APACHE CORPORATION

  • Engineering District : 32 0
  • TSO Series Number : 4 0
  • Principal Commodity List : OIL WORKERS & SUPPLIES (MINOR) 0
  • Area of Operation : LAKE AND HARBORS IN THE VICINITY OF MISSISSIPPI RIVER AND VENICE, LA IN PLAQUEMINES PARISH 0
  • Vessels
    • Offshore Supply Vessel : 2 0
    • Vessels List : MISS KRISTEN, MR. MAGEE 0
  • Address
    2014 W. PINHOOK ROAD SUITE 800 LAFAYETTE LA 70508
  • Contact
    • Phone : 337-232-1702 0
2014 W. PINHOOK ROAD SUITE 800 LAFAYETTE LA 70508

Managed Vessels

MISS KRISTEN

  • Type : 02 0
  • Construction : C 0

MR. MAGEE

  • Type : 02 0
  • Construction : C 0

Related News [APACHE CORPORATION]

Grimaldi Takes Delivery of Second Ammonia-Ready Car Carrier

Grimaldi Takes Delivery of Second Ammonia-Ready Car Carrier

Italian shipping firm Grimaldi Group has welcomed the second ammonia-ready pure car and truck carrier (PCTC), Grande Tianjin, from Shanghai Waigaoqiao Shipbuilding (SWS), a subsidiary of China State Shipbuilding Corporation Limited (CSSC).The delivery of a 9,000-car capacity PTCT built for Grimaldi Group also marks SWS's 600th vessel or offshore platform since its inaugural delivery, the 150

World’s First Green Ammonia Bunkering Operation Completed in Dalian

World’s First Green Ammonia Bunkering Operation Completed in Dalian

Sinobunker, one of COSCO Shipping’s subsidiaries, has completed the world’s first green ammonia bunkering operation at COSCO Shipping Heavy Industry’s Dalian terminal.The ammonia was sourced from the world’s largest green hydrogen and ammonia plant established by Envision in Chifeng and powered entirely by the world’s largest independent renewable energy system.

Yinson, PTSC Get $600M Contract for Vietnam-Bound FSO

Yinson, PTSC Get $600M Contract for Vietnam-Bound FSO

Yinson Production, via its joint venture PTSC South East Asia (PTSC SEA), has secured a lease and operate contract for a new floating storage and offloading (FSO) unit for Vietnam’s offshore Block B gas development.The contract was awarded by Phu Quoc Petroleum Operating Company (PQPOC), the operator of Blocks B 48/95 and 52/97, on behalf of state-run Petrovietnam.

LNG Canada Produces First LNG for Export

LNG Canada Produces First LNG for Export

The Shell-led LNG Canada facility has produced its first LNG for export in Kitimat, British Columbia, a spokesperson for the project confirmed on Sunday.The milestone comes in advance of the facility loading its first LNG export cargo, which LNG Canada said it remains on track to do by the middle of this year.

First of Its Kind LCO2 Barge Design Approved for U.S. Operation

First of Its Kind LCO2 Barge Design Approved for U.S. Operation

ABS awarded approval in principle (AiP) to Overseas Shipholding Group, Inc. (OSG), the parent company of Aptamus Carbon Solutions, for its preliminary design of a liquefied carbon dioxide (LCO2) barge.The development of the barge design is a core component of the Tampa Regional Intermodal Carbon Hub (T-RICH) project to receive

Evergreen Places $3.2B Order for 11 LNG Dual-Fuel Container Ships

Evergreen Places $3.2B Order for 11 LNG Dual-Fuel Container Ships

Taiwanese container shipping firm Evergreen Marine Corporation has ordered 11 new LNG dual-fuel container ships from South Korean and Chinese shipyards, whose combined worth is up to $3.2 billion.On February 12, Evergreen disclosed two orders for 11 container ships, each with a 24,000 TEU capacity.

MSC Baltic III Grounded, Crew Safe

MSC Baltic III Grounded, Crew Safe

Canada’s Marine Communications and Traffic Services received a MAYDAY on Saturday from the MSC Baltic III as it ran aground located approximately 12 nautical miles outside the entrance to Bay of Islands, Newfoundland and Labrador, Canada.The vessel reported a loss of power, and unable to secure an anchor in the adverse conditions, grounded in Wild Cove west of Lark Harbour.

Hapag-Lloyd Closes $4B Financing for 24 New Container Ships

Hapag-Lloyd Closes $4B Financing for 24 New Container Ships

Container shipping firm Hapag-Lloyd has secured long-term financing, in the amount of $4 billion, for 24 large container ships ordered in October 2024, with a combined capacity of 312,000 TEU.Around $900 million of the purchase price will be financed using the company’s own funds. A total of $500 million will be made available from two banks in the form of bilateral mortgage loans.

$2.9B Maritime Development Fund Created by India

$2.9B Maritime Development Fund Created by India

India is set to establish a 250-billion-rupee ($2.9 billion) maritime development fund to provide long-term financing for the country's shipbuilding and repair sector, Finance Minister Nirmala Sitharaman announced on Saturday.The initiative aligns with Prime Minister Narendra Modi’s vision of transforming India into a developed nation by 2047.

MOL Takes Delivery of Environmentally Friendly Multi-Purpose Vessel (Video)

MOL Takes Delivery of Environmentally Friendly Multi-Purpose Vessel (Video)

The multi-purpose vessel Prima Verde, said to be the world’s first vessel able to run on marine gas oil (MGO) and wind assisted propulsion simultaneously, has been delivered.Operated by Mitsui O.S.K. Lines (MOL) company MOL Drybulk and owned by Daishin Shipping, the vessel), was delivered at Onomichi Dockyard.

Indian Government to Sell Up to 5% Stake in Cochin Shipyard

Indian Government to Sell Up to 5% Stake in Cochin Shipyard

The Indian government will offload a stake of about 5% in shipbuilder Cochin Shipyard COCH.NS, an exchange filing showed on Tuesday.The floor price for the sale is 1,540 rupees, an 8% discount to the stock's Tuesday close, the filing showed. At this price, the stake is valued at 20.26 billion rupees ($241.2 million).The base size of the offer will be 2.5%, amounting to about 6.

Noble Corporation Completes Diamond Offshore Acquisition

Noble Corporation Completes Diamond Offshore Acquisition

U.S.-based offshore drilling contractor Noble Corporation on Wednesday announced it has completed its acquisition of peer Diamond Offshore Drilling. The merger creates the industry's largest fleet of 7th generation dual-BOP drillships and adds 4.8 rig years and approximately $2 billion to the Noble backlog, which now stands at $6.7 billion.