.The 472-foot WTIV—the first and only to be constructed in the U.S.—is being built for Blue Ocean Energy Marine, a subsidiary of Dominion Energy, who announced the milestone on Monday.